Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹6.1 L
EMD Value
₹12,142
Closing Date
19 May 2025, 3:00 pmClosed
EE, UWD, GGSIPU, Sector 16C Dwarka, New Delhi
EE, UWD, GGSIPU, Sector 16C Dwarka, New Delhi
RMO GGSIP University, Dwarka Campus, New Delhi. SH Comprehensive Maintenance of Split,Window,Tower A.C. and Refrigerators
2025_GGSIP_272007_1
11/EE/UWD/Dwarka Campus/2025-26
Open Tender
Electrical Works
Works
180 days
EE, UWD, GGSIPU, Sector 16C Dwarka, New Delhi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹12,142
20 May 2025
9 May 2025
19 May 2025
9 May 2025
19 May 2025
9 May 2025
Amount
Comprehensive maintenance of split / window / tower A.C. with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge. 1.5 TR/2 TR Split A.C. (Inverter Type)
Comprehensive maintenance of split / window / tower A.C. with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge.. 1.5 TR/2 TR Split A.C. (Non Inverter Type)
Comprehensive maintenance of split / window / tower A.C. with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge. 1.5 TR/2 TR Window A.C.
Comprehensive maintenance of split / window / tower A.C. with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge. 3 TR / 4.5TR Tower A.C.
Supplying and charging of refrigerent gas in the existing split / window/ tower AC including brazing the tubes, leakage finding, pressure testing and vaccuming etc as required of following items. Split / Window air conditioner 1.5TR capacity
Supplying and charging of refrigerent gas in the existing split / window/ tower AC including brazing the tubes, leakage finding, pressure testing and vaccuming etc as required of following items. Split / Window air conditioner 2TR capacity
Supplying and charging of refrigerent gas in the existing split / window/ tower AC including brazing the tubes, leakage finding, pressure testing and vaccuming etc as required of following items. Tower air conditioner 3 TR / 4.5 TR capacity
Supplying and replacement of following defective items compatible with the existing split / window A.C and including dismantaling the same defective item and taking away dismantled material as credit item on buy back basis as required Compressor
Supplying and replacement of following defective items compatible with the existing split / window A.C and including dismantaling the same defective item and taking away dismantled material as credit item on buy back basis as required Cooling coil
Supplying and replacement of following defective items compatible with the existing split / window A.C and including dismantaling the same defective item and taking away dismantled material as credit item on buy back basis as required Condenser coil
Dismantling of existing split Air Condition 1.5TR/2TR capacity including dismantling the copper pipe and outdoor unit etc as required and as per direction of engineer-in-charge
Installation of existing split Air Condition 1.5TR/2TR capacity including fixing the existing copper pipe and outdoor unit etc as required and as per direction of engineer-in-charge
Comprehensive annual maintenance of (excluding item no. 7 ) following capacity Deep freezer with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge. 1300 ltr
Comprehensive annual maintenance of following type/capacity refrigerator with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge. Single door refrigerator (0-400 ltr)
Comprehensive annual maintenance of following type/capacity refrigerator with all necessary preventive maintenance as and when required or as per direction of engineer-in-charge. Double door refrigerator (0-800 ltr)
Supplying and charging of refrigerent gas in the existing Refrigerator including brazing the tubes, leakage finding, pressure testing and vaccuming etc as required of following items Single door refrigerator (0-400 ltr)
Supplying and charging of refrigerent gas in the existing Refrigerator including brazing the tubes, leakage finding, pressure testing and vaccuming etc as required of following items Double door refrigerator (0-800 ltr)
Supplying and charging of refrigerent gas in the existing Refrigerator including brazing the tubes, leakage finding, pressure testing and vaccuming etc as required of following items Four door refrigerator (1300 ltr)
Supplying and replacement of following defective items compatible with existing deep freezer (Four Door 1300 Ltr each) and including dismantaling the same defective item and taking away dismantled material as credit item on buy back basis as required Compressor
DAMAN INTER COOL SYSTEM (BID ID -1582215)
STANDARD REFRIGERATION CORPORATION (BID ID -1580464)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .