Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.9 L+₹29,661.01 (5.26%)Rejected-Finance | L2 | Rejected-Finance l2 |
Tender Value
₹5.9 L
EMD Value
₹5,932
Closing Date
19 Apr 2026, 5:00 pmClosed
EXECUTIVE OFFICER RANPUR
OFFICE OF THE EXECUTIVE OFFICER RANPUR
DEVELOPMENT OF AKHANDALAMANI COMMUNITY CENTER
2026_ORULB_127994_11
RNP NAC -01/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
NAC RANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹5,932
Yes
1 Oct 2026
10 Apr 2026
20 Apr 2026
10 Apr 2026
19 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including, hoisting, laying hire charges of concrete misture, vibrator, watering, curing and cost of all materials and labour, T & P centering shuttering etc. complete but excluding cost of reinforcement complete.
Chajja | - | Cum | - | - |
| 2 | Roof Slab | 1.35 | Cum | 13,978.5 | ₹18,870.98 |
| 3 | Supplying and filling Sand in foundation and on Road Surface including watering and ramming with Cost, Conveyance and Royalty of all materials etc. allcomplete. | 2.83 | Cum | 8,351.52 | ₹23,651.5 |
| 4 | Laterite Stone Masonary in foundation & plinth in C.M.(1:6) ncluding watering, curring with Cost, Conveyance and Royalty of all materials etc. all complete. | 48.98 | Cum | 6,074.8 | ₹2,97,543.7 |
| 5 | 20mm thick C.P. in C.M (1:6) over brick masonary to the smooth surface including watering, curing, cost carriage, royalty and taxes of all material, cost of all labour, T & P etc. complete as per direction of E.I.C. | 314.18 | Sqm | 278.2 | ₹87,404.88 |
| 6 | Wall priming one coat with approved wall primer etc including cost of all materials, taxes & labour with T&P etc. complete in all floors as per the direction of E-I-C. | 414.18 | Sqm | 80.6 | ₹33,382.91 |
| 7 | Wall painting two coats with Plastic Emulsion Paint of approved shade & approved make to give an even shade etc including cost of all materials, taxes & labour with T&P etc. complete in all floors as per the direction of EIC. | 414.18 | Sqm | 104.2 | ₹43,157.56 |
| 8 | Supplying all materials, labour, T&P and providing Vetrified tiles in floors, treads and landing on 25mm thick bed of cement mortar 1:1 (1 cement:1 sand) joined with neat cement slurry mixed with pigment to match the shades of the tiles etc all complete as per direction of the E.I.C | 1 | Sqm | - | - |
| 9 | Cost of Display Signboard | - | LS | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_587566.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .