Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹440.5 CrAccepted-AOC NCC HOUSE MADHAPUR HYDERABAD 500081 TELANGANA INDIA TELEPHONE 040 23268730 | ₹440.5 Cr Quoted ₹768.9 Cr | L1 | Accepted-AOC Work Order Issued |
| 2 | L2₹802.4 CrRejected-AOC CORE 3 SCOPE COMPLEX 7 INSTITUTIONAL AREA LODHI ROAD NEW DELHI 110003 | SOUTH | DELHI | 110003 | ₹802.4 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹949.6 CrRejected-AOC CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹949.6 Cr | L3 | Rejected-AOC L3 |
| 4 | Rejected-Technical A 177 OKHLA INDUSTRIAL AREA PHASE I NEW DELHI 110020 | NEW DELHI | SOUTH EAST DELHI | DELHI | 110020 | - | - | Rejected-Technical Not-Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not-Qualified |
Tender Value
₹440.5 Cr
EMD Value
₹8.8 Cr
Closing Date
9 May 2022, 2:00 pmClosed
CE, PWD (Bldg), Assam, Chandmari, Ghy-3
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
Construction of Integrated Directorate Complex at Betkuchi, Guwahati, Assam.
2022_PWBNH_24486_1
CE/TB-IV/89/2021/7 Dated Guwahati 17th Feb 2022
Open Tender
Civil Works - Building
1275 days
Betkuchi
Please refer Tender documents.
6 documents required · 6 mandatory
₹12,500
Assam State Road Board Maintenance (Road) Fund
₹8.8 Cr
Yes
O/O The CE, PWD (Bldg), Assam, Chandmari, Ghy-3
28 Oct 2022
24 Feb 2022
9 May 2022
24 Feb 2022
9 May 2022
8 Mar 2022
7 Mar 2022
Amount
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Main Integrated Directorate Complex building complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, IS Codes and guidelines complete in all respect on EPC (design, build and handover) basis. The work shall be executed as per detailed Scope of Work/ DBR/ Technical specifications mentioned in NIT and as per direction of the Engineer-in-Charge. 1.1 Foundation work alongwith lift pit complete upto GF formation level as per structural design complete in all respect as per scope of work and direction of Engineer-in-charge. Note :- Plinth Area shall be measured for the actual constructed.
1.2 Superstructure above plinth Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and Execution of Construction of multistoried RCC framed structure buildings i.e, Canteen & Stores, Dormitory, Security office, residence, as per tender drawings complete including Planning, Designing, preparation of preliminary architectural & detailed working drawings, structural analysis & design by incoprating stipulated specification and adopting NBC-2016 norms, & IS Codes and guidelines complete in all respect on EPC (design, built and handover) basis. The work shall be executed as per detailed / Scope of Work/DBR/ Technical specifications / mentioned in NIT and as per direction of the Engineer-in-Charge. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and construction of Civil External development works, Under ground Sump, Horticulture & Landscape, Earth Cutting/ Filling Work, Boundary Wall with gate and guard room, water supply system, sewerage/effluent treatment plant, water treatment plant, Deep Tubewell, Sewage & drainage pump Plant Room as per detailed / Scope of Work/NMC Norms/DBR/ Technical specifications / drawings mentioned in NIT and as per direction of the Engineer-in-Charge.
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station, DG set, LED Street light, CCTV system For External Surveillance, BMS, Solar photo voltaic power generation system, Emergency Light and Illuminated digital signages, Boom barrier and Motorized steel gate with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Operation and Maintenance of Services HVAC WORK: Operation & maintenance (routine & preventive ) and breakdown maintenance of Air conditioning equipment installed in the building. Operation & Maintenance For 1st year (concurrently with DLP of 12 Months)
For 2nd year (after 1 year of defect liability period)
For 3rd year (after 2 year of defect liability period)
For 4th year (after 3 year of defect liability period)
For 5th year (after 4 year of defect liability period)
STP/ WTP/ ETP/ FIRE PUMP: Operation & comprehensive maintenance STP/ WTP/ ETP/ FIRE PUMP units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation & Maintenance For 1st year (concurrently with DLP of 12 Months)
For 2nd year (after 1 year of defect liability period)
For 3rd year (after 2 year of defect liability period)
For 4th year (after 3 year of defect liability period)
For 5th year (after 4 year of defect liability period)
Lifts: Operation & comprehensive maintenance of LIFT units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation & Maintenance For 1st year (concurrently with DLP of 12 Months)
For 2nd year (after 1 year of defect liability period)
For 3rd year (after 2 year of defect liability period)
For 4th year (after 3 year of defect liability period)
For 5th year (after 4 year of defect liability period)
ESS, DG SETS, TRANSFORMER: Operation & comprehensive maintenance of ESS, DG SETS units after three year warranty charges/ maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts (except fuel, power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation & Maintenance For 1st year (concurrently with DLP of 12 Months)
For 2nd year (after 1 year of defect liability period)
For 3rd year (after 2 year of defect liability period)
For 4th year (after 3 year of defect liability period)
For 5th year (after 4 year of defect liability period)
Engineering Projects India Ltd.
Larsen & Toubro
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid