Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance | ₹8.2 L | L1 | Admitted-Finance |
| 2 | L2₹8.4 LAdmitted-Finance M S ASHAPURI INFRACON PVT LTD VILLAGE AND PO HURLA TEHSIL BHUNTER DISTT KULLU H P | ₹8.4 L | L2 | Admitted-Finance |
| 3 | L3₹8.5 LAdmitted-Finance VILLAGE DAK P O DAHAB TEHSIL FATEHPUR DISTT KANGRA H P 176051 | DAHAB | KANGRA | HIMACHAL PRADESH | 176051 | ₹8.5 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-DD FDR in physical form not submitted in office. |
| Sl No | Description | Qty | Unit | Sunil Sharma Govt contractor L1 | VIKAS SHARMA L2 | MUNISH KUMAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 418 | Cum | 150 ₹62,700 Lowest | 280 ₹1,17,040 | 300 ₹1,25,400 |
| 2.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost ofcentering, shuttering, finishing and reinforcement - Allwork up to plinth level:1:1.5:3 (1 cement: 1.5 coarse sand): 3graded stone aggregate 20 mm nominal | 62.7 | Cum | 5,900 ₹3,69,930 | 5,200 ₹3,26,040 Lowest | 5,500 ₹3,44,850 |
| 3.00 | Steel reinforcement for R.C.C. work includingstraightening, cutting, bending, placing in position and binding all complete upto plinth level. | 5,016 | kg | 78 ₹3,91,248 | 80 ₹4,01,280 | 75 ₹3,76,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹19,350
Closing Date
17 Mar 2026, 6:00 pmClosed
Commissioner
Municipal Corporation Una
ReConstruction of Slab over the drain in govind Nagar from bharat medical store to Sh. Ramesh Seth House, MC Una.
2026_UDDHP_130543_3
MCorp/Una/2025-26/437-440 dated 13.02.26
Open Tender
Civil Works
Item Rate
Municipal Corporation Una
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Commissioner
₹19,350
21 Aug 2026
6 Mar 2026
18 Mar 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 418 | Cum | 411.15 | ₹1,71,860.7 |
| 2 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost ofcentering, shuttering, finishing and reinforcement - Allwork up to plinth level:1:1.5:3 (1 cement: 1.5 coarse sand): 3graded stone aggregate 20 mm nominal | 62.7 | Cum | 6,656.05 | ₹4,17,334.34 |
| 3 | Steel reinforcement for R.C.C. work includingstraightening, cutting, bending, placing in position and binding all complete upto plinth level. | 5,016 | kg | 75.4 | ₹3,78,206.4 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_192985.xls
BOQ • 0.23 MB
Corrigendum13032026.pdf
PDF • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].