Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
1 Sept 2026, 5:00 pm4d left
Executive Officer
Nagarpalika Parishad Noorpur
Construction of ABR Buffled Reactor for Nala at Noorpur Chandpur Tiraha at PWD Guest House to Ban Nadi
2026_DOLBU_1176218_5
433/EO/2026-27
Open Tender
Solid Waste Management
Percentage
90 days
Nagarpalika Parishad Noorpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
E.O.
₹1.4 L
11 Aug 2026
11 Aug 2026
2 Sept 2026
11 Aug 2026
1 Sept 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation infoundation in ordinary soil (loam, clay or sand) including lift upto 1.50 M and lead up to 30 M including filing watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the enginner-in-charge upto a distance of 30 M from the foundation trenches. | 1 | Cum | - | - |
| 2 | Disposal of dismentling materail with cartage upto distance 3.00 Km i/c loading and unloading 80 % of item no-1 including supply of all material, labour and T&P etc. required for proper completion of work. | - | Cum | - | - |
| 3 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand and cement in proportion of 1:4:8 including supply of all material labour and T&P etc. required for proper completion. | 1 | Cum | - | - |
| 4 | M-150 brick work in 1:3 with cement, coarse, sand mortar including supply of all material, labour and T&P etc. required for proper completion. | - | Cum | - | - |
| 5 | Cement concrete with 4cm gauge approved stone ballast coarse sand and cement in proportion of 4:2:1 but with 2cm gauge stone grit instead of 4cm guage stone ballast including supply of all materials labour and T&P etc for proper completion of work. As per S.I No-279A ch-05 | - | Cum | - | - |
| 6 | 12mm thick Plaster in 1:3 with cement, coarse sand mortar including supply of all material, labour and T&P etc. required for proper completion of work. | - | Sqm | - | - |
| 7 | Supply and Fixing 10cm dia of PVC pipe 6kg/sq cm pressure. | - | Rmt | - | - |
| 8 | R.C.C work with cement approved coarse sand and 2cm, gauge approved stone grit in proportion of 1:1:5:3 in Raft foundation excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply ot all materials and labour and T&P etc. | - | Cum | - | - |
| 9 | R.C.C. work with cement approved coarse sand and 2cm, gauge approved stone grit in proportion of 1:1:5:3 in RCC Column excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour and T&P etc. | 1 | Cum | - | - |
| 10 | R.C.C. work with cement approved coarse sand and 2cm, gauge approved stone grit in proportion of 1:1:5:3 in RCC Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 B.W.G.G.I Binding wire and including necessary centering and shuttering etc. and supply of all materials, labour and T&P etc. | - | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.90 MB
BOQ_2210428.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].