| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.0 LAccepted-AOC NOT AVAILABLE | ₹49.0 L Quoted ₹32.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹35.8 LRejected-AOC NA | ₹35.8 L | L2 | Rejected-AOC L2 |
| 3 | L3₹38.2 LRejected-AOC HOUSE NO 35 EAST DURGA NAGAR AMBALA CITY | ₹38.2 L | L3 | Rejected-AOC L3 |
| 4 | L4₹43.5 LRejected-AOC AMBALA CANTT | ₹43.5 L | L4 | Rejected-AOC L4 |
| 5 | L5₹47.9 LRejected-AOC C O SH YASHU GUPTA SCF 51 HARMILAP NAGAR BALTANA MOHALLI | ₹47.9 L | L5 | Rejected-AOC L5 |
Tender Value
₹49.0 L
EMD Value
₹98,100
Closing Date
22 May 2026, 10:00 amClosed
Narender Kumar Payal
DIV 2 Panchkula
Construction of brick manhole for sewer in new building 02 Nos dressing room in Cricket Stadium Sector-3, Panchkula and Ashiana Sector -26 Panchkula Extension complete in all respect as per entire satisfaction of Engineer-in-charge (A/mtc of PH servi
2026_HBC_522119_1
20265EA62D57 A5A8 4722 9295 474C08E1A4CD270HSV
Open Tender
Civil Works
120 days
Panchkula
2 documents required · 2 mandatory
₹2,000
₹98,100
Yes
25 May 2026
16 May 2026
22 May 2026
16 May 2026
22 May 2026
16 May 2026
16 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. | 17.13 | cum | 1,863 | ₹31,913.19 | BI01010001010000000000000515BI0100001113 |
| 2 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) | 466 | Sqm | 139 | ₹64,774 | BI01010001010000000000000515BI0100001114 |
| 3 | [11.52]Cement rendering on plaster 1 mm thick | 466 | Sqm | 28 | ₹13,048 | BI01010001010000000000000515BI0100001115 |
| 4 | [21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge | 120 | Each | 298 | ₹35,760 | BI01010001010000000000000515BI0100001116 |
| 5 | [21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening | 30 | Each | 1,058 | ₹31,740 | BI01010001010000000000000515BI0100001117 |
| 6 | [21.98.3]`Providing, lowering, laying, aligning, fixing in position and jointing at all level/ depths ISI marked HDPE pipes of PE-100 grade and PN- 8 for sewer application as per IS 14333-1996 (amended up to date) in trenches in complete including cost of HDPE `Specials, labour, sectional hydro testing (including the cost and conveyance of water to site for testing) and commissioning as per Technical Specifications and as per direction of Engineer.
Note: E/w to be measured and paid separately. Rate includes cost of all specials like bends, tees required during laying of pipe line along required alignment.` 3. 250 mm Outside Dia. | 1,050 | Per Metre | 3,476 | ₹36,49,800 | BI01010001010000000000000515BI0100001118 |
| 7 | [4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. | 1,795.98 | cum | 83 | ₹1,49,066.34 | BI01010001010000000000000515BI0100001119 |
| 8 | [4.31.1]Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. 1. All kinds of soil | 2,461 | cum | 51 | ₹1,25,511 | BI01010001010000000000000515BI0100001120 |
| 9 | [6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 10.37 | cum | 3,476 | ₹36,046.12 | BI01010001010000000000000515BI0100001121 |
| 10 | [6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 12.58 | cum | 4,374 | ₹55,024.92 | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_601037.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid