Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC GANGASAGAR PO SAGAR | ₹4.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.0 L+₹20,510.88 (4.26%)Rejected-Finance ALAMPUR NODAKHALI | ₹5.0 L+₹20,510.88 (4.26%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹5.2 L+₹35,102.08 (7.29%)Rejected-Finance 364 ASHOK ROAD 94 GANGULY BAGAN EAST ROAD KOLKATA 700084 | KOLKATA | 24 PARAGANAS SOUTH | WEST BENGAL | 700084 | ₹5.2 L+₹35,102.08 (7.29%) | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | MS BABUSONA ENTERPRISE L1 | S. P. CONSTRUCTION L2 | PS AND ASSOCIATES L3 |
|---|---|---|---|---|---|---|
| 1.00 | Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation at tube well and back after mela period as per direction of EIC. | 12 | Items | 3,239 ₹38,868 Lowest | 3,242 ₹38,904 | 3,245 ₹38,940 |
| 2.00 | Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department) | 12 | Items | 2,358 ₹28,296 Lowest | 2,360 ₹28,320 | 2,362 ₹28,344 |
| 3.00 | Carrying & installation of 10 KVA/ 15 KVA gen set at different tube wells of mela ground by supplying required materials as per direction of EIC. | 12 | Nos | 835 ₹10,020 Lowest | 840 ₹10,080 | 842 ₹10,104 |
| 4.00 | Running & maintenance of different capacity engine driven generator set at different Tube wells including supply of fuel, lubricant, sundries and skilled personnel as necessary as per direction of EIC for running Submersible pump set . [12 kw x 3 Days x 10 Hrs x 12 Nos] | 4,320 | Kwhr | 30 ₹1,29,600 Lowest | 32 ₹1,38,240 | 34 ₹1,46,880 |
| 5.00 | Carrying of 12 Nos. departmental MCC cum power distribution panel board from store to different tube well site and return to store including storage after mela as per direction of EIC. | 1 | Item | 2,190 ₹2,190 Lowest | 2,192 ₹2,192 | 2,194 ₹2,194 |
| 6.00 | Installation of MCC cum power distribution panel boards for power supply to pumping machinery including electrical inter connection from departmental Panel Board to pump motor, chlorine machine etc. including proper earthing arrangement complete as per direction of EIC. | 12 | Sets | 1,157 ₹13,884 Lowest | 1,160 ₹13,920 | 1,162 ₹13,944 |
| 7.00 | Running of submersible pump sets at tube well by supplying skilled operating staff as per direction. 3 days x 10 Hrs. x 12 sets | 360 | Hrs | 54 ₹19,440 Lowest | 55 ₹19,800 | 57 ₹20,520 |
| 8.00 | Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC | 12 | Nos | 1,983 ₹23,796 Lowest | 1,985 ₹23,820 | 1,987 ₹23,844 |
| 9.00 | Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work. [for 12 Nos. Machine] | 3 | Days | 885 ₹2,655 Lowest | 887 ₹2,661 | 890 ₹2,670 |
| 10.00 | Supply and delivery of 20 mm dia nylon rope | 1,250 | ft | 14 ₹17,500 Lowest | 20 ₹25,000 | 22 ₹27,500 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
21 Jan 2026, 9:00 amClosed
Executive Engineer SMD PHE Dte
Chetla
Water supply arrangement at Ganga Sagar Mela Ground for Maghipurnima 2026 in continuation with Ganga Sagar Mela 2026
2026_PHED_982399_8
WBPHE/EE/SMD/NIeT-57 of 2025-26
Open Tender
Electrical Work/ Equipment
Item Rate
35 days
Ganga Sagar
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
29 Jul 2026
9 Jan 2026
23 Jan 2026
9 Jan 2026
21 Jan 2026
9 Jan 2026
Carrying of submersible pump set, column pipe, valves and specials from Ganga Sagar Store to work site for installation at tube well and back after mela period as per direction of EIC.
Installation the above submersible set with column pipe by supplying necessary materials and tools on hire basis and skilled labour complete as per direction of EIC (pump sets column pipes etc to be supplied by department)
Carrying & installation of 10 KVA/ 15 KVA gen set at different tube wells of mela ground by supplying required materials as per direction of EIC.
Running & maintenance of different capacity engine driven generator set at different Tube wells including supply of fuel, lubricant, sundries and skilled personnel as necessary as per direction of EIC for running Submersible pump set . [12 kw x 3 Days x 10 Hrs x 12 Nos]
Carrying of 12 Nos. departmental MCC cum power distribution panel board from store to different tube well site and return to store including storage after mela as per direction of EIC.
Installation of MCC cum power distribution panel boards for power supply to pumping machinery including electrical inter connection from departmental Panel Board to pump motor, chlorine machine etc. including proper earthing arrangement complete as per direction of EIC.
Running of submersible pump sets at tube well by supplying skilled operating staff as per direction. 3 days x 10 Hrs. x 12 sets
Temporary installation of positive/ swellore make chlorine dosing pump motor set with all accessories to its existing base and withdrawing the same and storage to the departmental store after Mela as per direction of the EIC
Running maintenance of the chlorine machine during mela period for proper dosing of chlorine solution including minor repairing of the pump and motor with supply of all necessary materials for the entire work. [for 12 Nos. Machine]
Supply and delivery of 20 mm dia nylon rope
Supply and delivery of 80 mm dia MS Top-bottom adopter set
Withdrawing the submersible pump-motor set from the existing position where installed for water supply after mela including storage to departmental Store at Ganga Sagar as per direction of E.I.C.
Hiring of derrick arrangement
Withdrawing the generating set from the existing position where installed for water supply after mela including storage to departmental Store at Ganga Sagar as per direction of E.I.C.
Guarding arrangement of the whole installation of the above item for the entire period round the clock. ( 1 Person per shift x 2 shift per day x 12 location x 3 days )
Add GST @ 18%
Add CESS @ 1%
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 1.00 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_2404284.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .