Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.6 LAccepted-AOC | ₹51.6 L | L1 | Accepted-AOC Work allotted |
| 2 | L2₹52.4 L+₹81,477 (1.58%)Rejected-Finance PLOT NO 301 SECTOR 17 FARIDABAD FARIDABAD HARYANA 121002 | FARIDABAD | HARYANA | 121002 | ₹52.4 L+₹81,477 (1.58%) | L2 | Rejected-Finance Rate are at higher side |
| 3 | L3₹53.8 L+₹2.3 L (4.38%)Rejected-Finance KADARPUR ROAD KADARPUR ROAD NEAR PARJAPATI DHARAMSHALA BADSHAPUR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | ₹53.8 L+₹2.3 L (4.38%) | L3 | Rejected-Finance Rate are at higher side |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Parveen Kumar Contractor L3 | M/s M.L.Enterprises L2 | Faalvi Engineering Solutions L1 |
|---|---|---|---|---|---|---|
| 1.00 | maintenance of pump 30 HP, PUMP 40HP, MOTOR 40 HP, MOTOR 20 HP, Electrical panel. | 24 | Per Month | 87,009 ₹20,88,216 | 87,000 ₹20,88,000 | 85,000 ₹20,40,000 Lowest |
| 2.00 | operational cost for disposal i.e. sewerman, electrician, operator. | 24 | Per Month | 1,36,000 ₹32,64,000 | 1,30,000 ₹31,20,000 | 1,28,630 ₹30,87,120 Lowest |
Tender Value
₹51.6 L
EMD Value
₹1.0 L
Closing Date
18 Apr 2026, 6:55 pmClosed
SATPAL
Municipal Corporation Faridabad
Operation and Maintenance of machinery on contract bases rajiv colony disposal(Due to NGT complaint ) of ward no. 01 in division 01 NIT Faridabad. for two year
2026_HRY_514626_1
2026B2D268AE F262 462C AF9A 698EB375AFD8284ULB
Open Tender
Civil Works
Works
730 days
Faridabad (MC)
2 documents required · 2 mandatory
₹5,000
₹1.0 L
Yes
13 May 2026
11 Apr 2026
20 Apr 2026
11 Apr 2026
18 Apr 2026
11 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | maintenance of pump 30 HP, PUMP 40HP, MOTOR 40 HP, MOTOR 20 HP, Electrical panel. | - | Per Month | - | - |
| 2 | operational cost for disposal i.e. sewerman, electrician, operator. | - | Per Month | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_593455.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .