Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-Finance | ₹10.3 L | L1 | Accepted-Finance Qualified for transparent lottery system. |
| 2 | L1₹10.3 LAccepted-Finance | ₹10.3 L | L1 | Accepted-Finance Qualified for transparent lottery system. |
| 3 | L1₹10.3 LAccepted-Finance AT LAXMINAGAR PO P R PETTA PS JEYPORE DIST KORAPUT | ₹10.3 L | L1 | Accepted-Finance Qualified for transparent lottery system. |
| 4 | L1₹10.3 LAccepted-Finance | ₹10.3 L | L1 | Accepted-Finance Qualified for transparent lottery system. |
| 5 | L1₹10.3 LAccepted-Finance | ₹10.3 L | L1 | Accepted-Finance Qualified for transparent lottery system. |
Tender Value
₹10.3 L
EMD Value
₹10,400
Closing Date
30 Mar 2026, 5:00 pmClosed
SE UKIDIVN, Borigumma,Dist-Koraput
Office of the Superintending Engineer, U.K.I.Division,Borigumma, Dist- Koraput, PIN 764056
Extension of Office building of U.K. Irrigation Division, Borigumma
2026_UPIDB_127464_1
SEUKID-05/2025-26 (SL01)
Open Tender
Civil Works - Buildings
Percentage
60 days
BORIGUMMA
AS PER DTCN
3 documents required · 3 mandatory
₹6,000
₹10,400
Yes
19 May 2026
20 Mar 2026
31 Mar 2026
20 Mar 2026
30 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling & removing Brick/stone masonry in cement mortar including stacking the use full materials for re-use, removing the debris away from the work site with all lead, lift & delift, labour charges with cess, T&P, scaffolding & other incidental charges etc. complete as per direction of the Engineer-In-Charge. | |||||
| 2 | Dismantling & removing the cement concrete, stacking the useful materials for re-use, making the surface clean from dirt, dust and other loose materials, removing the debries away from work site with all lead, lift & delift including labour charges with cess, T&P, scaffolding & other incidental charges etc. complete as per direction of the Engineer-In-Charge. | 1 | Cum | - | - |
| 3 | Excavation of foundation in all kinds of soil including dressing & leveling the bed and disposal of excavated materials within all leads, lifts & de-lefts & depositing in layers not exceeding 0.3M depth with rough dressing & breaking the clods to maximum 5cm to 7cm size clear out of work site including cess, labour charges and T&P etc. complete as per the direction of the Engineer-in-charge | 1 | Cum | - | - |
| 4 | Filling in foundation and plinth with sand watered and rammed with all lead, lift and de-lifts etc including cost conveyance ,royalty & all taxes of materials etc. complete as per the direction of the Engineer-in-charge | 1 | Cum | - | - |
| 5 | Providing cement concrete of M-15 grade using 40mm & down graded Crusher broken hard granite metal from approved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials with all leads, lifts, delifts including watering and curing , labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. | 1 | Cum | - | - |
| 6 | R.R stone masonary in C.M.(1:6) in Foundation and plinh with all lead, lift, de-lifts including cost, conveyance, royalty, cess & taxes of materials, carriage of water, curing etc. complete as per the direction of the Engineer-in-charge. | 1 | Cum | - | - |
| 7Brick masonry with W.B.C.B bricks 23x11x8 cm size in CM(1:6)in super structure with all lead, lift, de-lifts including cost, conveyance, royalty, cess & taxes of materials, carriage of water, curing etc. complete as per the direction of the Engineer-in-charge. | |||||
| 8Providing RCC work of M-25 grade with 20mm and down graded Crusher broken hard granite metal from approved quarry and of approved quality free from weathered skin & foreign materials mixing them properly using concrete mixer including laying in position and compacting by vibrators with all cost, conveyance, royalty& taxes of all materials with all leads, lifts, delifts including watering and curing , labour charges , cess & all T&P materials etc complete as per specification & as directed by the Engineer-In-charge. A. Column & Beam | |||||
| 9B. Plinth Band | |||||
| 10 | C. Lintel | 1 | Cum | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_585758.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
DTCN-1.pdf
Tender Documents • 1.40 MB
BOQ_585758.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].