| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC KUMARDIHI PANDEESHWAR BARDDHAMAN BARDDHAMAN 713363 WEST BENGAL INDIA | BARDDHAMAN | BARDDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC recommendation | |
| 2 | L2₹1.8 L+₹2,065 (1.16%)Rejected-Finance KUMARDIHI PANDERSWAR BARDHAMAN BARDHAMAN WEST BENGAL 713363 | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713363 | L2 | Rejected-Finance TC recommendation |
Tender Value
₹1.8 L
EMD Value
₹2,300
Closing Date
22 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
Office of The General Manager Bankola Area, PIN-713363
Installation of booster pump in water line from reservoir to SHCM package in RVI seam Incline cleaning at Nakrakonda Kumardihi B Colliery.
2024_ECL_318896_1
ECL/GM/BA/E TENDER/24-25/EnM/191 Dt 08.10.2024
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹2,300
17 Jan 2025
8 Oct 2024
23 Oct 2024
8 Oct 2024
22 Oct 2024
8 Oct 2024
8 Oct 2024 - 12 Oct 2024
Amount
Item Description/ Heading
Fabrication of Bends, Tees, Straight pipes as per size etc as per design and installation for booster pump
Fabrication of bed plate consisting M.S. Channel and aligning the pump, motor, delivery and suction fittings
Transporting of complete pump set with starters, controlling breaker, sluice valves and placing the same from welding shop at Pit no.5&6 to installation location in CM project.
Unreeling, laying of 50sq.mm. power cable from 11kV substation to pump installation site
Complete installation of bed plate with pump set and matching the delivery and suction range in running line connecting the bypass line.
Cleaning and transporting of scrap material to surface, stacked in manholes built in Incline no.1 for safety of men
Cleaning of Ug substation equipment and scrap at the entrance
Adjustment of winding engine rope of north side and south side of pit no.6 of CM project.
Total impact of GST for the purpose of CTC
MUKHERJEE ENTERPRISE
techsummary_330548.pdf
PDF • 0.87 MB
finsummary_330548.pdf
PDF • 0.87 MB
WOENM191.pdf
PDF • 2.12 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .