Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.2 LAccepted-Finance 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | L1 | Accepted-Finance Low rate quoted | |
| 2 | L2₹7.2 L+₹738.68 (0.10%)Rejected-Finance 16 PERUNAL KOIL STREET VEMBEDU VILLAGE AMBUR POST PIN 635701 THENI TAMIL NADU | TIRUPATHUR | TAMIL NADU | 635701 | L2 | Rejected-Finance High rate quoted |
Tender Value
Refer Docs
EMD Value
₹18,300
Closing Date
17 Jul 2023, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer
Sholavaram block office
Improvemnets of Athur medu veera kulam burial ground kariyamedai and cc road at Athur panchayat
2023_RDTN_336017_1
490/2023/A7
Open Tender
Civil Works
Works
120 days
Sholavaram block office
As per documents
4 documents required · 4 mandatory
₹0
₹18,300
Yes
11 Sept 2023
5 Jul 2023
17 Jul 2023
5 Jul 2023
17 Jul 2023
5 Jul 2023
Amount
Improvements to Burial Ground Athur near veera kulam of Kariamedai and CC Road -68m @ Athur Panchayat
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Supplying and filling the excavated earth including cost and labour charges for filling etc complete
Supplying and fabricating and pacing in position MS Steel or ribbed for steel for all reinforced cement concerete work as per the design given including cost of steel and bilding wire all floors etc ., complete
RCC 1:1.5:3 mix using 20mm ISS HBG metal for all RCC items of works including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10cum
(Basement)
(Super structure)
Brick work in CM 1:5 for foundation and basement including necessary provision for bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications
(Basement)
Super structure
Supplying and Erection centering for sides and soffiots including necessaary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items (RCC floor slab, roff slab, Rectangular / Square, Tee/ Ell beams, Lintels,
(Below Basement)
(Above Basement)
Plastering with CM 1:3 ,10mm thick including cost and conveyance to site and labour charges etc .,
Plastering with CM 1:5 ,12mm thick including cost and conveyance to site and labour charges etc .,
CC ROAD
Collection and supply of sand and filling in to the basement including cost and conveyance To the siteand all labour charges for filling with cost and conveyance
Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. comple
Cement Concrete 1:2:4 (One cement, Two sand, Four Hard Broken stone) using 20 mm guage machine broken hard broken granite stone jelly fincluding cost conveyance and all labour charges etc. complete.
Towards centering chargers for all labour charges etc
Supplying and fixing of Bitumen pad for expansion joints
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
AADVIK AND ASSOCIATES
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .