Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | ₹6.2 L Quoted ₹6.0 L | L1 | Accepted-AOC 615077.15 |
| 2 | L2₹6.0 LRejected-Finance | ₹6.0 L | L2 | Rejected-Finance REjected |
| 3 | L3₹6.4 LRejected-Finance | ₹6.4 L | L3 | Rejected-Finance Rejected |
| 4 | L4₹6.4 LRejected-Finance | ₹6.4 L | L4 | Rejected-Finance REjected |
| 5 | L5₹6.7 LRejected-Finance | ₹6.7 L | L5 | Rejected-Finance Rejected |
Tender Value
₹10 L
EMD Value
₹1.0 L
Closing Date
18 Mar 2026, 12:00 pmClosed
EE PD PWD SHAHJAHANPUR
EE PD PWD SHAHJAHANPUR
New Construction Work of Village Tikri to Bablu House to Satyapal House Road In Distt. Shahjahanpur.(Fin Year 2025-26)
2026_CEBLY_1123118_1
709/12A Dt. 28-02-2026
Open Tender
Civil Works - Roads
60 days
SHAHJAHANPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹1.0 L
Yes
23 May 2026
13 Mar 2026
18 Mar 2026
13 Mar 2026
18 Mar 2026
13 Mar 2026
Construction of embankment with approved material obtained from side borrow pitsof road with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000.0 m as per Technical Specification Clause 301.5 (Carted Earth)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.
Construction of un-reinforced dowel jointed at expansion and Construction Joint only plain cement concrete pavement thickness as per design over a prepared sub-base with 43 grade cement as per clause 1501.2.2 M.-30 (Grade), coarse and fine aggregate conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.20 cum Capacity and appropriate weight batcher using approved mix design laid in approved fixed side formwork (Steel Channel, Laying and fixing of 125 micron thick polythene film, wedges, steel Plats including Levelling the form work as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, contraction joints, applying debonding stries, primar, sealant,dowel bar near approaches to bridge / culvert and contraction joints, admixtures as approved, curing of concrete slabs for 14 Days, curing compound,(where specified) and water finishing to lines and grades as per drawing and Technical Specification. Clause. 1501.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification clause 300 and Sr. No. 11.5 & 300.
Providing concrete for plain/reinforced concrete 1:3:6 in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 and Sr. No. 11.4 & 800 &1200
Providing concrete for plain/reinforced concrete in Substructure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807, 1202 and 1204 (CC grade M-20)
Supply, Fitting and Placing HYSD bar reinforcement in substructure complete as per drawings and technical specifications Clause 1002, 1005, 1010 and 1202
Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 and Sr. No. 11.5 & 600 & 1200.
Plastering with cement mortar (1:4) on brick work as per drawing and technical specification Clauses 613.4 and 1204 Sr. No. 12.3 & 600
2 CM 3/4" thick damp proof course with cement and. approved coarse sand 1:2 and including water proofing materials as ordered by the Engineer-in-Icharge in the proportion as specified by the manufactuers including supply of all materials, labour and T&P etc. required for proper completion of the work and including proper curing and shuttering as necessary.
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_2091961.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid