Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC LOWEST BID | |
| 2 | L2₹13.2 L+₹13,759.25 (1.05%)Rejected-Finance | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹13.4 L+₹26,863.30 (2.05%)Rejected-Finance | L3 | Rejected-Finance REJECTED |
Tender Value
₹13.1 L
EMD Value
₹26,208
Closing Date
27 Mar 2024, 4:00 pmClosed
Executive Engg Bijanbari Engg Div
EXE.ENGINEER OFFICE LOUIS JUBLEE COMPLEX,DARJEELING
Const. of Irrigation Cannel for Lower Pakhagoan, Relling, Darjeeling, GTA
2024_GTA_684716_1
GTA/EE/BED/NIeT-51/2023-24
Open Tender
CIVIL WORKS
Percentage
90 days
Bijanbari
EMD,BID CAPACITY,DECLARATION FORM X Y,NIET,TENDER FORM 2911.ii
3 documents required · 3 mandatory
₹1,005
₹26,208
29 Sept 2026
13 Mar 2024
29 Mar 2024
13 Mar 2024
27 Mar 2024
13 Mar 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in Cutting to form road section in correct profile in mixed soil including removal of spoils not exceeding initial lead of 50m and initial lift of 1.50m (iii) In mixed hard soil (i,e hard moorum and soil containing laterite and boulders which do not require blasting) | 180 | cum | 130.98 | ₹23,576.19 |
| 2 | Excavation in Hard Rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections as per Clause 301 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (Mode of measurement: pre works and post works) | 100 | cum | 529.16 | ₹52,915.92 |
| 3 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge . | 69.25 | cum | 135.87 | ₹9,408.67 |
| 4 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any. | 165.41 | cum | 4,725.25 | ₹7,81,579.74 |
| 5 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. | 173.92 | sqm | 255.05 | ₹44,357.21 |
| 6 | Providing weep hole (150 X 75mm) in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete. | 156 | nos | 139.44 | ₹21,752.73 |
| 7 | Stone square box drain 30cm x 60cm with hard dressed stone including cost cement concrete,plstering and NCP cost & carriage of all materials to worksite. | 250 | meter | 1,507.26 | ₹3,76,814.38 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
Tender Document • 2.35 MB
Tendernotice_2.pdf
Tender Document • 0.51 MB
BOQ_1491647.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .