| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹34.3 Laccepted-aoc | accepted-aoc |
Tender Value
₹42.0 L
EMD Value
₹84,000
Closing Date
16 Apr 2026, 11:00 pmClosed
Directorate of Municipal Administration
AEE CMC HOSAKOTE
DEVELOPMENT OF ROAD AND DRAIN WORK IN WARD NO 29 FROM KUSHI GURU KULAN TO GATTIGANABBE ROAD , GATTIGANABBE ROAD TO BACHCHANNA BISLAM ROAD ROASE GARD MAIN ROAD , SUNIL HOUSE , KEB SHIVANNA HOUSE ROADS UNDER HOSAKOTE CMC LIMIT
DMA/2025-26/OW/WORK_INDENT53604/CALL-3
DMA/2025-26/OW/WORK_INDENT53604/CALL-3
Open
Other Works
Two Tender Document System(Two Cover)
DMA City Municipal Council Hosakote
6 documents required · 6 mandatory
Executed in any one year,(for a continues period of 12 months) the following minimum quantities of work PCC/RCC153.60 CumTMT Steel5.63TonneWetmix /GSB 96CumBM/BC73.50Cum
Satisfactory completed, at least one similar work of value not less than Rs21.00 Lakhs as a prime contractor
Liquid assets and or availability of credit facilities of no less than Rs.12.60 Lakhs (Unconditional Credit lines/ letters of credit/ certificates from banks for meeting the fund requirement etc).
To qualify for award of this contract, each tenderer in its name should have in the last five years (2020-21 to 2024-25achieved in at least two financial years an average annual financial turnover of Rs.42.00.00 Lakhs
none
none
none
none
none
VALID KPWD CONTRACTOR REGISTRATION CERTIFICATE
none
GST Certificate
₹1,050
₹84,000
16 Apr 2026
1 Apr 2026
18 Apr 2026
13 Apr 2026
DEVELOPMENT OF ROAD AND DRAIN WORK IN WARD NO 29 FROM KUSHI GURU KULAN TO GATTIGANABBE ROAD , GATTIGANABBE ROAD TO BACHCHANNA BISLAM ROAD ROASE GARD MAIN ROAD , SUNIL HOUSE , KEB SHIVANNA HOUSE ROADS UNDER HOSAKOTE CMC LIMIT
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution li...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work KPWD SR-2023 -2024,Volume-3, P-17 Sl.No.3.1
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Compacting original ground supporting embankment :- Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth ...
Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on p...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Materia...
Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mecha...
Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. KPWD SR-20...
Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported t...
Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight ...
Repairs to Machinehole for different depths including removal of debris, levelling the brick masonry, construction of brick masonry upto Ground level, providing CC coping alround the MH cover, plaster...
Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
53604 CALL-3.doc
Tender Document • 1.82 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .