Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAdmitted-Finance 3788 SHAH GANJ GB ROAD NEW DELHI 110006 | NORTH | DELHI | 110006 | L1 | Admitted-Finance | |
| 2 | L2₹30.4 L+₹52,926 (1.77%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹34.0 L+₹4.1 L (13.8%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹37.7 L+₹7.9 L (26.4%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹39.7 L+₹9.9 L (33.1%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | H.B. Traders L8 | J.P. Enterprises L11 | Shrikanth Solutions L9 | S.R. Constructions L10 | POONAM ENTERPRISES L2 | R K Enterprises L3 | M/S Anand Enterprises L1 | M/s Prakash Enterprises L4 | mayur enterprises L13 | Parveen Builders L15 | M/S Satyam Associates L12 | Gupta Automobiles L14 | PARAS ENTERPRISES L7 | NEHRA ENTERPRISES L5 | AS Engineering L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Schedule-A | ||||||||||||||||||
| 1.01 | Excavation in trenches n.exc 1.5 Mtr wide and n,exc 1.5 Mtr in depth loose/soft and greating out for underground cable/erection of poles, stays etc complete all as specified and as directted by Engeer-in-Charge. | 600 | CUM | 350 ₹2,10,000 | 90 ₹54,000 | 100 ₹60,000 | 200 ₹1,20,000 | 152 ₹91,200 | 100 ₹60,000 | 70 ₹42,000 Lowest | 100 ₹60,000 | 150 ₹90,000 | 100 ₹60,000 | 300 ₹1,80,000 | 100 ₹60,000 | 310 ₹1,86,000 | 100 ₹60,000 | 150 ₹90,000 |
| 2.00 | Description same as iten No.1 but but exceeding 1.5 mtr deep but not exc 3.0 mtr deep. | 1 | CUM | 156 ₹156 | 500 ₹500 | 100 ₹100 | 300 ₹300 | 65 ₹65 Lowest | 1,500 ₹1,500 | 250 ₹250 | 100 ₹100 | 275 ₹275 | 100 ₹100 | 200 ₹200 | 120 ₹120 | 150 ₹150 | 700 ₹700 | 200 ₹200 |
| 3.00 | Material and labour for sand cushioning for cables with river washed sand and punning to provide required cover as per SSR part I complete all as specified and as directed by Engineer-in-Charge. | 170 | CUM | 347 ₹58,990 | 350 ₹59,500 | 400 ₹68,000 | 200 ₹34,000 | 165 ₹28,050 | 225 ₹38,250 | 300 ₹51,000 | 400 ₹68,000 | 210 ₹35,700 | 500 ₹85,000 | 400 ₹68,000 | 500 ₹85,000 | 350 ₹59,500 | 300 ₹51,000 | 100 ₹17,000 Lowest |
| 4.00 | Supply and laying bricks common burnt clay sub classs 'B' old size for cable protection | 9.02 | Per 1000 | 4,956 ₹44,703.12 | 5,000 ₹45,100 | 2,500 ₹22,550 Lowest | 6,000 ₹54,120 | 5,000 ₹45,100 | 4,500 ₹40,590 | 3,000 ₹27,060 | 5,000 ₹45,100 | 10,000 ₹90,200 | 5,000 ₹45,100 | 7,000 ₹63,140 | 4,000 ₹36,080 | 5,000 ₹45,100 | 4,000 ₹36,080 | 5,500 ₹49,610 |
| 5.00 | Description all as per item Ser No 4 here in before but except bricks
Note : Old unbreak bricks retrieved from item No 1.01 and 2 here in after shall be used. | 9,000 | Each | 4 ₹36,000 | 1 ₹9,000 | 0.5 ₹4,500 Lowest | 5 ₹45,000 | 1 ₹9,000 | 1 ₹9,000 | 1 ₹9,000 | 3 ₹27,000 | 3 ₹27,000 | 1 ₹9,000 | 15 ₹1,35,000 | 2 ₹18,000 | 5 ₹45,000 | 1 ₹9,000 | 5.5 ₹49,500 |
| 6.00 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles all as specified. | 1 | Cum | 5,390 ₹5,390 | 3,500 ₹3,500 | 3,500 ₹3,500 | 2,500 ₹2,500 | 2,569 ₹2,569 | 6,500 ₹6,500 | 2,000 ₹2,000 Lowest | 2,000 ₹2,000 Lowest | 2,350 ₹2,350 | 2,500 ₹2,500 | 6,500 ₹6,500 | 5,000 ₹5,000 | 5,000 ₹5,000 | 3,000 ₹3,000 | 4,500 ₹4,500 |
| 7.00 | Material & labour for Cement concrete, filling and mass concrete, PCC type C1, 1:3:6 using 20 mm graded aggregate all as specified. | 5 | Cum | 7,489 ₹37,445 | 3,000 ₹15,000 | 4,000 ₹20,000 | 3,500 ₹17,500 | 2,100 ₹10,500 | 4,500 ₹22,500 | 2,000 ₹10,000 Lowest | 2,000 ₹10,000 Lowest | 3,250 ₹16,250 | 4,000 ₹20,000 | 8,200 ₹41,000 | 6,000 ₹30,000 | 7,250 ₹36,250 | 4,500 ₹22,500 | 4,500 ₹22,500 |
| 8.00 | Material & labour for cement concrete as coping to poles, PCC type B1, 1:2:4 using 20 mm graded stone agregate as foundations to poles all as specified. | 0.5 | Cum | 8,321 ₹4,160.5 | 4,000 ₹2,000 | 6,000 ₹3,000 | 1,600 ₹800 | 2,000 ₹1,000 | 4,500 ₹2,250 | 2,000 ₹1,000 | 2,000 ₹1,000 | 1,350 ₹675 Lowest | 6,500 ₹3,250 | 8,900 ₹4,450 | 8,500 ₹4,250 | 8,000 ₹4,000 | 6,000 ₹3,000 | 4,500 ₹2,250 |
| 9.00 | Returning, filling in (Soil) including spreading, levelling, watering and well ramming in layers not exc 25CM thick layers complete all as specified and as directed by Engineer-in-Charge.. | 345 | CUM | 121 ₹41,745 | 10 ₹3,450 Lowest | 50 ₹17,250 | 550 ₹1,89,750 | 95 ₹32,775 | 50 ₹17,250 | 30 ₹10,350 | 100 ₹34,500 | 600 ₹2,07,000 | 50 ₹17,250 | 200 ₹69,000 | 20 ₹6,900 | 135 ₹46,575 | 20 ₹6,900 | 55 ₹18,975 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
25 Aug 2026, 6:00 pmClosed
GE (AF) Gurgaon No 1
GE (AF) Gurgaon No 1 Near Atul Kataria Chowk Gurgaon-122005
CA NO. GE AF NO.1 / GUR-63 / 2026-27 REPAIR/REPLACEMENT OF LT DISTRIBUTION NETWORK SYSTEM INCL CABLE, POLE, PANELS, JOINTS,SWITCH GEAR, SERVO STABILIZERS INCLUDING EARTHING PITS AND ALLIED WORKS IN X AREA AT AF STN GURGAON UNDER GE (AF) GURGAON NO.1
2026_MES_782661_1
GE(AF) No 1/GUR-63/2026-27
Open Tender
Miscellaneous Works
Item Rate
180 days
GE (AF) Gurgaon No 1
All as per NIT
10 documents required · 10 mandatory
₹500
GE (AF) Gurgaon No 1
₹90,000
Yes
13 Oct 2026
4 Aug 2026
27 Aug 2026
4 Aug 2026
25 Aug 2026
18 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule-A | |||||
| 1.01 | Excavation in trenches n.exc 1.5 Mtr wide and n,exc 1.5 Mtr in depth loose/soft and greating out for underground cable/erection of poles, stays etc complete all as specified and as directted by Engeer-in-Charge. | 600 | CUM | - | - |
| 2 | Description same as iten No.1 but but exceeding 1.5 mtr deep but not exc 3.0 mtr deep. | 1 | CUM | - | - |
| 3 | Material and labour for sand cushioning for cables with river washed sand and punning to provide required cover as per SSR part I complete all as specified and as directed by Engineer-in-Charge. | 170 | CUM | - | - |
| 4 | Supply and laying bricks common burnt clay sub classs 'B' old size for cable protection | 9.02 | Per 1000 | - | - |
| 5 | Description all as per item Ser No 4 here in before but except bricks
Note : Old unbreak bricks retrieved from item No 1.01 and 2 here in after shall be used. | 9,000 | Each | - | - |
| 6 | Material & labour for cement concrete in foundations, filling and mass concrete PCC as foundation to poles, type D2, 1:4:8 using 40 mm graded stone agregate as foundations to poles all as specified. | 1 | Cum | - | - |
| 7 | Material & labour for Cement concrete, filling and mass concrete, PCC type C1, 1:3:6 using 20 mm graded aggregate all as specified. | 5 | Cum | - | - |
| 8 | Material & labour for cement concrete as coping to poles, PCC type B1, 1:2:4 using 20 mm graded stone agregate as foundations to poles all as specified. | 0.5 | Cum | - | - |
| 9 | Returning, filling in (Soil) including spreading, levelling, watering and well ramming in layers not exc 25CM thick layers complete all as specified and as directed by Engineer-in-Charge.. | 345 | CUM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TenderDocument63.pdf
Tender Documents • 1.45 MB
BOQ_876869.xls
BOQ • 1.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .