Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.1 LAccepted-AOC | ₹81.1 L | L1 | Accepted-AOC as per 1st lowest bidder |
| 2 | L2₹95.3 L+₹14.2 L (17.5%)Rejected-Finance AT BHUSLAD PO DEDGAON BLOCK BANGAMUNDA PS SINDHEKELA DIST BOLANGIR PIN 7670354 ODISHA | 7670354 | ₹95.3 L+₹14.2 L (17.5%) | L2 | Rejected-Finance As per 2nd lowest bidder |
| 3 | L2₹95.3 L+₹14.2 L (17.5%)Rejected-Finance AT JAYAPATNA PO JAIPATNA PS JAIPATNA KALAHANDI ODISHA | JAIPATNA | KALAHANDI | ODISHA | ₹95.3 L+₹14.2 L (17.5%) | L2 | Rejected-Finance As per 2nd lowest bidder |
| 4 | L2₹95.3 L+₹14.2 L (17.5%)Rejected-Finance | ₹95.3 L+₹14.2 L (17.5%) | L2 | Rejected-Finance As per 2nd lowest bidder |
| 5 | L2₹95.3 L+₹14.2 L (17.5%)Rejected-Finance | ₹95.3 L+₹14.2 L (17.5%) | L2 | Rejected-Finance As per 2nd lowest bidder |
Tender Value
₹95.4 L
EMD Value
₹96,000
Closing Date
26 Feb 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, KESINGA
Construction of Rest Shed Building at R.W Division, Kesinga for the year 2025-26-Building
2026_CERWI_126125_1
RWKSNG-online-11/25-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Kalahandi
2 documents required · 2 mandatory
₹10,000
₹96,000
Yes
20 Jul 2026
16 Feb 2026
27 Feb 2026
16 Feb 2026
26 Feb 2026
16 Feb 2026
16 Feb 2026 - 23 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads and lifts including dressing the sides and levelling the bed and depositing the excavated earth at places away from work site with all leads and lifts including cost of all labour and T&P,royalty etc. complete and as directed by the Engineer-in-charge. | 784.56 | cum | 276.89 | ₹2,17,236.82 |
| 2 | Filling in foundation & plinth with sand in 22.5cm(9") thick layers including watering and ramming with all cost conveyance royalty, taxes of the materials and labour with T&P required for the work etc. complete or as directed by the Engineer-in-charge. | 173.82 | cum | 558.4 | ₹97,061.09 |
| 3 | Plain Cement concrete (1:3:6) with 4cm size C.B, h.g metal of approved quality and from approved quary including hoisting,lowering, and laying in layers to 10cm(4") thick to required level, ramming,watering including all cost & conveyance of all materials and labour with T&P required for the work with all taxes and royalities complete in all respects and as directed by the Engineer-in-charge. | 130.75 | cum | 5,796.1 | ₹7,57,840.08 |
| 4 | Well C.B. brick masonary in cement mortar (1:6) after immersing bricks for six hours in water before use in super structure using clamp burnt bricks of size (25 x 12 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. (A) Foundation | 120.07 | cum | 5,475 | ₹6,57,383.25 |
| 5 | (B) Super Structure A ) Ground Floor : | 118.33 | cum | 5,517.3 | ₹6,52,862.11 |
| 6 | (B) Super Structure B ) 1st Floor : | 21.53 | cum | 5,895.7 | ₹1,26,934.42 |
| 7 | Fly ash bricks masonary in cement mortar (1:4) after immersing bricks for six hours in water before use in super structure using Fly Ash bricks of size (23 x 11 x 8 cm) having a crushing strength of not less than 75 Kg/Cm2 including splays cutting circular moulding chmfering and corbelling watering and curing etc complete including cost and conveyance of all materials and labour with T&P required for the work with all taxes and royalities etc. complete in all respect or as directed by the Engineer-in-charge. A ) Ground Floor : | 6.62 | cum | 5,644.6 | ₹37,367.25 |
| 8 | Reinforced cement concrete (1:1.5:3) in foundation , column, beam, slab using 12mm size h.g, C.B. broken hard granite chips of approved quality and from approved quary including hoisting, lowering and laying in layers not exceeeding 15cm thick to the required level ,ramming,watering and curing etc. including all cost of material, labour, with T&P and taxes of materials etc. required for work and as per direction of EIC. (A) Columns and beams (I) Foundation | 54.22 | cum | 8,505.8 | ₹4,61,184.48 |
| 9 | (II) Above Foundation A ) Ground Floor : | 25.74 | cum | 19,908 | ₹5,12,431.92 |
| 10 | (II) Above Foundation B ) 1st Floor : | 3.78 | cum | 23,075.8 | ₹87,226.52 |
stage.html
html • 0.18 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.99 MB
Tendernotice_2.pdf
PDF • 4.27 MB
BOQ_581462.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .