Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92,327.13Admitted-Fee/PreQual/Technical/Finance | -28.00% | ₹92,327.13 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹92,545.13+₹218 (0.24%)Admitted-Fee/PreQual/Technical/Finance | -27.83% | ₹92,545.13+₹218 (0.24%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹92,647.71+₹320.58 (0.35%)Admitted-Fee/PreQual/Technical/Finance | -27.75% | ₹92,647.71+₹320.58 (0.35%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹96,174.10+₹3,846.97 (4.17%)Admitted-Fee/PreQual/Technical/Finance | -25.00% | ₹96,174.10+₹3,846.97 (4.17%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹1.1 L+₹16,670.18 (18.1%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹1.1 L+₹16,670.18 (18.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 L
EMD Value
₹3,840
Closing Date
24 Jul 2026, 4:00 pmClosed
Executive Engineer ID Ompora
Executive Engineer ID Ompora
Construction of lining wall on right side of Ranger Canal near migrant land at Ranger Chadoora.
2026_IFC_314589_3
enit2of072026
Open Tender
Civil Works
Percentage
15 days
Budgam
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
Chief Engineer Kmr I and FC Deptt.
₹3,840
4 Aug 2026
4 Jul 2026
25 Jul 2026
4 Jul 2026
24 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 16.12 | cum | 592.9 | ₹9,557.55 |
| 2 | Dumping stone excluding cost of stones. in Horizontal on level | 1.77 | cum | 237.9 | ₹421.08 |
| 3 | Supplyof stone soling (nallah) nominal size 225 mm | 1.77 | cum | 700 | ₹1,239 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 15.08 | cum | 5,733.6 | ₹86,462.69 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 36.4 | sqm | 286.35 | ₹10,423.14 |
| 6 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) | 31.2 | Sqm | 283.8 | ₹8,854.56 |
| 7 | Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking.
Soling Stone from Shaliganga avg. lead of 03 km | 1.77 | cum | 195.1 | ₹345.33 |
| 7.1 | 20 mm aggregate avg. lead of 03 kms | 13.42 | Cum | 165.84 | ₹2,225.74 |
| 7.2 | Sand from Marvel avg. lead of 25 kms . | 7.19 | Cum | 465.14 | ₹3,344.36 |
| 7.3 | Cement avg. lead 01 km | 3.49 | MT | 114.44 | ₹399.4 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.36 MB
BOQ_1018649.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .