Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.1 LAccepted-AOC AT PO RAMPUR COLLIERY PS BRAJRAJNAGAR DIST JHARSUGUDA ODISHA 768216 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768216 | ₹30.1 L | L1 | Accepted-AOC Accepted as Techno Commercially Evaluated L1 Bidder |
| 2 | L2₹30.9 LRejected-Finance AT LAMTIBAHAL PS BRAJRAJNAGAR DIST JHARSUGUDA PIN 768230 | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768230 | ₹30.9 L | L2 | Rejected-Finance Rejected as L2 Bidder |
| Sl No | Description | Qty | Unit | SANJAY SINGH L2 | MAA TARINI CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 54.75 | m³ | 7,250 ₹4.0 L | 7,061.99 ₹3.9 L |
| 2.00 | Providing and laying in position specified grade of Reinforced cement concrete excluding the cost of centering, shuttering, finishing, reinforcement and carriage of material from incline mouth to U/G mine site. All work up to plinth level, 1:1.5:3, ( 1 cement : 1.5 coarse aggregate : 3 graded stone aggregate 20mm nominal size. | 51.19 | m³ | 8,051 ₹4.1 L | 7,832.33 ₹4.0 L |
| 3.00 | Transportation , (Track line lead =0-1km, Manual lead = 0-50 mt.) | 51.19 | m³ | 11,620 ₹5.9 L | 11,300.99 ₹5.8 L |
| 4.00 | Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete excluding carriage of material from Incline mouth to U/G. mine site.Cold twisted Bar | 35.83 | Qtl | 9,690 ₹3.5 L | 9,437.33 ₹3.4 L |
| 5.00 | Transportation,(Track line lead =0-1km, Manual lead = 0-50 mt.) | 3,583.3 | kg | 19 ₹68,082.70 | 18.89 ₹67,688.54 |
| 6.00 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 17.56 | m³ | 7,040 ₹1.2 L | 6,851.33 ₹1.2 L |
| 7.00 | Transportation, (Track line lead =0-1km, Manual lead = 0-50 mt.) | 17.56 | m³ | 7,860 ₹1.4 L | 7,653.33 ₹1.3 L |
| 8.00 | P.C.C work | 20.63 | m³ | 8,050 ₹1.7 L | 7,832.33 ₹1.6 L |
| 9.00 | Transportation (Track line lead =0-1km, Manual lead = 0-50 mt.) | 20.63 | m³ | 11,610 ₹2.4 L | 11,299.33 ₹2.3 L |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing, bases of column etc. for mass concrete | 60.49 | mt | 405 ₹24,498.45 | 389.33 ₹23,550.57 |
Updated dates
Tender Value
₹37.6 L
EMD Value
₹47,100
Closing Date
31 Mar 2026, 5:00 pmClosed
STAFF OFFICER MINING
OFFICE OF GENERAL MANAGER ORIENT AREA, MCL, BRAJRAJNAGAR, JHARSUGUDA
Underground Stair Construction from 8L/1DN (Sec-C) to 7L/1DN (Sec-C1) to 1.5L/2DS (IB seam) in drift of IB Seam at HBM of RSA.
2026_MCL_356782_1
MCL/GM/OA/SOM/26/NIT283/2097
Open Tender
Civil Works - Others
112 days
HIRAKHAND BUNDIA MINES
Please refer Tender documents.
3 documents required · 3 mandatory
₹47,100
25 May 2026
16 Mar 2026
3 Apr 2026
17 Mar 2026
31 Mar 2026
17 Mar 2026
17 Mar 2026 - 20 Mar 2026
Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C.
Providing and laying in position specified grade of Reinforced cement concrete excluding the cost of centering, shuttering, finishing, reinforcement and carriage of material from incline mouth to U/G mine site. All work up to plinth level, 1:1.5:3, ( 1 cement : 1.5 coarse aggregate : 3 graded stone aggregate 20mm nominal size.
Transportation , (Track line lead =0-1km, Manual lead = 0-50 mt.)
Reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete excluding carriage of material from Incline mouth to U/G. mine site.Cold twisted Bar
Transportation,(Track line lead =0-1km, Manual lead = 0-50 mt.)
Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation
Transportation, (Track line lead =0-1km, Manual lead = 0-50 mt.)
P.C.C work
Transportation (Track line lead =0-1km, Manual lead = 0-50 mt.)
Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing, bases of column etc. for mass concrete
Carting of coal/shaly coal
Transportation of rail (Track line lead =0-1km, Manual lead = 0 -50 mt.)
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.71 MB
Tendernotice_2.pdf
PDF • 1.46 MB
BOQ_369644.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid