Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
2 Nov 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SALINI
C AND M DEPT, NTECL TOWNSHIP, ATTIPATTU PUDU NAGAR
Designing, erecting precast staircase for cooling tower and dismantling of old staircase
2021_NTECL_92002_1
CS 4826
Limited
Civil Works
Item Rate
120 days
NTECL VTPP
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
5 Nov 2021
20 Oct 2021
3 Nov 2021
20 Oct 2021
2 Nov 2021
24 Oct 2021
20 Oct 2021 - 23 Oct 2021
180 days
Amount
PART-A DISMANTLING OF COOLING TOWER STAIRCASE (1NOS) AND RAFT PREPARATION WORK (2 No’s)
Disassociation of damaged staircase structure from cooling tower without damaging the stability of cooling tower using wall saw or wire saw etc including all tools, tackles, necessary supports and manpower. - The exposed surfaces of the concrete has be protected from corrosion with polymer modified mortar and corrosion inhibitor.
Dismantling of cooling tower staircase beams, column, waist slab, raft preparation (2nos) - chipping of existing paving, column, beam etc. for raft excavation, and disposal of debris within 50 mt. including tools, tackles and necessary manpower. Note: The dismantled concrete blocks should of size suitable for safe lowering either by crane or any other method approved by EIC.
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding.
Charges for hiring crane with operator (minimum 20 Ton) with suitable boom capacity for safe lowering of the dismantled concrete beams/column /slabs etc with all tools and tackles.
Part -B- PRECAST STAIRCASE
Design, production, transportation, erection of precast concrete staircase with minimum M40 grade concrete, including preparation of raft at site with necessary alignment, grouting of precast structures, protective coating on the structure, tools, lifting arrangement and tackles required for completing the work, matching the existing cooling tower top slab. The dismantled paving has to rectified after erection. (Reinforcement for only raft, paving and dowel will be supplied by NTECL)
EMPIREPRECAST
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .