Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | Not Admitted-Fee/PreQual/Technical/Finance Others-Not Submitted Tender Fee and EMD |
Tender Value
₹76.8 L
EMD Value
₹76,815
Closing Date
11 Jan 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE(PT-I),IMC, Itanagar
Itanagar
Const. RCC Retaining wall at back side road at vivekvihar Near Nabam Kama Resident, under Ward No 04, 2. Const. CC Pavement with Retaining wall DN College gate to water tank, Ward No-04, 3. Const. CC Pavement Foot Path at Lower Ajing Colony
2023_IMCAP_990_1
IMC/EE(PT-I)/08/2022-23
Open Tender
Civil Works
Item Rate
183 days
Itanagar
Tender fee, EMD and Documents as per NIT
4 documents required · 4 mandatory
₹5,000
EE(PT-I),IMC
₹76,815
11 Jan 2023
3 Jan 2023
11 Jan 2023
3 Jan 2023
11 Jan 2023
3 Jan 2023
Amount
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
b) For walls
Providing and laying in foundations and plinth cement concrete 1 : 2 : 4 (1cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)
Neat cement punning.
Carriage of materials
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
b) For walls
Providing and laying in foundations and plinth cement concrete 1 : 2 : 4 (1cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
b) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level
12 mm cement plaster 1 : 3 (1 cement : 3 fine sand)
Neat cement punning.
Carriage of materials
Granular Sub-Base with Coarse Graded Material (Table:- 400- 2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Dry Lean Cement Concrete Sub- base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.
Cement Concrete Pavement Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation ncluding provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Transportation cost for carriage of Engineering Materials.
Transportation cost for carriage of Forest products from quarry to site of work
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation ncluding provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Transportation cost for carriage of Engineering Materials.
Transportation cost for carriage of Forest products from quarry to site of work
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
b) For walls
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (b)1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :
(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.
b) Tar/ TMT steel
Providing weep holes in Brick masonry/Plain/Reinforced concrete concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification B) Sandy material
Carriage of materials
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
Centring and shuttering including strutting proping etc. and removal of form work for:
a) Footing in foundation
b) For walls
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : (b)1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :
(b)1 : 1.5:3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
Reinforcement of RCC work including bending, binding and placing in position complete.
b) Tar/ TMT steel
Providing weep holes in Brick masonry/Plain/Reinforced concrete concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification B) Sandy material
Carriage of materials
M/S T.M.M.M.M. ENTERPRISE
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .