Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.5 L+₹18,569.50 (3.48%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
Refer Docs
EMD Value
₹5,500
Closing Date
14 Nov 2024, 2:00 pmClosed
Chief Engineer TTPS TTN 4
Office of the SE Civil TTPS TTN 4
Formation of Drain to Drain out the flood water away across the compound wall at Analmin Nagar
2024_EB_497583_1
CE SE C TTPS Spec. No 217 24 25
Open Tender
Civil Works - Others
Item Rate
60 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,500
Yes
22 Feb 2025
29 Oct 2024
15 Nov 2024
29 Oct 2024
14 Nov 2024
29 Oct 2024
Earth work excavation in all soils such as sand, silt or other loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil and depositing on bank with an initial lead of 10m and lift of 2m including cost of all materials, labours, lead, lift, etc. complete
Chipping the existing floor & wall concrete and roughening the surface for future bonding and through cleaning the surface including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing PCC 1:4:8 using OP/PP cement with 40mm size machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete.
Providing centering and shuttering using steel structures & props 10 to 13cm dia, including cost of all materials, labours, lead, lift, etc. complete.
Providing RCC 1:11/2:3 using OP/PP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work.
Supplying & providing RTS/MS rod including cutting, bending, tying and fixing in position as per specification including binding wires, cost of all materials, labours, lead, lift, etc. complete.
R.R Masonry in C.M 1:5 including cost of all materials, labours, lead, lift, curing, etc. complete.
Pointing with C.M 1:5, flush pointing for R.R masonry including cost of all materials, labours, lead, lift, curing, etc. complete.
Plastering with CM 1:3, 12mm thick for concrete surface including cost of all materials, labour, lead, lift, curing etc. complete.
Supplying and fabricating and forming in position of the new angle, channel & beam as directed carefully without any disturbance to other steel structure rate including cost of all materials, hire charges for welding and cutting machine, welding rods including labour, lead, lift, safety appliances etc., complete.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .