Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.9 LAdmitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.9 L+₹3,716.48 (0.76%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹5.1 L+₹21,006.18 (4.28%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5.4 L
EMD Value
₹5,500
Closing Date
13 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E1/0350/2026 Dismantling and Re-Construction of Compound Wall at CBI Colony 2nd Main Road in Division- 182, Unit-41, Zone-14.
2026_CoC_691024_1
Z.O.XIV.C.NO.E1/0350/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹5,500
14 Aug 2026
5 Aug 2026
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the existing brick or stone masonry wo...uding carefully clearing the debris etc. complete. | 21 | CUM | 311.45 | ₹6,540.45 |
| 2 | Providing RCC 25cm (10") dia under reamed piles of...fications (excluding costof steel reinforcement). | 15 | NOS | 5,107 | ₹76,605 |
| 3 | Earth work excavation for foundation in all kinds ...lling the sides with excavated earth etc. complete | 4 | CUM | 151.3 | ₹605.2 |
| 4 | Supplying stone dust and filling in regular laye...ting etc. complete for foundation, basement, etc.. | 2 | CUM | 492.73 | ₹985.46 |
| 5 | Plain Cement concrete work 1:4:8 (1 cement, 4 Crus..., etc. complete for foundation, etc. upto basement | 2 | CUM | 5,616 | ₹11,232 |
| 6 | Supplying and erecting shuttering including necess...dia spaced at 75cmcentre to centre etc. complete. | 64 | SQM | 836.55 | ₹53,539.2 |
| 7 | Supplying and placing of Ready Mix M20 Graded of C...finishing etc as directed by departmental officers | 6 | CUM | 8,847 | ₹53,082 |
| 8 | Brick work using best quality II class Ground mou...tc complete complying with standard specification. | 19 | CUM | 7,612 | ₹1,44,628 |
| 9 | Supplying, fabricating and placing in position Rib...ngements for the supply of steel and binding wire) | 824 | KGS | 94 | ₹77,456 |
| 10 | Plastering with cement mortar 1:4 (1 cement and 4 ... sand)12mm thick including curing, etc., complete. | 206 | SQM | 283.76 | ₹58,454.56 |
stage.html
html • 0.02 MB
finance_830865.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
0350.pdf
Tender Documents • 1.69 MB
BOQ_830865.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .