Tender Value
₹1.5 Cr
EMD Value
₹3.0 L
Closing Date
3 Jul 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
DIVISION
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Technical Eligibility Criteria:--- (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii) One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. (Please refer Tender booklet for further clarification) Similar Nature of work - Any track works by manually or mechanical means involving deep screening or TSR or TRR or Casual Renewals or TWR or turnouts or dismantling of tracks etc.
4 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
As per tender document attached.
Tenderers may please note - During lockdown period (declared due to COVID - 2019 pandemic) - A) Necessary authority to travel to site of work on a specific request indicating date shall be issued by Railway Administration to facilitate site visit. B) TC meetings and Negotiation can be conducted through online Video/Audio chat on conference call. Record of same should be kept.
Miscellaneous P.way work under SSE(P.way) BDWD under ADEN AK jurisdiction.
DRMWBSL192026t4~CR
DRMWBSL192026t4
Open
Works - General
12 Months
Jalgaon, Maharashtra
₹0
₹3.0 L
3 Jul 2026
10 Jun 2026
19 Jun 2026
91 items across 1 schedule · ₹1,97,53,072.5 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | In all conditions and classifications of soil except rock | cum | 300.00 | 98.7 | 29,610 |
| 2 | Up to 40 m long rail panel | RM | 500.00 | 9.51 | 4,755 |
| 3 | More than 40 m long rail panel | RM | 400.00 | 15.04 | 6,016 |
| 4 | For Through Rail Renewal work | TRM | 5000.00 | 46.67 | 2,33,350 |
| 5 | For Casual/Scattered Rail Renewal work | RM | 200.00 | 36.96 | 7,392 |
| 6 | For Through Rail Renewal work | TRM | 5000.00 | 48.12 | 2,40,600 |
| 7 | For Casual/Scattered Rail Renewal work | RM | 200.00 | 39.13 | 7,826 |
| 8 | Locations other than Ballasted Deck Bridge | Each | 1600.00 | 492.23 | 7,87,568 |
| 9 | Ballasted Deck Bridge | Each | 210.00 | 581.53 | 1,22,121.3 |
| 10 | Through Fitting Renewal (TFR) on PSC track, comprising of renewal of Grooved Rubber Pads, Liners and ERCs without damaging PSC sleepers. Scope includes removal of all fittings, cleaning of rail seat, rail flange at liner seats, and eye of Inserts with wire brushes and applying Grease Graphite Grade "O" (IS:408) to eye of insert and central leg of ERC with contractor's grease of Railway's specification, fixing all fittings in correct position and sealing liner edges with grease all complete including collection and stacking of released materials at nominated locations within SSE Jurisdiction as directed by Engineer-in-Charge. Note: All the fittings will be supplied at SSE/Stores/Depot. | Sleeper | 19920.00 | 23.7 | 4,72,104 |
| 11 | For 1.00m long fishplates | Joint | 150.00 | 105.45 | 15,817.5 |
| 12 | For 610 mm long fish plates. | Joint | 200.00 | 71.37 | 14,274 |
| 13 | Opening and refixing of Joggled fish plates provided to weld joints/rail of any rail section under traffic to enable examination of weld/rail by departmental official nominated by Engineer In charge and lubrication of fishplates by applying departmental Grease graphite grade 'O' (IS:408) to fishing planes and bolts by departmental black oil as per procedure laid down in latest version of IRPWM, including all tools required and as directed by Engineer-in-charge. Note: 1. Grease Graphite, black oil, fish bolts, K.Oil, wire brush, required for work shall be given by department and issued at concerned SSE/PW Stores. 2.Jammed fish bolts shall be cut using chisel and hammer and replaced with new bolt. | Set | 3500.00 | 54.45 | 1,90,575 |
| 14 | Lubrication of ERCs and its liner contact area by removal of ERCs and Metal / GFN liners in rail panel, cleaning of rust / scale of ERC, Metal / GFN liners & SGCI insert by using wire brush, scrapper / sand emery paper etc supply and application of graphite grease, as prescribed by Railway for under side of liners & corresponding area of rail foot & SGCI insert with ERCs and re-fixing the same as per procedure prescribed in latest edition of IRPWM with contractors grease and all other tools & plants complete and as directed. Note: Each ERC in this item shall constitute 1 ERC and its Liner Contact area. | ERC | 400000.00 | 3.92 | 15,68,000 |
| 15 | Removing seized ERC from SGCI inserts of existing track by using suitable approved chemicals and re-fixing after greasing of insert eye and ERC with Contractor's grease of specified quality as per provisions of IRPWM, as directed by Engineer in-charge. Note: 1.List of Seized ERC along with location shall be prepared after inspection of SSE/P.Way and marked prior to execution of this item. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if SGCI insert is broken or sleeper gets cracked in the process. | ERC | 5000.00 | 48.89 | 2,44,450 |
| 16 | By using Contractor's Grease Graphite | Each | 10000.00 | 34.48 | 3,44,800 |
| 17 | GRSP | Each | 3500.00 | 21.58 | 75,530 |
| 18 | ERCs | Each | 7000.00 | 7.2 | 50,400 |
| 19 | Metal/GFN Liners | Each | 7000.00 | 4.8 | 33,600 |
| 20 | Renewal of seized Plate/Rail screws on PSC Sleepers by using gas or any approved methods, duly drilling holes in broken screw and removing existing screw pieces from the holes along with existing dowels and fixing new contractor's dowels (procured from RDSO approved sources) and grouting around dowel with Epoxy materials of approved specification and refixing new Railway's rail/Plate screws duly greasing the s c r e w w i t h specified grease with all contractor's materials, consumables, tools & plants, labour with all lead, lift. Note: 1.Seized screws shall be identified and marked by JE/P.Way and verified at minimum SSE/P.Way In charge) level. 2. Due care shall be taken to avoid any damage to the sleeper 3.A penalty of 50% of the basic cost of new sleeper in nearest sleeper factory shall be levied on each, if sleeper gets damaged in the process. | Each | 2000.00 | 265.86 | 5,31,720 |
| 21 | Rail section of 52Kg and above | Each | 2000.00 | 112.13 | 2,24,260 |
| 22 | Sleepers up to 2.85 m length | Each | 80.00 | 632.4 | 50,592 |
| 23 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 90.00 | 871.44 | 78,429.6 |
| 24 | Sleepers of more than 4.20 m length | Each | 130.00 | 1,373.66 | 1,78,575.8 |
| 25 | 1 in 8½ Switch Assembly | Set | 2.00 | 13,794 | 27,588 |
| 26 | 1 in 12 Switch Assembly | Set | 2.00 | 15,386.41 | 30,772.82 |
| 27 | For 1 in 12 Turnouts | Set | 15.00 | 5,240.13 | 78,601.95 |
| 28 | For 1 in 8.5 Turnouts | Set | 10.00 | 4,192.1 | 41,921 |
| 29 | Turnout sleepers of length up to 2.85 m | Each | 600.00 | 143.09 | 85,854 |
| 30 | Sleepers of length more than 2.85 m and up to 4.20 m | Each | 700.00 | 171.71 | 1,20,197 |
| 31 | Sleepers of length more than 4.20 m | Each | 700.00 | 186.02 | 1,30,214 |
| 32 | Depth of 200 mm below bottom of sleeper - For Plain Track : | TRM | 11.00 | 486.27 | 5,348.97 |
| 33 | Depth of 250 mm below bottom of sleeper - For Plain Track : | TRM | 100.00 | 536.59 | 53,659 |
| 34 | Depth of 300 mm below bottom of sleeper - For Plain Track : | TRM | 500.00 | 604.68 | 3,02,340 |
| 35 | Depth of 250 mm below bottom of sleeper for Turnouts | TRM | 240.00 | 858.54 | 2,06,049.6 |
| 36 | Depth of 300 mm below bottom of sleeper for Turnouts | TRM | 80.00 | 967.49 | 77,399.2 |
| 37 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 80000.00 | 27.33 | 21,86,400 |
| 38 | For PSC Sleeper Track with Sleeper Density of 1540 | TRM | 400.00 | 130.11 | 52,044 |
| 39 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 1030.00 | 143.12 | 1,47,413.6 |
| 40 | For PSC Sleeper Track with Sleeper Density of 1540 | TRM | 400.00 | 100.08 | 40,032 |
| 41 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 1030.00 | 110.09 | 1,13,392.7 |
| 42 | Packing of isolated loose PSC sleepers on plain track below the bottom of the sleepers and surrounding through out its length duly opening two galas on either side of the renewed sleepers and packing the sleeper to bring the track to normal speed including gauging, aligning, squaring of sleepers and sectioning of ballast to the required profile with all contractor's labour, tools and plant etc. including all lead and lift and crossing of tracks where ever necessary complete and as directed by the Engineer-in-charge. | Sleeper | 400.00 | 84.09 | 33,636 |
| 43 | Slack picking of joint sleepers and 3 approach sleepers on either sides giving required lift to make up general track level, packing and profiling as directed. | Each | 500.00 | 587.62 | 2,93,810 |
| 44 | Overhauling of fish plated / welded joint track sleepers including 3 approach sleepers on either sides up to 50mm below bottom of sleepers in crib & shoulder, replacing rounded ballast, recouping deficient ballast within 50m lead, replacement of worn-out fittings supplied by Railway, as directed as per procedure prescribed in latest edition of IRPWM. | Each | 100.00 | 1,321.05 | 1,32,105 |
| 45 | Without Rail tensor | TRM | 10000.00 | 34.21 | 3,42,100 |
| 46 | With Contractor's hard wood block. | Each | 200.00 | 2,238.05 | 4,47,610 |
| 47 | Cleaning of side drains along the track including disposing of muck beyond Railway boundary as per instructions of Engineer in- charge to keep drains clean and clear in cuttings etc. | RM | 25000.00 | 33.61 | 8,40,250 |
| 48 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line of track in mid section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM | 90000.00 | 15.47 | 13,92,300 |
| 49 | Trimming of tree branches coming within 6m of centre line of track & those obstructing views of Curves/LCs / Signal / Indicator at locations in section & station yard, as specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. Note: Girth of more than 20 cm will only be considered as tree branch. | Each | 200.00 | 177.84 | 35,568 |
| 50 | Making kutcha trapezoidal side drain of bottom width as 300mm and depth of 450mm in cutting section by excavation in all types of soil including utilising excavated muck for dressing of cess, slopes etc. in Railway land. | RM | 1800.00 | 132.55 | 2,38,590 |
| 51 | For 60 Kg Rails | RM | 10000.00 | 47.33 | 4,73,300 |
| 52 | For 60 Kg Rails | TRM | 2500.00 | 65.31 | 1,63,275 |
| 53 | For 52 Kg Rails | TRM | 4000.00 | 58.03 | 2,32,120 |
| 54 | Anti-corrosive painting to weld collar for Thermit welded rail joints on track or on cess for new welded joints to protect against normal corrosion for any rail section with two coats of ready mixed bituminous black paint of reputed make confirming to latest IS:9862 on welded area up to 10cm on either side including on the underside of rail foot by brush including surface preparation as per Railway's AT Weld Manual including lettering / weld numbering with approved enamel paint as directed Note: Before painting, dust, loose rust and mill scale and dirt shall be removed thoroughly by wire brushing. Scrubbing welded area with water to make it free from slag and other water soluble compounds to make it dry. | Each | 3500.00 | 19.66 | 68,810 |
| 55 | For day time block working | TRM | 25000.00 | 19.74 | 4,93,500 |
| 56 | Removing and refixing of guard Rails over slab bridges during machine packing with all contractor's men and materials duly removing fittings, leading guard rails to bridge approaches, lifting, dragging, positioning and crossing of track etc, and as directed by Engineer In charge. | TRM | 500.00 | 109.32 | 54,660 |
| 57 | 60 Kg - 110/90 UTS - Outside Track | Each | 110.00 | 216.45 | 23,809.5 |
| 58 | 60 Kg - 110/90 UTS - On Running Line | Each | 115.00 | 277.33 | 31,892.95 |
| 59 | On Running Line | Each | 375.00 | 69.89 | 26,208.75 |
| 60 | Sleeper Spacing, Re-spacing / Squaring of sleeper by Hydraulic Sleeper Spacer with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Hydraulic Sleeper Spacer shall be as per RDSO's Specification No. TM/SM/17, dated 31.03.1992. | Each | 1700.00 | 71.85 | 1,22,145 |
| 61 | For lead up to 500 metre. | MT | 600.00 | 399.09 | 2,39,454 |
| 62 | For lead beyond 500 metre and up to 1 Km. | MT | 200.00 | 514.73 | 1,02,946 |
| 63 | During period of traffic block | MT | 1510.00 | 30.54 | 46,115.4 |
| 64 | For lead up to 500 metres | MT | 400.00 | 310.74 | 1,24,296 |
| 65 | For lead beyond 500 metre and up to 1 Km | MT | 60.00 | 460.7 | 27,642 |
| 66 | Lead up to 5 Km | MT | 100.00 | 176.93 | 17,693 |
| 67 | Lead beyond 5 Km and up to 10 km | MT | 50.00 | 217.69 | 10,884.5 |
| 68 | Lead beyond 10 Km and up to 20 km | MT | 50.00 | 272.25 | 13,612.5 |
| 69 | Lead beyond 20 Km and up to 30 km | MT | 100.00 | 337.57 | 33,757 |
| 70 | Lead beyond 30 Km and up to 50 km | MT | 200.00 | 426.82 | 85,364 |
| 71 | Lead beyond 20 Km and up to 30 km | MT | 60.00 | 218.05 | 13,083 |
| 72 | Lead beyond 30 Km and up to 50 km | MT | 100.00 | 307.3 | 30,730 |
| 73 | Lead beyond 50 Km and up to 100 Km | MT | 60.00 | 498.57 | 29,914.2 |
| 74 | Lead beyond 100 Km and up to 150 Km | MT | 100.00 | 788.23 | 78,823 |
| 75 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 100.00 | 2.98 | 298 |
| 76 | From Truck / Trailer | MT | 603.59 | 86.59 | 52,264.86 |
| 77 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 2000.00 | 388.3 | 7,76,600 |
| 78 | All type of PSC sleepers | MT | 300.00 | 424.83 | 1,27,449 |
| 79 | P.Way fittings of all types and other similar loose items | MT | 80.00 | 402.25 | 32,180 |
| 80 | Clearing waterway of major & minor bridges by removing weeds / shrubs / bushes, removing silt deposit, filling scours, if any up to 10 metre from centre of bridge on either side including disposing waste and silt away from waterway. Note: Rate is for a single line and per metre of bridge span. | Metre | 900.00 | 222.3 | 2,00,070 |
| 81 | Caution Indicator Board of size 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 20.00 | 5,540.12 | 1,10,802.4 |
| 82 | Speed Indicator Board of equilateral triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long | Each | 65.00 | 4,791.62 | 3,11,455.3 |
| 83 | Termination Indicator Board of Circular shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long | Each | 20.00 | 6,611.39 | 1,32,227.8 |
| 84 | Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately) | Each | 250.00 | 1,013.1 | 2,53,275 |
| 85 | Supply and fixing in position pre-cast cement concrete Fouling Mark as per approved drawing at station yard, duly painting the top surface and slopes with white enamel paint in two coats and inscribed letters with black of Fouling Mark, complete in all respects with all labour, materials including cement, tools and plants etc. | Each | 50.00 | 458.68 | 22,934 |
| 86 | Fixing vertically the unserviceable PSC sleepers at locations of tress-passing, railway boundary or to make temporary store by excavating trench, fixing PSC sleeper in trench and filling back open trench. | Each | 500.00 | 156.47 | 78,235 |
| 87 | Supplying and spraying in specified proportion Weedicide Chemical, capable to kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in all respect. Scientific name of the chemical is Isopropylamine Salt of Glyphosate, in which active ingredient is Glyphosate (41%), colour is light amber to brownish, very low in toxicity and has favourable environmental characteristics. It will be ensured that no weed growth occurs up to six months period, otherwise re- spraying shall be done by the contractor free of cost. | Sqm | 150000.00 | 0.63 | 94,500 |
| 88 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 2000.00 | 752.64 | 15,05,280 |
| 89 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 500.00 | 889.42 | 4,44,710 |
| 90 | Manufacture and supply of Precast Kilometer Posts of size 1.15 x 0.50 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly making pits of size as required, painting the post, writing the letters on both sides of the post with 2 coats of enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items. | Each | 30.00 | 399.53 | 11,985.9 |
| 91 | Manufacture and supply of Precast gradient Posts of size 1.65 x 0.60 x 0.075 m in RCC 1:2:4 mix, engraving letters and leading to work spot, fixing in position with CC 1:3:6 concrete duly making pits of size as required, painting the post, writing the letters on both sides of posts in 2 coats with enamel paint of approved quality to the Railways drawings/IRPWM with contractor's materials, cement, steel, labour, tools, plant, with all lead and lifts etc., complete as per specifications and as directed by the Engineer-in-charge. Note: Excavation, Concrete and steel work will be paid under relevant items. | Each | 160.00 | 545.04 | 87,206.4 |
| Schedule total | ₹1,97,53,072.5 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .