Loading…
Loading…
Tender Value
₹9.0 L
EMD Value
₹18,057
Closing Date
6 Jul 2026, 5:30 pmDue tomorrow
Executive Engineer-V
the office of the Executive Engineer -V, PWD, Altinho Panaji Goa.
Urgent repair and renovation of Office Toilet to Block Development Office and Civil Registrar cum Sub Registration office in Government Office Complex, Pernem - Goa
2026_PWD_29982_1
PWD/D-V/ASW-I/12/26-27/L02
Open Tender
Civil Works - Buildings
45 days
PWD Div V Altinho, Panaji -Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹18,057
29 Jun 2026
29 Jun 2026
7 Jul 2026
29 Jun 2026
6 Jul 2026
29 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 148 | sq.m | 330 | ₹48,840 |
| 2 | Dismantling doors, windows and clearestory windows (steel or wood) shutters including chowkhats architrave holdfast etc. complete and staking within 50 mt. Lead;Of area 3 sq.m. and below | 12 | each | 206 | ₹2,472 |
| 3 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 mts. lead. | 105 | sq.m | 27 | ₹2,835 |
| 4 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 3.75 | Cu.m | 1,122 | ₹4,207.5 |
| 5 | Waterproofing of sunken slabs, toilet blocks, terraces on slabs under brickbats, roofs, watertanks. Cleaning the surface and filling cracks (if any), applying EPCO ACR wherever necessary, Providing and Moistening the surface with water to render it saturated. Mix Cement and Monobond WF in the ratio of 1.25 kg to 1 by weight and stir continuously. Apply minimum 2 coats with an interval of 12 hours minimum between the coats. Fix fiber mesh while the first coat is still tacky. Cure with sprinkling of water 3-4 times a day. incl. cost of scaffolding transport etc. as per dir of EIC. All the chemicals will be of Krishna Conchem Products Pvt. Ltd. or Equivalent | 34 | sq.m | 691 | ₹23,494 |
| 6 | Providing water proofing treatment over the new R.C.C. roofs terrace toilet by spreading cement slurry over the R.C.C. slab and laying of 10cms. Average laterite stone ballast coba with the necessary gradient for easy flow of rain water and the coba in covered with damp proof of Hindustan water proofing co. Or equivalent jointless water proofing plaster of mix 1:3 ( 1 cement : 3 find sand), finished smooth with wooden trowel with false marking of 30 cms square. The vertical surface of the adjoining walls are to be treated upto a height of 30cms including rounding of junction (the rate includes for complete items including labour and materials and including cost of initial treatment of roof slab as follows. The injunction of damp proof or equivalent compound with cement solution will be given as and when found necessary for filling honey comb, cracks etc. in the R.C.C. slabs). NOTE: cement consumption 25 kg/sq.m. | 12.5 | sq.m | 1,029 | ₹12,862.5 |
| 7 | 12mm cement plaster 1:3 (1 cement : 3 fine sand) | 172.5 | sq.m | 238 | ₹41,055 |
| 8 | Providing and fixing 1st quality ceramic glazed wall tiles (Johnson, Somany, Kajaria )conforming to IS:15622 (thickness to be specified by the manufacture of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-charge in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand ) and jointing with grey cement slurry @3.3kg per sq.m including pointing in white cement mixed with pigment of matching shade complete. ;Wall Ceramic Glazed Tiles : 200 x 300 | 172.5 | sq.m | 792 | ₹1,36,620 |
| 9 | Repairs to plaster in patches of 2.5 sq.m. and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50m lead.;With cement mortar 1:4 (1 cement : 4 fine sand) | 29.75 | sq.m | 314 | ₹9,341.5 |
| 10 | Providing and and laying antiskid floor tiles 12 x 12 upto 16 x 16 in of Johnson, Somany, Kajaria (thickness to be specified by the manufacturer) of 1st quality conforming to IS:15622 of approved make in shades as specified laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand) including pointing the joints with white cement and matching pigment etc., complete;Dark Shades | 40 | sq.m | 968 | ₹38,720 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
Tendernotice_2.pdf
PDF • 1.74 MB
BOQ_30398.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid