Block Development Officer (VP), Thanjavur
Block Development Office, Thanjavur
Thanjavur District - Thanjavur Block - Desilting of Vairakulam and Construction of Bathing Ghat and Retaining wall in Pudhupattinam panchayat under AGAMT II 2023-24
2023_RDTN_383526_14
Rc.No. 4237/2022/A3 Dated 09.10.2023
Open Tender
Civil Works - Others
Item Rate
180 days
Thanjavur
As per Tender bid document
8 documents required · 8 mandatory
₹0
₹10,000
27 Nov 2023
30 Oct 2023
3 Nov 2023
30 Oct 2023
3 Nov 2023
30 Oct 2023
Amount
Desilting of Vairakulam and Construction of Bathing Ghat & Retaining wall in Pudhupattinam panchayat.
Desilting of Pond
Clearing the light jungle and Removel away from the site including chargesas the sandars specification
Earth work Excavation and depositing on bank with an initial lead of 10 m and initial lift in Exacavated earth SS( Top and stiff clay black cotton hard red earth, shales,murram,grave stoney earth and art mixed small size boulders and gravely soil SS 20 A Street roads
Add Relevent T.N.D.S.S No 20A Rates for New Tank Bunds and closing breaches for Extra watering and consolidation by power Roller Including hire charges
Provision for Demarcation stone
Baby pond lining wall
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B.
Supplying and filling with Good M.Sand including Cost and conveyance, labour charges etc, Complete.,
C.C.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and erection of Steel Centering and all labour Charges etc.complete
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete.
Bhathing Ghat
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B.
Supplying and filling with Good M.Sand including Cost and conveyance, labour charges etc, Complete.,
C.C.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and erection of Steel Centering and all labour Charges etc.complete
C.C.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4" and conveyance of all materials to site and all labour charges etc complete
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
Exterior Emulsion two coats with best approved Plastic Emulsion including cost and conveyance of all materials to site and all labour charges etc complete
Inlet & Outlet Structure
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B.
Supplying and filling with Good M.Sand including Cost and conveyance, labour charges etc, Complete.,
C.C.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and erection of Steel Centering and all labour Charges etc.complete
C.C.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and fixing RCC 600mm dia pipe including cost and conveyance of all etc., complete
Supply and fixing RCC 600mm dia collar including cost and conveyance of all etc., complete
Labour charges for fixing RCC pipe to proper line and gradient and fixing the collar, finishing with cement mortar including cost and conveyance of all materials and labour charges etc., complete.
Retaining Wall
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B.
Supplying and filling with Good M.Sand including Cost and conveyance, labour charges etc, Complete.,
C.C.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and erection of Steel Centering and all labour Charges etc.complete
C.C.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M Vetrivel
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .