Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
1 Mar 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DGM JKPCC Ltd Unit Baramulla
DGM JKPCC Ltd Unit Baramulla
Balance work of Gojidajji Bridge at Baramulla
2021_PWDJK_115809_1
75/DGM/JKPCC/Baramulla of 2020-21
Open Tender
Civil Works
Item Rate
45 days
Baramulla
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Yes
FC JKPCC Ltd a/c
Yes
3 Mar 2021
8 Feb 2021
2 Mar 2021
8 Feb 2021
1 Mar 2021
8 Feb 2021
90 days
Amount
PART A-SUBSTRUCTURE
Retrieving of poplar wooden poles of different dia 12" for retaining of excavated earth for abutment A2, retension of existing road perimeter of trench including loading, unloading complete job
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. (SAIL )
Fixing of formwork of abut A2 lifts three including propping, tightening, (material available at site)
Centering and shuttering including strutting, propping etc. and removal of form for:Columns, pillars, piers, abutments, posts and struts.
Providing and laying in position machine batched and machine mixed design mix M-30 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. All works above plinth level upto floor V level
Providing weep holes in abutment wall using 100Dia PVC Pipe 1.0M long with filter media- Providing weep holes in reinforced cement concrete Abutment ,wing walls with 100mm AC pipes extending through full width of structure with slope 1V:20H towards drawing face complete as per drawing and technical specifications.
Providing ,laying behind abutment granular material(filter media) as per IRC Specifications complete with rolling and compaction-Back filling behind abutment, wing wall & return wall complete as per drawing and specificaton
PART B-CRATE protection works
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil :
Constructing vertical bunds with sloping faces, by boulder filling (dry, hand packed tightly); including cost of stones but excluding cost of wirecrates
supply & fixing of wire-crate of 4mm dia G.I wire mesh 100x100mm weaved digonally, complete including cost of a material,carriage, stetching, and binding top after filling with stone boulders in dry complete as per direction of Engineer-in-charge excluding cost of stone boulders but including cost of weaven wire crates
Filling behind crate work by way of GSB/Nallah boulders including laying , hand packing , loading, unloading, cost of material and carriage upto siteof work complete job as per direction of Engineer-in-charge.
Note:- The key construction material such as TMT steel /shuttering materail partly available at site and the agency shall be bound to consume that. The deduction shall be made at the issue rates at the time of payment of his workdone bills
Note:- All BOQ items are incl. cost & carriage of material complete job.
MOHAMMAD SHAFI ZARGAR GOVT CONTRACTOR
BASHIR AHMAD LONE
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .