Tender Value
₹77.8 L
EMD Value
₹1.6 L
Closing Date
11 Aug 2026, 3:30 pm
Repair & Comprehensive Annual Maintenance Contract (CAMC) of IPIS Integrated Passenger Information System installed at Prayagraj Sangam (PYGS), Barabanki (BBK) and Raebareli (RBL) Railway Station (Make: Advance Hitech) for Three years over Lucknow Division of Northern Railway.
106-Tele_Tender_22_26-27
106-Tele_Tender_22_26-27
Open
Works - General
36 Months
Rae Bareli, Uttar Pradesh
₹0
₹1.6 L
21 Jul 2026
21 Jul 2026
28 Jul 2026
A-SCHEDULE-A Repair of COACH GUIDANCE DISPLAY BOARD
Repairing, testing and installation of defective Coach Guidance Display Boards (double faced) CGDBs. All required materials/cards to be supplied by Contractor.
B-SCHEDULE-B COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT
Comprehensive AMC of Double Faced Coach Guidance Display Boards As per RDSO 02 Specification : RDSO/SPN/TC/61/2015/2019,Ver.-4.0/0.0 or latest" . Total no. of Double Faced Coach Guidance Display Boards as under- PYGS- 97 Working + 14 Faulty = 97x36 + 14x30 =3912 Number- Month BBK-26 Working + 22 Faulty = 26x36 + 22x30 =1596 Number-Month RBL-44 Working = 44x36 = 1584 Number-Month Total - 3912+1596+1584 = 7092 Number-Month Number-
Comprehensive AMC of Central Data Controller (CDC)with all accessories including Central Data Switch as per Specification No. RDSO/SPN/TC/108/2015/2019, Ver.-4.0/0.0 or Latest for 03 IP Based Integrated Passenger Information System (IPIS) loaded withOperating (driving) software as per Specification No.RDSO/SPN/TC/108/2015/2019, Ver.-0.0 / 4.0 ammdt 1 or latest. Total no. of Central Data Controller (CDC) with all accessories including Central Data Switch as under- PYGS- 1x36=36 Number-Month BBK-1x36=36 Number-Month RBL-1x36=36 Number-Month Total - 36+36+36 = 108 Number-Month Number-
Comprehensive AMC of Loaded with Operating (driving) software as per Specification No.RDSO/SPN/TC/108/2015/2019, Ver.-0.0 / 4.0ammdt 1 or latest. Total no.of Loaded with Operating(driving) software =1 no. , Total no.in 36 months as under- PYGS- 1x36=36 Number-Month BBK-1x36=36 Number-Month RBL-1x36=36 Number-Month Total - 36+36+36 = 108 Number-Month Number-
Comprehensive AMC of platform data controller asper Specification No. RDSO/SPN/TC/108/2015/2019, Ver.-4.0/0.0 or Latest. Total no. of platform data controller in 36 months as under- PYGS- 5x36=180 Number-Month BBK-2x36=72 Number-Month RBL-2x36=72 Number-Month Total - 180+72+72 = 324 Number-Month Number-
Comprehensive AMC of LED based Single faced Five line Train arrival/departure 06 display board as per RDSO's Specification No RDSO/SPN/TC/108/2015/2019, Ver.-4.0/0.0 or latest. Suitable clamping arrangement and all consumable materials including steel frame to be supplied by the contractor.Total no. of LED based Single faced Five line Train arrival/departure display board in 36 Months as under- PYGS- 2x36=72 Number-Month BBK-1x36=36 Number-Month RBL-4x36=144 Number-Month Total - 72+36+144 = 252 Number-Month Number-
Comprehensive AMC of Single line double faced Train Arrival Departure Display Board As per RDSO Specification RDSO/SPN/TC/61/2015/2019,Ver.-4.0/0.0 or latest. Total no.of Single line double faced Train Arrival Departure Display Board as under- BBK- 2x36=72 Number-Month Total - 72 Number-Month. Number-
Comprehensive AMC of LED based Single double faced At a Glace display board As per RDSO Specification RDSO/SPN/TC/61/2015/2019,Ver.-4.0/0.0 or latest. Totalno. of LED based Single double faced At a Glace display board in 36 months as under - PYGS- 2x36=72 Number-Month RBL-6x36=216 Number-Month Total - 72+216 = 288 Number-Month Number-
Comprehensive AMC of 05KVA UPS at least 1 hour battery back up in full load 09 condition complete with all accessories as per technical Specification Make: NUMERIC/ APC /MICROTEK or similar. Thisalso includes maintenanceof battery rack MCBs complete with cover & fixing materials, SMF/VRLA batteries for 04years. Total quantity in 36 months as under- PYGS- 1x36=36 Number-Month BBK-1x36=36 Number-Month RBL-1x36=36 Number-Month Total - 36+36+36 = 108 Number-Month Number-
Comprehensive Annual Maintenance contract of 2 KVA/2.75 KVA capacity UPS along with sealed maintenance free battery bank and other associated accessories PYGS- 1x36=36 Number-Month BBK-1x36=36 Number-Month RBL-1x36=36 Number-Month Total - 36+36+36 = 108 Number-Month Number-
Comprehensive AMC of 4 digit GPS synchronised digital clock (double side) with all 11 accessories as per RDSO Specification RDSO/SPN/TC47>472008Rev. 3.0 amndt. 1 and Amndt-2 or latest. Total no. of4 digit GPS synchronised digital clock (double side) with all accessories. Total qty as under- PYGS- 14x36=504 Number-Month BBK-6x36=216 Number-Month RBL-6x36=216 Number- Month Total - 504+216+216 = 936 Number-Month
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACSGCC22-231to6.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipno7-10.pdf
ATTACHMENT
GCC_April-2022_1.pdf
ATTACHMENT
GCCACS11.pdf
ATTACHMENT
TD-22.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].