| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.9 LAccepted-AOC | L1 | Accepted-AOC Work Order Issued |
Tender Value
₹6.8 L
EMD Value
₹13,523
Closing Date
25 May 2022, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, PWD, Yanam
Chinta Street, PWD, Yanam
Repairs to Ayyanna Nagar Flood Regulator and strengthening Ring bund aside the regulator in Yanam
2022_PWDC2_10304_1
11/EEY/2022-23
Open Tender
Civil Works
Item Rate
60 days
Yanam
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹13,523
15 Jun 2022
20 May 2022
26 May 2022
20 May 2022
25 May 2022
20 May 2022
90 days
Amount
10.25.2 Steel work welded in built up sections / framed work, including cutting, hoisting, fixng in position and applying a priming coat of approved steel primer using Structural steel etc. as required – in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works .
5.2.2 Reinforced cement concrete work in walls(any thickness) , including attached pilasters, buttresses, plinth and sting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).
15.2.1 Demolishing cement concrete manually/by mechanical means including disposal of material within 50 metres lead - nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
13.16.1 6mm Cement Plaster of mx 1:3 (1 Cemnt: 3 fine sand)
5.9.2 Centering and shuttering including strutting, propping etc and removal of form for - Walls (any thickness) including attached pilasters, butteresses , plinth and string courses etc.
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with - cement mortar 1:6 (1 cement : 6 coarse sand).
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavation) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil.
30.11 Supplying with gravel for apron and revetment.
30.14 Dry stone pitching on slopes to required thickness and profile with hammer dressed garnite stones having no side less than 15 cum for revetment works, preparing surface etc., complete.
2.27 Supplying and filling in plinth with river sand under floors, including watering ramming consolidating and dressing complete.
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plith level - 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size).
5.22.6 Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (TISCON / VIZAG/ IISCO / SAIL / JSW) Fe - 415 or more.
2.28.1 Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m - all kinds of soil.
13.48.2 Painting wood work with deluxe multi surface paint of required shade. Two or more coat applied @0.90 ltr / 10sqm over an under coat of primer applied @ 0.75 ltr / 10 sqm of approved brand and manufacture.
Basic Code No. 0129 Engaging of sewer cleaner for removing sewage and complete as directed by the Engineer-in-charge.
Basic Code No. 0025 Hire Charges for engaging of excavator – 60 including cost of services of operating staff and supply of lubricating oil and fuel charges etc. complete as directed by the Engineer-in-charge.
30.9 Supplying and placing in position HDPE cement bags filled with sand for breach closing / diversion arrangement. The cost includes the cost of empty HDPE bags, labour charges for filling the bags and placing in position , removing the bags from site after completing the work etc., complete.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .