Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical UTTAR PRADESH | Accepted-Technical Accept |
| 2 | Accepted-Technical 143 SHASTRI NAGAR LAKHIMPUR KHERI | Accepted-Technical Accept |
| 3 | Not Admitted-Fee/PreQual/Technical BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | Not Admitted-Fee/PreQual/Technical Others-Tender Fees Not Paid |
Tender Value
₹21.9 L
EMD Value
₹2.2 L
Closing Date
26 Dec 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Dy. Director Construction
Rajya Krishi Utpadan Mandi Parishad Gonda
Repairing of Link Road Pipra Gram To Parsouna.
2025_RKUMP_1095282_1
CE/(Gaddamukti)2025-1449-02
Open Tender
Civil Works
Percentage
120 days
Rajya Krishi Utpadan Mandi Parishad Gonda
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,894
Dy. Director Construction
₹2.2 L
Yes
1 Jan 2026
4 Dec 2025
27 Dec 2025
4 Dec 2025
26 Dec 2025
4 Dec 2025
Earthwork in cutting or in embarkment in ordinary soil, excavation to be in the form of regular pits not exceeding I/2 metre (20'g in deptk and earthwork in embankment to be in 20 cm (8") layers, including ramming & dressing the surface to required levels and slopes and also including 1.5 metre (5ffs) liíts and 30m. (100") lead. The earth from cutting to be used in making embankment or to be deposited as directed by Engineer-in-charee.
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405
Providing and applying tack coat with bitumen emulsion (RS-I) using emulsion distributor at the rate of 0.30 kg to 0.40 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a Mixal, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C seal coat By Mixal.
S/F of signboard as per direction of engineer in charge
(Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 1.50%
(Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 3.00%
(Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 4.50%
(Item No. 01 To 06) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 6.00%
WBM Grading - III Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheeled roller 8-10 Kn in stages to proper grade and camber, applying and brooming stone screening to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading III as per Technical Specification Clause 405
Class-150 brick work in1:4 (1 cement and 4 coarse sand) mortarin foundationand plinth including supply of all materials, labour and T & P etc. required for proper completion of the work.(S.I. 305b)
Earth work in Excavation in trenches for foundations pipes cable etc in ordinary soil (Loam clayor sand) including lift upto1.5 m. lead upto 50 m and dressing of side sand rammings of bottom and disposal of surplus exdavated earth as directed by the Engineer I/C with in a lead of 30 m.
Providing and laying Cement concrete 1:4:8 (1cement :4 Course sand :8 graded Brick Ballast 40mm nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(S.I. No. 275)
Providing and laying Cement concrete 1:2:4 (1 cement : 2coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors.(279b)
Supply Of Rubber module reflective Zig Zag 80 mm Thick.Precist Compressed C.C. Interlocking as lock compressive strngth shall not be less then 30MPA and wight not less then 5.50kg each block including of 50mm thich bedding sand joint filling with sand all material labour T&P etc.required for proper complation of the work over the prepared base concrete as directed by Engineering-in-charge .
S/L of NP3 Hume pipe including fixing of collar with 1:2 ccement motar as per MORD/MORTH specification.Dia 350mm Dia Pipe
(Interlocking Work Item No. 12 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost @ 0.25%
(Interlocking Work Item No. 12 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost @ 0.50%
(Interlocking Work Item No. 12 T0 18)The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost @ 0.75%
(Interlocking Work Item No. 12 T0 18) The routine maintenance of above road work Including earthen shoulder, and bitumenous pavement etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost @ 1.00%
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.11 MB
BOQ_2017614.xls
BOQ • 0.25 MB
T1_Pipararam.pdf
Tender Documents • 11.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .