Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 LAccepted-AOC HARYANA HR | GURUGRAM | HARYANA | 122502 | L1 | Accepted-AOC Minimum Rates | |
| 2 | L2₹5.5 L+₹22,050 (4.20%)Rejected-Finance | L2 | Rejected-Finance EMD Refunded | |
| 3 | L3₹5.6 L+₹35,280 (6.72%)Rejected-Finance | L3 | Rejected-Finance EMD Refunded. |
| Sl No | Description | Qty | Unit | J. S. Electrical L2 | jarnail singh cont, L3 | RINKU CHAUDHRI L1 |
|---|---|---|---|---|---|---|
| 1.00 | Repair of Submersible / Horizontal pumping sets for tubewell/ Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works.
Submersible Motor Upto 20 BHP
20.00 BHP x 2 No = 40.00 BHP
Total = 40.00 BHP x 12 = 480.00 | 40 | Per BHP Per Month | 124 ₹59,520 | 127 ₹60,960 | 119 ₹57,120 Lowest |
| 2.00 | Submersible Motor More than 20 BHP
22.50 BHP x 2 No = 45.00 BHP
25.00 BHP x 9 No = 225.00 BHP
Total = 270.00 BHP x 12 = 3240.00 | 270 | Per BHP Per Month | 124 ₹4,01,760 | 127 ₹4,11,480 | 119 ₹3,85,560 Lowest |
| 3.00 | Horizontal Motor Upto 20 BHP
12.50 BHP x 01 No = 12.50 BHP
20.00 BHP x 01 No = 20.00 BHP
Total = 32.50 BHP x 12 = 390.00 | 32.5 | Per BHP Per Month | 124 ₹48,360 | 127 ₹49,530 | 119 ₹46,410 Lowest |
| 4.00 | Horizontal Motor More than 20 BHP
25.00 BHP x 01 No = 25.00 BHP
Totla = 25.00 BHP x 12 =300.00 | 25 | Per BHP Per Month | 124 ₹37,200 | 127 ₹38,100 | 119 ₹35,700 Lowest |
Tender Value
₹5.7 L
EMD Value
₹11,380
Closing Date
20 Aug 2025, 3:00 pmClosed
SAMEER SHARMA
Panchkula PHED
Repair of pumping machinery of existing Tubewell and Booster of Block Raipur Rani District Panchkula and all other works contingent thereto For One Year Under Sub Division Raipur Rani
2025_HRY_464922_1
2025B7BEDEF8 44B6 4074 96DD 91509FC8A9E0547PUH
Open Tender
Civil Works
Works
365 days
RAIPUR RANI
2 documents required · 2 mandatory
₹1,000
Yes
₹11,380
Yes
1 Sept 2025
13 Aug 2025
20 Aug 2025
13 Aug 2025
20 Aug 2025
13 Aug 2025
Amount
Repair of Submersible / Horizontal pumping sets for tubewell/ Booster only Consisting mainly of motor, pump, electrical control panel, starter, cable and all accessories, sluice valves, non return valves specials etc. including all appurtenances inside the premises of water works. Submersible Motor Upto 20 BHP 20.00 BHP x 2 No = 40.00 BHP Total = 40.00 BHP x 12 = 480.00
Submersible Motor More than 20 BHP 22.50 BHP x 2 No = 45.00 BHP 25.00 BHP x 9 No = 225.00 BHP Total = 270.00 BHP x 12 = 3240.00
Horizontal Motor Upto 20 BHP 12.50 BHP x 01 No = 12.50 BHP 20.00 BHP x 01 No = 20.00 BHP Total = 32.50 BHP x 12 = 390.00
Horizontal Motor More than 20 BHP 25.00 BHP x 01 No = 25.00 BHP Totla = 25.00 BHP x 12 =300.00
J. S. Electrical (BID ID -1319781)
jarnail singh cont, (BID ID -1318093)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .