Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.9 LAdmitted-Finance GOVT CONTRACTOR PORT BLAIR | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744101 | -20.00% | ₹28.9 L | L1 | Admitted-Finance |
| 2 | L2₹30.2 L+₹1.3 L (4.50%)Admitted-Finance | -16.40% | ₹30.2 L+₹1.3 L (4.50%) | L2 | Admitted-Finance |
| 3 | L3₹30.4 L+₹1.4 L (5.00%)Admitted-Finance | -16.00% | ₹30.4 L+₹1.4 L (5.00%) | L3 | Admitted-Finance |
| 4 | L4₹34.7 L+₹5.8 L (20.2%)Admitted-Finance | -3.87% | ₹34.7 L+₹5.8 L (20.2%) | L4 | Admitted-Finance |
Tender Value
₹36.1 L
EMD Value
₹72,269
Closing Date
14 Sept 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer, CD-I, APWD, Rangat
Renovation of Govt. Secondary School at Uttara under CD-I, Rangat.
2026_APWD_24499_1
56/DB/CD-I/RGT/2026-27
Open Tender
Civil Works - Buildings
Percentage
120 days
Kadamtala
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹72,269
17 Sept 2026
31 Aug 2026
14 Sept 2026
31 Aug 2026
14 Sept 2026
31 Aug 2026
31 Aug 2026 - 14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead : | |||||
| 1.1 | Of area 3 sq. metres and below | 45 | each | 343.65 | ₹15,464.25 |
| 2Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead : | |||||
| 2.1 | Of sectional area 40 square centimetres and above | 1.3 | cum | 4,182.3 | ₹5,436.99 |
| 3Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: | |||||
| 3.1 | Asbestos Cement sheet | 382 | sqm | 71.75 | ₹27,408.5 |
| 4 | Dismantling cement asbestos or other hard board ceiling or partition walls including stacking of serviceable materials and disposal of unserviceable materials within 50 metres lead. | 186 | sqm | 52.4 | ₹9,746.4 |
| 5Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 5.1 | 1:2:4 (1 cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.55 | cum | 13,212.65 | ₹7,266.96 |
| 6Centering and shuttering including strutting, propping etc. and removal of form for | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
TenderDocument.pdf
Tender Documents • 16.30 MB
BOQ_25938.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .