| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC | L1 | Accepted-AOC Awarded being L1. | |
| 2 | L2₹6.0 L+₹5,460 (0.91%)Rejected-Finance | L2 | Rejected-Finance Other than L1. | |
| 3 | L3₹7.3 L+₹1.3 L (22.1%)Rejected-Finance R O KHOJA BAGH BARAMULLA JAMMU KASHMIR | BARAMULLA | BARAMULLA | JAMMU AND KASHMIR | 193103 | L3 | Rejected-Finance Other than L1. | |
| 4 | L4₹9.0 L+₹3.0 L (50.0%)Rejected-Finance GUDSATHU BUDGAM KASHMIR 191111 J K | BUDGAM | BUDGAM | JAMMU AND KASHMIR | 191111 | L4 | Rejected-Finance Other than L1. | |
| 5 | L5₹9.7 L+₹3.7 L (62.3%)Rejected-Finance | L5 | Rejected-Finance Other than L1. |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
18 Jul 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGE (I) CIF (K)
AGE (I) CIF (K) SHALATENG
REPAIR AND MAINTENANCE OF TRANSFORMER, ACBs AND OTHER CONNECTED WORKS AT HQ CIF (K) UNDER AGE (I) CIF (K).
2024_MES_660857_1
CA NO. AGE (I) CIF (K) - 25/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
SHALATENG
AS PER NIT AND TENDER DOCUMENTS
9 documents required · 9 mandatory
₹500
AGE (I) CIF (K)
₹20,000
Yes
25 Oct 2024
20 Jun 2024
20 Jul 2024
20 Jun 2024
18 Jul 2024
4 Jul 2024
Amount
Painting of HT/LT panel of any description with one coat of synthetic enamel paint of standard colour code over the existing painted surfaces after preparing the old painted surfaces by using spray gun, complete all as specified and as directed by the Enginer-in-Charge. Note :- This rate inclusive of painting all minor items such as clamps, brackets, nuts, bolts and washers which is not particularly mentioned in the structures shall be measured and paid.
Preparation of old painted external surfaces of HT 2 pole structures consisting of HT 11 Mtr steel pole, cross arms, GOD assy with pipe, DO fuse assy, clamps etc., of any description and applying one coat of Aluminium paint by mannualy, complete all as specified and as directed by the Enginer-in-Charge. Note :- This rate inclusive of painting all minor items such as clamps, brackets, nuts, bolts and washers which is not particularly mentioned in the structures and Each job shall be measured and paid which is deemed to be included in the quoted rates .
Description all as per serial item No 2 here-in- before, but for 4 pole structure, complete all as specified and as directed by the Enginer-in-Charge.
Material and labour for replacement of temperature gauge suitable size for power transformer/AVR of any capacity, complete all as specified and as directed by the Enginer-in-Charge.
PVC sleeves suitable for LT / HT ACSR conductor / jumper in any type in R Y B Colours superior quality inserted over the existing ACSR, complete all as specified and as directed by the Enginer-in-Charge.
Taking down carefully the existing 11KV/433 Volt distribution transformer of capacity 100 KVA to 600 KVA by disconnecting HT overhead connection/underground cables and earth strips etc. from any substation / locations using suitable capacity of crane or by any other method irrespective of type of approach available, loading in vehicle, transportation to workshop for repairs and unloading carefully. Reloading the tranformer after repairs and testing of transformer; transportation to site and unloading including placing at given position and re-commissioning, complete all as specified and as directed by the Enginer-in-Charge. Note : All the T&P required for disconnection, connection, loading and loading including necessary petty items like bolts, nuts etc. shall be arranged by the contractor and rates for the same deem to be included in the quoted rates.
Repairs toTransformer step down 11KV/0.433 KV any type of capacity 100 KVA to 250 KVA, after dismantling the transformer body carefully, opening the top cover of Transformer for inspection /repair, drain out the transformer oil from the tank complete, taking out the core and winding assy by disconnecting the internal connections, removing the carbon/sludge deposit in transformer housing core, renewal/replacement of u/s rubber bushes and washers , replacement of tap changer winding and thimbles, replacement of silica gel, replacement of top cover gasket set including pasting with pasting material, replacement of worn out nut and bolts, replacement of unserviceable LT & HT bushes, cutting the burnt out winding and re-winding the same with suitable size of super enamelled copper wire as per existing guage, insulating the winding connection by using fire proof sleeve and fire proof tape, warnishing the coil, keeping the coils in electric oven chamber for 24 hrs to remove the moisture, Painting of complete transformer body from outside and inside by weather proof type using spray gun, Marking of MES/SM Number etc, replacement of conservator tank glass, re-intalling the core and winding inside properly, making the all connection with suitable copper lugs, refilling of dehydrated transformer oil including dehydration, reinstalling the top cover after cleaning and painting of housing, conservator tank, expulsion vent etc, Meggering the LT and HT side of the Transformer and testing complete all as specified and directed by Engr-in-Charge. Note : Winding wire including labour for making of coils and LT/HT bushes will be measured and paid seperately.
Description all as per serial item No 7 here-in- before, but of capacity 11 KV/0.433 KV, 300 KVA to 400 KVA, complete all as specified and as directed by the Enginer-in-Charge.
Supply and filling of fresh transformer power oil of BDV not less than 50 KV for topping up of reduced level of transformer due to evaporation/ leakage/losses due to dehydration in HT 33 KV transformer/HT 11 KV AVR /Distribution transformer 100 to 400 KVA or for replacement complete including removing of old unservicable transformer oil, complete all as specified and as directed by the Enginer-in-Charge. Note : Necessary documents should be submitted by the contractor to Engineer- In -Charge.
Conducting oil filtration by stream line / Vacuum type filter machine to remove the moisture/carbon particles to improve required BDV of oil 50 to 60 KV for 1 min for power transformer and as BDV of oil 40 to 50 KV for 1 min for distribution transformer incl routine testing after filtration for any capacity of transformers/AVR/CT/PT units, complete all as specified and as directed by the Enginer-in-Charge. Note : (i)The contractor shall change the filter assy before starting the filtration of transformer / AVR of capacity 600 KVA and more capacities in presence of Engineer- In -charge. (ii) Necessary documents should be submitted by the contractor to Engineer- In-Charge.
Material and labour for replacement of brass terminal rod with nuts,bolts washers and bushings suitable for HT side of the transformer of any make and of capacity 100KVA to 300 KVA, complete all as specified and as directed by the Enginer-in-Charge.
Description all as per serial item No 11 here-in- before, but LT side, complete all as specified and as directed by the Enginer-in-Charge.
Material and labour for replacement of brass terminal rod with nuts,bolts washers and bushings suitable for HT side of the transformer of any make and capacity from 315 KVA to 400 KVA. complete all as specified and directed by the Engineer-in-Charge.
Description all as per serial item No 13 here-in- before, but LT side, complete all as specified and as directed by the Enginer-in-Charge.
Supply and replacing silica gel breather clear view type including first fill of good quality silica gel of capacity suitable for 100 KVA to 300 KVA transformer, complete all as specified and as directed by the Enginer-in-Charge.
Supply and replacing silica gel breather clear view type including first fill of good quality silica gel of capacity suitable for 315 KVA to 400 KVA transformer, complete all as specified and as directed by the Enginer-in-Charge.
Painting the outer surface of the transformer with one coat of weather proof paint after preparing the surface dust and oil free and cleaning the bushes, name plate etc paint free after painting including writing the MES/SM No with white enamelled paint all as directed for capacity of transformer 100 KVA to 400 KVA (Indoor/outdoor type), complete all as specified and as directed by the Enginer-in-Charge.
Earthing complete with and including galvanised steel earth plate electrode 600 mm x 600 mm x 6 mm thick surrounded by a mixture of charcoal and salt in alternate layers burried directly in ground vertically in a pit of depth not less than 2.25 m deep below ground level with top edge of earth plate at a depth of not less than 1.5 m below ground level, connected with and including galvanised iron strip of size 32 x 6mmmm thick,as earthing lead by means bolts, nuts, check nuts and washers made out of galvanised iron, 40 mm bore (light grade) GI pipe for protection of earthing lead, 20 mm bore (light grade) GI pipe for watering with funnel, wire mesh including provision of concrete pit in plain cement concrete 1:2:4, type B-1 using 20mm graded crushed stone aggregate with 40 mm thick cover of reinforced cement concrete 1:2:4, type B-I, using 20 mm graded crushed stone aggregate, reinforced with XPM weight not less than 4 Kg /Sqm and frame of angle iron 25 x 25 x 6mm with lugs 02 Nos and with 6mm dia MS bar handle made to shape ,excavation and earth work in any type of soil, returning filling in and removal of surplus soil including testing including testing on completion, complete all as specified and and shown in electrical plate No 3 of MES Schedule 2009 Part-I, complete all as specified and as directed by the Engineer-in-Charge. Note:- Earthing to be done for replacement of existing earthing. The materials retrieved from earthing shall be credited to contractor.
Supply and fixing in replacement off load tap changer for distribution transformer of any make and of capacity 200-400 KVA, complete all as specified and directed by the Engineer-in-Charge.
Super enamelled copper conductor wire of suitable gauge and size as per requirement for rewinding the HT/LT transformer / any make, complete all as specified and directed by the Engineer-in-Charge.
Material and labour for replacement of bush type insulator white/brown/green working pressure 11000Volts HT side, complete all as specified and directed by the Engineer-in-Charge.
Material and labour for replacement of bush type insulator white/brown/green working pressure 433 Volts LT side, complete all as specified and directed by the Engineer-in-Charge.
Servicing of 11KV VCB / bus coupler by dismantling cleaning greasing the complete VCB with attached relays bus bar etc insulation testing, setting the contact gap by measuring as required reassembling the VCB and reinstalling back to its original position checking and repairing the current circuit panel wiring, replacement of new spares as required complete including operational testing and commissioning, complete all as specified and directed by the Engineer-in-Charge. Note : New spares will be measured and paid separately under relavent item of this schedule.
carrying out primary and secondary injection test of 11 KV indoor /outdoor type current transformer (Set of three) of VCB's by using standard injection test method and checking the electrical circuits for fault condition, all relay testing and proper functioning incl submitting the test report, complete all as specified and directed by the Engineer-in-Charge. Note : PIT/SIT for VCB will be carried out in 6 months intervals and each primary & secondary injection test will be measured and paid.
Supply and fixing inreplacement the following spares for Indoordoor VCB 11 KV 630 A, complete all as specified and directed by the Engineer-in-Charge.
Closing coil 24/30V DC
Tripping coil 24/30V DC
Antipumping device 24/30V DC
Earth Fault and over current relay .
Digital type power factor indicator meter
Digital type Voltmeter / Ammeter 96 x 96 mm size
LED type indicator lamp assembly
Vacuum Interrupter for indoor VCB
Spout incoming side
Spout outgoing side
Epoxy insulators bushings for incoming / out going cables / bus bar suppors as per existng size of VCBs
Insulated Copper bus bar of existing size and thickness for VCBs
Gear system assy complete with handle for charging / discharging of VCBs
Spring charging motor for VCBs
Supply and fixing in replacement 11 KV Airbreak switch spares all as directed., complete all as specified and as directed by Eng-in-Charge
Male contact/moving Contact Blade
Female contact/Fix Contact Jaw
MS jumper carrier
Back Connector plate
Petroleum Jelly
Note :- An amount of Rs. 96,365.00 on account of credit schdule for Sch 'A' Part-II Shall be deducted from the total amount of BOQ to arrive at the contract sum.
M/S Noor Mohammad Shalla (BID ID -3057080)
M/S HAMIDULLAH KHUROO (BID ID -3057716)
JK BUILDERS AND ENGINEERS (BID ID -3057608)
M/s FAYAZ AHMAD BHAT C/O ZAHOOR AHMAD DAR (BID ID -3066284)
M/S CLASSIC JK SUPPLIERS (BID ID -3066194)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .