Tender Value
₹15.3 L
EMD Value
₹15,275
Closing Date
28 Jul 2026, 5:00 pm2d left
Office of the Block Development Officer, Muniguda
Office of the Block Development Officer, Muniguda
Construction of Additional Class Room building at Asurapada UPS, GP- Sibapadar
2026_PZPMN_135557_5
BDO,Muniguda-Online-01/2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Asurapada
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹15,275
Yes
13 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
28 Jul 2026
13 Jul 2026
13 Jul 2026 - 25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in all kinds of soil within 50 mtrs initial lead and 1.5 mtrs initial lift including levelling and dressing the bed etc. complete | 50.41 | cum | 274 | ₹13,811.24 |
| 2 | Filling F&P with sand well watered and rammed including cost, conveyance of all material and labour etc complete as per the direction of EIC. | 58.5 | cum | 1,056.88 | ₹61,830.65 |
| 3 | P. C. C ( 1: 3:6) to using 40mm size hard granite metal including cost, conveyance of all material and labour etc complete as per the direction of EIC. | 23.34 | cum | 6,151.95 | ₹1,43,604.97 |
| 4 | Brick work with CB Brick(23x11x8 cm) masonry C. M. (1:6 )in superstructure with splay cutting circular moulding etc including cost, conveyance of all material and labour etc complete as per the direction of EIC. | 16.4 | cum | 5,555.87 | ₹91,110.71 |
| 5 | R.C.C (1:1.5:3)for column base & Plinth beam using 12mm size BHG chips including centring , shuttering etc. cost, conveyance of all material and labour etc complete as per the direction of EIC. | 12.19 | cum | 6,156.84 | ₹75,045.72 |
| 6 | R.C.C (1:1.5:3)for Lintel Band & Door window sill band using 12mm size BHG chips including centring , shuttering etc. cost, conveyance of all material and labour etc complete as per the direction of EIC. | 19.87 | cum | 6,156.84 | ₹1,22,354.88 |
| 7 | Rigid smooth centering for RCC Works including false work and dismanteling them after casting including cost of materials complete in ground floor a) RCC foundation , plinth band,and footing bases of column | 65.7 | sqm | 84.24 | ₹5,534.57 |
| 8 | b)RCC Column from PL to RL | 44.71 | sqm | 1,208.74 | ₹54,042.77 |
| 9 | c)Lintel beam | 15.82 | sqm | 565.95 | ₹8,953.33 |
| 10 | d)Roof Beam & Middle beam | 1 | sqm | 1,208.74 | ₹1,207.53 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
BOQ_601181.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].