Tender Value
₹4.9 L
EMD Value
₹4,910
Closing Date
30 Jan 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of Retaining Wall Work for Anupanady Channel at PetchiammanPadithurai Road in Ward No51Zone-3
2025_MAWS_517544_1
Z3/ E2 / EST 71/ 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,910
5 Mar 2025
13 Jan 2025
30 Jan 2025
13 Jan 2025
30 Jan 2025
13 Jan 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram,gravel,stoney earth and earth mixed with small sizeboulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil,sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc., complete 10 cum. The Rate inclusive of all charges such as Earth work and remove the same away from the site etc, complete as per standard specifications. Building 24-25 Page - 2
Supplying and filling in foundation and basement with Quarry Dust in layers of not more than15cm.thick well rammed watered and compacted etc., complete complying with standard specification. Building 23-24 Page - 27
Cement concrete 1:4:8 (one cement four sand and eight aggregates) Using 40mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.Building 24-25 Page - 4
Supplying and erecting shuttering with necessary supports for plith beam with all cross brancings etc..,complete(Rcc coloumn footing plinth beam and lintel sides)Building 24-25 Page - 7
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete Building 24-25 Page-10
Supplying and fabricating and placing of MS grills for reinforcement rate including the cost of steel for all works, the rate to include cost of steel for all works. Building 23-24 Page - 39
Brick work in cm 1:5 (one cement five sand ) using 2nd class bricks in cluding cost of also materials labour charges. Curing etc complete and director by corporation officers III Class Country Brick Building 24-25 Page -5
Plastering with CM1:5(one cement and five sand) 12mm thick10m2. Building 24- 25 Page 7
White washing two coats with best lime stone including gum and cungee water etc. complete 10m2 SI No.338 rate for 10m2. Building 24-25 Page -12
Add GST 18%
VEEKAY INDUSTRIES (BID ID -1238974)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .