Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
3 Sept 2026, 4:00 pm
Executive Engineer PWD RandB Division R S Pura
Executive Engineer PWD RandB Division R S Pura
BOQ
2026_PWDJK_321532_6
Short e-NIT No. DRSP/71 of 2026-27 Dated 19-08-2026
Open Tender
Civil Works
Percentage
90 days
Dablehar
eNIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division R S Pura
₹30,000
R S Pura
19 Aug 2026
19 Aug 2026
4 Sept 2026
19 Aug 2026
3 Sept 2026
19 Aug 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil | 47.25 | Cum | 479.3 | ₹22,646.93 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate) 40mm nominal size crushed. | 10.5 | Cum | 4,826.5 | ₹50,678.25 |
| 3 | Providing and laying in position cement concrete of 1:3:6 grade (1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size) excluding the cost of centering and shuttering. All work upto plinth level. | 100.8 | Cum | 5,733.6 | ₹5,77,946.88 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for :-Foundations, footings, bases of columns. | 336 | SQm | 286.35 | ₹96,213.6 |
| 5 | Providing and laying River Bed Material on the lane surface by way of spreading the same in uniform layer not exceeding 20cm in depth, incl. watering and compaction including carriage of material from source to site of work (all leads, lifts complete). | 1,620 | Cum | 395 | ₹6,39,900 |
| 6 | Providing and Laying 450mm dia of Hume pipe in proper slope including carriages complete as per directions of Engineer Incharge. | 17.5 | Rmt | 2,470.75 | ₹43,238.13 |
| 7 | Engaging Jcb for site clearence and other miscellaneous work at site | 6 | Hrs | 950 | ₹5,700 |
| 8 | Engaging labour for levelling of earth, cleaning of choked drain and other unforeseen cleaning. | 3 | Hrs | 553 | ₹1,659 |
| 9 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete.Stone aggregate below 40mm /sand size for an avg. lead of 20 Kms. | 151.25 | Cum | 409.94 | ₹62,003.43 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_1074256.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].