Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.
NBCC/SBGDelhill/IPO/AddlWork/2024/74Dated04072024
NBCC/SBGDelhill/IPO/AddlWork/2024/74Dated04072024
Open Tender-Domestic
Civil Works General
New Delhi, Delhi
₹11,800
₹3.5 L
9 Aug 2024
4 Jul 2024
18 Jul 2024
18 Jul 2024
2 Aug 2024
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
2.1 EARTH WORK
2.6 2.2.1 Earth work in excavation by mechanical means
(Hydraulic excavator) / manual means over areas
(exceeding 30cm in depth, 1.5m in width as well as
10 sq.m on plan) including disposal of excavated
earth, lead upto 50m and lift up to 1.5m, disposed
earth to be levelled and neatly dressed.
2.25 2.2.2 Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers
not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to
50 m and lift upto 1.5 m.
2.26 2.2.3 Extra for every additional lift of 1.5 m or part thereof
in excavation / banking excavated or stacked
CARRIAGE OF MATERIALS
1.1 2.4.1 By Mechanical Transport including loading,unloading
2.2 CONCRETE & RCC WORK
4.1 2.2.1 Providing & laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work up to plinth level.
BOQ_RWH 8 Digitally signed by ARTI
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
4.1.8 2.2.1.1 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived
from natural sources : 8 graded stone aggregate 40
mm nominal size derived from natural sources) Cum 2.65 6,812.00 18,051.80
5.9 2.2.2 Centring and shuttering including strutting, propping
etc. and removal of form for:
5.9.1 2.2.2.1 Foundations, footings, bases of columns etc. for
mass concrete. Sqm 19 392.15 7,450.85
5.9.2 2.2.2.2 Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.
5.9.3 2.2.2.3 Suspended floors, roofs, landings, balconies and
access platform.
5.9.5 2.2.2.4 Lintels, beams, plinth beams, girders, bressumers
and cantilevers. sqm 736.40
5.11 2.2.3 Extra for additional height in centering, shuttering
where ever required with adequate bracing, propping
etc., including cost of de-shuttering and decentering
at all levels, over a height of 3.5 m, for every
additional height of 1 metre or part thereof (Plan area
to be measured).
5.11.1 2.2.3.1 Suspended floors, roofs, landing, beams and
balconies sqm 36 384.30 13,834.80
(Plan area to be measured)
5.22 2.2.4 Steel reinforcement for RCC work including
straightening, cutting, bending, placing in position
and binding all complete upto plinth level.
5.22.6 2.2.4.1 Thermo-Mechanically Treated bars of grade Fe-
BOQ_RWH 9 Digitally signed by ARTI
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.33 2.2.5 Providing and laying in position ready mixed or site
batched design mix cement concrete for reinforced
cement concrete work; using coarse aggregate and
fine aggregate derived from natural sources,
Portland Pozzolana / Ordinary Portland /Portland
Slag cement, admixtures in recommended
proportions as per IS: 9103 to accelerate / retard
setting of concrete, to improve durability and
workability without impairing strength; including
pumping of concrete to site of laying, curing, carriage
for all leads; but excluding the cost of centering,
shuttering, finishing and reinforcement as per
direction of the engineer-in-charge; for the following
grades of concrete
Note: Extra cement up to 10% of the minimum
specified cement content in design mix shall be
payable separately. In case the cement content in
design mix is more than 110% of the specified
minimum cement content, the contractor shall have
discretion to either re-design the mix or bear the cost
of extra cement.
5.33.1 2.2.5.1 All works up to Plinth level.
5.33.1.1 (a) Concrete of M25 grade with minimum cement
content of 330 kg /cum cum 39 9,504.75 3,70,685.25
5.35 2.2.6 Add for using extra cement in the items of design mix
over and above the specified cement content therein.
22.4 2.2.7 Providing and Placing in position suitable PVC water
stops conforming to IS:12200 for construction/
expansion joints between two RCC members and
fixed to the reinforcement with binding wire before
pouring concrete etc. complete :
BOQ_RWH 10 Digitally signed by ARTI
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
22.4.2 2.2.7.1 Dumb bell with central bulb (180 mm wide, 8 mm
thick) metre 76 267.90
2.3 FINISHING (PLASTER WORK)
13.9 2.3.1 Cement plaster 1:3 (1 cement: 3 coarse sand)
finished with a floating coat of neat cement.
2.4 MISCELLANEOUS WORKS FOR RAIN WATER
19.16 2.4.1 Providing orange colour safety foot rest of minimum
6 mm thick plastic encapsulated as per IS : 10910 on
12mm dia steel bar conforming to IS : 1786 having
minimum cross section as 23 mmx25mm and over
all minimum length 263 mm and width as 165mm
with minimum 112 mm space between protruded
legs having 2 mm tread on top surface by ribbing or
chequering besides necessary and adequate
anchoring projections on tail length on 138 mm as
per standard drawing and suitable to with stand the
bend test and chemical resistance test as per
specifications and having manufacture's permanent
identification mark to be visible even after fixing,
including fixing in manholes with 30x20x15 cm
cement concrete block 1:3:6 (1 cement : 3 coarse
sand : 6 graded stone aggregate 20 mm nominal
size) complete as per design.
19.19 2.4.2 Providing and fixing in position pre-cast R.C.C.
manhole cover and frame of required shape and
approved quality.
19.19.3.1 (a) Circular shape 560 mm internal diameter Each 1 1,675.70 1,675.70
BOQ_RWH 11 Digitally signed by ARTI
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
NS 2.4.3 Supplying, filling, spreading & leveling brick
aggregate of size 50 -63mm , in recharge pit, in the
required thickness, for all leads & lifts, all complete
as per direction of Engineer-in-charge. Cum 18 1,227.00 22,086.00
NS 2.4.4 Supplying, filling, spreading & leveling Charcoal
activated carbon, in the recharge pit, over the
existing layer of brick aggregate, in required
thickness, for all leads & lifts, all complete as per
direction of Engineer-in-charge. Cum 3.3 21,716.00 71,662.80
23.7 2.4.5 Supplying, filling, spreading & leveling coarse sand of
mm to 2 mm in recharge pit, in required thickness
over gravel layer,
for all leads & lifts, all complete as per direction of
Engineer -incharge. Cum 7 1,538.25 10,767.75
NS 2.4.6 Providing & laying 120GSM Geotextile/Geo fabric
over coarse sand bed Sqm 33 193.83 6,396.39
TOTAL OF RAIN WATER HARVESTING WORKS
TOTAL OF RWH CHAMBER (4 NOS.) CARRIED
OVER TO GRAND SUMMARY OF COSTS 52,60,876.00 4,00,580.76
BOQ_RWH 12 Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at
additional floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
100 KLD STP - SUMMARY OF WORKS (figures in Rs.)
Sl. No. Chapter Description/ Head of work
Scheduled Items (Rs.) Non Scheduled items (Rs.)
3.A CIVIL WORKS
3.A.1 Earth Work 2,57,719.25
3.A.2 Concrete Work 1,47,786.00
3.A.4 Brick Work 2,87,891.60
3.A.5 Wood Work 1,524.10
3.A.6 Steel Work 85,629.50
3.A.7 Flooring Work 6,33,960.10
3.A.8 Roofing Work 15,776.85
3.A.9 Water Proofing Work 8,76,677.10
3.A.10 Finishing Work 1,64,997.90
3.A.11 Miscellaneous Work 1,04,320.75
3.A.12 Pavement Work 78,581.50
3.A.13 Fencing Work 1,54,055.55
TOTAL OF CIVIL WORKS 63,89,907.25
STP_SUM-CV 13 Digitally signed by ARTI
3.B ELECTROMECHANICALWORKS
3.B.1 ELECTROMECHANICAL WORK 53,97,320.00
3.C ELECTRICAL WORK
3.C.1 ELECTRICAL WORK 1,23,660.73 76,742.00
TOTAL OF ELECTROMECHANICAL &
ELECTRICAL WORKS 1,23,660.73 54,74,062.00
TOTAL OF STP WORKS (Rs.) 119,87,629.98
STP_SUM-CV 14 Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at
additional floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
BOQ - 100 KLD STP
CHAPTER 3 - A & B- CIVIL & ELECTROMECHANICAL WORKS
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.A.1 EARTH WORK
2.6 3.A.1.1 Earthwork in excavation by mechanical means (hydraulic
excavator)/manual means over areas (exceeding 30cm
in depth, 1.5m in width as well as 10sqm on plan)
including disposal of excavated earth lead upto 50m and
lift upto 1.5m, disposed earth to be levelled and neatly
2.6.1 3.A.1.1.1 All kinds of soil
2.25 3.A.1.2 Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm in depth: consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift
2.26 3.A.1.3 Extra for every additional lift of 1.5 m or part thereof in
excavation / banking excavated or stacked materials.
2.26.1 3.A.1.3.1 All kinds of soil
2.27 3.A.1.4 Supplying and filling in plinth with sand under floors,
including watering, ramming, consolidating and dressing
CARRIAGE OF MATERIALS
1.1 3.A.1.5 By Mechanical Transport including loading,unloading
TOTAL OF EARTH WORK CARRIED OVER TO 2,57,719.25 -
BOQ_STP 15 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.A.2 CONCRETE WORK
4.1 3.A.2.1 Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work upto plinth level.
4.1.3 3.A.2.1.1 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from
natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) cum 1 7,878.50 7,878.50
4.1.6 3.A.2.1.2 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from
natural sources : 6 graded stone aggregate 40 mm
nominal size derived from natural sources) cum 10 7,178.75 71,787.50
4.1.8 3.A.2.1.3 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from
natural sources : 8 graded stone aggregate 40 mm
nominal size derived from natural sources) cum 10 6,812.00 68,120.00
TOTAL OF CONCRETE WORK CARRIED OVER TO 1,47,786.00 -
SUMMARY OF WORKS
3.A.3 R.C.C WORKS
5.9 3.A.3.1 Centring and shuttering including strutting, propping etc.
and removal of form for:
5.9.1 3.A.3.1.1 Foundations, footings, bases of columns etc. for mass
5.9.2 3.A.3.1.2 Walls (any thickness) including attached pilasters,
butteresses, plinth and string courses etc.
5.9.3 3.A.3.1.3 Suspended floors, roofs,landings, balconies and access
5.9.4 3.A.3.1.4 Shelves (Cast in situ)
5.9.5 3.A.3.1.5 Lintels, beams, plinth beams, girders, bressumers and sqm 45 736.40 33,138.00
5.9.6 3.A.3.1.6 Columns, Pillars, Piers, Abutments, Posts and Struts
5.9.15 3.A.3.1.7 Small lintels not exceeding 1.5m clear span, moulding as
in cornices, window sills, string courses, bands, copings,
bed plates, anchor blocks and the like sqm 7 392.15 2,745.05
5.9.16 3.A.3.1.8 Edges of slabs and breaks in floors and walls
BOQ_STP 16 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.9.16.1 3.A.3.1.9 Under 20 cm wide
5.9.19 3.A.3.1.10 Weather shade, Chajjas, corbels etc., including edges
5.11 3.A.3.2 Extra for additional height in centering, shuttering where
ever required with adequate bracing, propping etc.,
5.11.1 including cost
3.A.3.2.1 Suspended of de-shuttering
floors, andbeams
roofs, landing, decentering at all
(Plan area to be measured) sqm 30 384.30 11,529.00
5.22 3.A.3.3 Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
5.22.6 3.A.3.3.1 binding all complete upto
Thermo-Mechanically plinthbars
Treated level.of grade Fe-500 D or
5.22A 3.A.3.4 Steel reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
5.22A.6 3.A.3.4.1 binding all complete above
Thermo-Mechanically plinth
Treated level.
bars of grade Fe-500 D or Kg 2500 107.85 2,69,625.00
5.30 3.A.3.5 Add for plaster drip course/ groove in plastered surface
or moulding to R.C.C. projections. metre 19 78.40 1,489.60
5.33 3.A.3.6 Providing and laying in position ready mixed or site
batched design mix cement concrete for reinforced
cement concrete work; using coarse aggregate and fine
aggregate derived from natural sources, Portland
Pozzolana / Ordinary Portland /Portland Slag cement,
admixtures in recommended proportions as per IS: 9103
to accelerate / retard setting of concrete, to improve
durability and workability without impairing strength;
including pumping of concrete to site of laying, curing,
carriage for all leads; but excluding the cost of centering,
shuttering, finishing and reinforcement as per direction of
Note: Extra cement up to 10% of the minimum specified
cement content in design mix shall be payable
separately. In case the cement content in design mix is
more than 110% of the specified minimum cement
content, the contractor shall have discretion to either re-
3.A.3.6.1 All theup
to or bearlevel.
Plinth the cost of extra cement.
BOQ_STP 17 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.33.1.1 3.A.3.6.2 Concrete of M25 grade with minimum cement content of
5.33.1.2 Concrete of M30 grade with minimum cement content of 350cum
5.33.2 3.A.3.7.1 All works above plinth level upto floor V level
5.33.2.1 Concrete of M25 grade with minimum cement content of
5.33.2.2 Concrete of M30 grade with minimum cement content of 350cum
5.35 3.A.3.8 Add for using extra cement in the items of design mix
over and above the specified cement content therein quintal 60 733.50 44,010.00
5.1 3.A.3.9 Providing and laying in position specified grade of
reinforced cement
concrete, excluding the cost of centering, shuttering,
5.1.3 finishing
(1 cement : 2 coarse sand (zone-III) derived from
natural sources : 4 graded stone aggregate 20 mm
nominal size derived from natural sources) cum 2 8,583.40 17,166.80
22.4 3.A.3.1 Providing and Placing in position suitable PVC water
stops conforming to IS:12200 for construction/
expansion joints between two RCC members and fixed
to the reinforcement with binding wire before pouring
concrete etc. complete.
22.4.2 3.A.3.10.1 Dumb bell with central bulb (180 mm wide, 8 mm thick)
5.41 3.A.3.11 Supplying and applying pre tested and approved water
based concrete curing compound to concrete/ masonry
surface, all as per manufacturer’s specification and
direction of Engineer-in-charge.
5.41.1 3.A.3.11.1 Non pigmented wet curing compound
TOTAL OR R.C.C WORKS CARRIED OVER TO
SUMMARY OF WORKS 35,80,987.05 -
BOQ_STP 18 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.A.4 BRICK WORK
6.1 3.A.4.1 Brick work withcommon burnt clay F.P.S.(non moduler)
bricks of class designation 7.5 in foundation and plinth in
6.1.2 3.A.4.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand)
6.4 3.A.4.2 Brick work with common burnt clay F.P.S. (non modular)
bricks of class designation 7.5 in superstructure above
plinth level up to floor V level in all shapes and sizes in :
6.4.2 3.A.4.2.1 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 23 9,105.95 2,09,436.85
TOTAL OF BRICK WORK CARRIED OVER TO
SUMMARY OF WORKS 2,87,891.60 -
3.A.5 WOOD WORK
9.62 3.A.5.1 Providing and fixing ISI marked oxidised M.S sliding
door bolts with nuts and screws etc. complete:
9.63 3.A.5.2 Providing and fixing ISI marked oxidized M.S. tower bolt
9.66 3.A.5.3 Providing and fixing ISI marked oxidised M.S. handles
conforming to IS: 4992 with necessary screws etc.
TOTAL OF WOOD WORK CARRIED OVER TO
SUMMARY OF WORKS 1,524.10 -
3.A.6 STEEL WORK
BOQ_STP 19 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
10.5 3.A.6.1 Providing and fixing 1mm thick M.S. sheet door with
frame of 40x40x6 mm angle iron and 3 mm M.S. gusset
plates at the junctions and corners, all necessary fittings
complete, including applying a priming coat of approved
10.5.1 3.A.6.1.1 Using M.S. angles 40x40x6 mm for diagonal braces. sqm 6 5,804.35 34,826.10
10.18 3.A.6.2 Providing and fixing circular/ Hexagonal cast iron or M.S.
sheet box for ceiling fan clamp, of internal dia 140 mm,
73 mm height, top lid of 1.5 mm thick M.S. sheet with its
top surface hacked for proper bonding, top lid shall be
screwed into the cast iron/ M.S. sheet box by means of
3.3 mm dia round headed screws, one lock at the
corners. Clamp shall be made of 12 mm dia M.S. bar
bent to shape as per standard drawing.
10.26 3.A.6.3 Providing and fixing hand rail of approved size by
welding etc. to steel ladder railing, balcony railing and
staircase railing including applying a priming coat of
approved steel primer.
10.16 3.A.6.4 Steel work in built up tubular (round, square or
10.16.1 3.A.6.4.1 Hot finished welded type tubes kg 40 194.40 7,776.00
10.11 3.A.6.5 Providing and fixing factory made ISI marked steel
glazed doors, windows and ventilators, side /top /centre
hung, with beading and all members such as F7D,F4B,
K11 B and K12 B etc. complete of standard rolled steel
sections, joints mitred and flash butt welded and sash
bars tenoned and riveted, including providing and fixing
of hinges, pivots, including priming coat of approved
steel primer, but excluding the cost of other fittings,
complete all as per approved design, (sectional weight of
only steel members shall be measured for payment).
BOQ_STP 20 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
10.11.1 3.A.6.5.1 Fixing with 15x3 mm lugs 10 cm long embedded in
cement concrete block 15x10x10 cm of C.C. 1:3:6 (1
Cement : 3 coarse sand : 6 graded stone aggregate 20
mm nominal size)
10.13 3.A.6.6 Providing and fixing T-iron frames for doors, windows
and ventilators of mild steel Tee-sections, joints mitred
and welded, including fixing of necessary butt hinges
and screws and applying a priming coat of approved
10.13.1 3.A.6.6.1 Fixing with 15x3 mm lugs 10 cm long embedded in
cement concrete block 15x10x10 cm of C.C. 1:3:6 (1
Cement : 3 coarse sand : 6 graded stone aggregate 20
mm nominal size).
TOTAL OF STEEL WORK CARRIED OVER TO
SUMMARY OF WORKS 85,629.50 -
3.A.7 FLOORING WORK
11.26 3.A.7.1 Kota stone slab flooring over 20 mm (average) thick
base laid over and jointed with grey cement slurry mixed
with pigment to match the shade of the slab including
rubbing and polishing complete with base of cement
mortar 1:4 (1 cement : 4 coarse sand):
11.27 3.A.7.2 Kota stone slabs 20 mm thick in risers of steps, skirting,
dado and pillars laid on 12 mm (average) thick cement
mortar 1:3 (1 cement: 3 coarse sand) and jointed with
grey cement slurry mixed with pigment to match the
shade of the slabs, including rubbing and polishing
BOQ_STP 21 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
8.31 3.A.7.3 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS: 15622 (thickness to be specified by the
manufacturer), of approved make, in all colours, shades
except burgundy, bottle green, black of any size as
approved by Engineer-in-Charge, in skirting, risers of
steps and dados, over 12 mm thick bed of cement
mortar 1:3 (1 cement : 3 coarse sand) and jointing with
grey cement slurry @ 3.3kg per sqm, including pointing
in white cement mixed with pigment of matching shade
11.37 3.A.7.4 Providing and laying Ceramic glazed floor tiles 300x300
mm (thickness to be specified by the manufacturer) of
1st quality conforming to IS : 15622 of approved make in
colours such as White, Ivory, Grey, Fume Red Brown
laid on 20mm thick Cement Mortar 1:4 (1 Cement : 4
Coarse sand) including pointing the joints with white
cement and matching pigments etc. complete.
TOTAL OF FLOORING WORK CARRIED OVER TO
SUMMARY OF WORKS 6,33,960.10 -
3.A.8 ROOFING WORK
12.21 3.A.8.1 Providing Gola 75 x 75 mm in cement concrete 1:2:4(1
cemment : 2 course sand : 4 stone aggregate 10mm &
down gauge) including finishing with cement mortar 1:3
(1 cement : 3 fine sand) as per standard design
BOQ_STP 22 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
12.22 3.A.8.2 Making khurras 45x45cm with average minimum
thickness of 5 cm cement concrete 1:2:4 (1 cement :2
coarse sand : 4 graded stone aggregate of 20mm
nominal size) over P.V.C. sheet 1m x 1m x 400 micron,
finished with 12mm cement plaster 1:3 (1 cement :3
coarse sand) and a coat of neat cement rounding the
edges and making and finishing the outlet complete
12.41 3.A.8.3 Providing and fixing on wall face unplasticised Rigid PVC
rain water pipes conforming to IS:13592 Type A
including jointing with seal ring conforming to IS:5382
leaving 10mm gap for thermal expansion.
(i) Single socketed pipes
12.42 3.A.8.4 Providing and fixing on wall face unplasticised - PVC
moulded fittings/accessories for unplasticised Rigid PVC
rain water pipes conforming to IS:13592 Type A
including jointing with seal ring conforming to IS: 5382
leaving 10mm gap for thermal expansion.
12.42.6 (ii) Shoe (Plain)
12.43 3.A.8.5 Providing and fixing unplasticised - PVC pipe clips of
approved design to unplasticised - PVC rain water pipes
by means of 50 x 50 x 50mm hard wood plugs, screwed
with M.S. screws of required length including cutting
brick work and fixing in cement mortar 1:4 (1 cement : 4
coarse sand) and making good the wall etc. complete.
BOQ_STP 23 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
12.44 3.A.8.6 Providing and fixing to the inlet mouth of rain water pipe
cast iron grating 15 cm diameter and weighing not less
than 440 grams. each 2 54.70 109.40
TOTAL OF ROOFING WORK CARRIED OVER TO
SUMMARY OF WORKS 15,776.85 -
3.A.9 WATER PROOFING WORK
22.6 3.A.9.1 Providing and laying water proofing treatment on roofs of
slabs by applying cement slurry mixed with water
proofing cement compound consisting of applying:
a) after surface preparation, first layer of slurry of cement
@ 0.488 kg/sqm mixed with water proofing cement
compound @ 0.253 kg/sqm.
b) laying second layer of Fibre glass cloth when the first
layer is still green. Overlaps of joints of fibre cloth should
not be less than 10 cm.
c) third layer of 1.5 mm thickness consisting of slurry of
cement @ 1.289 kg/sqm mixed with water proofing
cement compound @ 0.670 kg/sqm and coarse sand @
1.289 kg/sqm. This will be allowed to air cure for 4 hours
followed by water curing for 48 hours. The entire
treatment will be taken upto 30 cm on parapet wall and
tucked into groove in parapet all around.
d) fourth and final layer of brick tiling with cement mortar
(which will be paid for separately.
(For the purpose of measurement the entire treated
surface will be measured)
BOQ_STP 24 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
12.19 3.A.9.2 Providing and laying brick tiles over mumty roofs,
grouted with cement mortar 1:3 (1 cement : 3 fine sand)
mixed with 2% of integral water proofing compound by
weight of cement, over 12 mm layer of cement mortar
1:3 (1 cement : 3 fine sand) and finished neat:
12.19.1 3.A.9.2.1 With common burnt clay F.P.S. (non modular) brick tiles
of class designation 10 sqm 46 607.40 27,940.40
22.14 3.A.9.3 Grading roof for water proofing treatment with
22.14.3 3.A.9.3.1 Cement mortar 1:4 (lcement: 4 coarse sand) cum 3 15,155.60 45,466.80
22.1 3.A.9.4 Providing and laying integral cement based treatment for
water proofing on horizontal surface at all depth below
ground level for under ground structures as directed by
Engineer-in-Charge and consisting of :
(i) Ist layer of 22 mm to 25 mm thick approved and
specified rough stone slab over a 25 mm thick base of
cement mortar 1:3 (1 cement : 3 coarse sand) mixed
with water proofing compound conforming to IS:2645 in
the recommended proportion over the leveling course
(leveling course to be paid separately). Joints sealed and
grouted with cement slurry mixed with water proofing
(ii) 2nd layer of 25 mm thick cement mortar 1:3 (1
cement: 3 coarse sand) mixed with water proofing
compound in recommended proportions.
(iii) Finishing top with stone aggregate of 10 mm to 12
mm nominal size spreading @ 8 cudm/sqm thoroughly
embedded in the 2nd layer.
22.1.1 3.A.9.4.1 Using rough kota stone.
BOQ_STP 25 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
22.2 Providing and laying integral cement based treatment for
water proofing on the vertical surface by fixing specified
stone slab 22 mm to 25 mm thick with cement slurry
mixed with water proofing compound conforming to
IS:2645 in recommended proportions with a gap of 20
mm (minimum) between stone slabs and the receiving
surfaces and filling the gaps with neat cement slurry
mixed with water proofing compound and finishing the
exterior of stone slab with cement mortar 1:3 (1 cement :
3 coarse sand) 20 mm thick with neat cement punning
mixed with water proofing compound in recommended
proportion complete at all levels and as directed by
Engineer-in-charge :
22.2.1 3.A.9.5 Using rough kota stone. sqm 295 2,024.70 5,97,286.50
TOTAL OF WATER PROOFING WORK CARRIED
OVER TO SUMMARY OF WORKS 8,76,677.10 -
3.A.10 FINISHING WORK
3.A.10.1 CEMENT PLASTER (IN FINE SAND)
13.1 3.A.10.1.1 12 mm cement plaster of mix :
13.3 3.A.10.1.2 20 mm cement plaster of mix :
13.16 3.A.10.1.3 6 mm cement plaster of mix :
13.21 3.A.10.2 Extra for providing and mixing water proofing material in per bag
cement plaster work in proportion recommended by the of
manufacturers. 50kg.
13.37 3.A.10.3 White washing with lime to give an even shade :
13.37.1 3.A.10.3.1 New work (three or more coats) sqm 150 39.05 5,857.50
BOQ_STP 26 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
13.47 3.A.10.4 Finishing walls with Premium Acrylic Smooth exterior
paint with Silicone additives of required shade
13.47.1 3.A.10.4.1 New work (Two or more coats applied @ 1.43 ltr/10
sqm. over and including priming coat of exterior primer
applied @ 2.20 kg/10 sqm).
13.62 3.A.10.5 Painting with synthetic enamel paint of approved brand
and manufacture of required colour to give an even
13.62.1 3.A.10.5.1 Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand and
manufacture. sqm 26 226.25 5,882.50
TOTAL OF FINISHING WORK CARRIED OVER TO 1,64,997.90 -
3.A.11 MISCELLANEOUS WORK
4.17 3.A.11.1 Making plinth protection 50mm thick of cement concrete
1:3:6 (1 cement : 3 coarse sand: 6 graded stone
aggregate 20mm nominal size) over 75mm bed by dry
brick ballast 40mm nominal size well rammed and
consolidated and grouted with fine sand including
finishing the top smooth.
6.44 3.A.11.2 Brick edging 7 cm wide 11.4 cm deep to plinth protection
with common burnt clay FPS (non modular) bricks of
class designation 7.5 including grouting with cement
mortar 1:4(1 cement: 4 fine sand).
19.19 3.A.11.3 Providing and fixing in position pre-cast R.C.C. manhole
cover and frame of required shape and approved quality
19.19.4.1 3.A.11.3.1.1Circular shape 560 mm internal dia
BOQ_STP 27 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
19.16 3.A.11.4 Providing orange colour safety foot rest of minimum 6
mm thick plastic encapsulated as per IS : 10910 on
12mm dia steel bar conforming to IS : 1786 having
minimum cross section as 23 mmx25mm and over all
minimum length 263 mm and width as 165mm with
minimum 112 mm space between protruded legs having
2 mm tread on top surface by ribbing or chequering
besides necessary and adequate anchoring projections
on tail length on 138 mm as per standard drawing and
suitable to with stand the bend test and chemical
resistance test as per specifications and having
manufacture's permanent identification mark to be
visible even after fixing, including fixing in manholes with
30x20x15 cm cement concrete block 1:3:6 (1 cement : 3
coarse sand : 6 graded stone aggregate 20 mm nominal
size) complete as per design.
TOTAL OF MISCELLANEOUS WORK CARRIED
OVER TO SUMMARY OF WORKS 1,04,320.75
3.A.12 PAVEMENT WORKS
2.8 3.A.12.1 Earth work in excavation by mechanical means
(hydraulic excavator)/ manual means in foundation
trenches or drains (not exceeding 1.5m in width or
10sqm on plan) including dressing of sides and
ramming of bottoms, lift upto 1.5m, including getting out
the excavated soil and diposal of surplus excavated soil
as directed, within a lead of 50 m:
BOQ_STP 28 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
16.42 3.A.12.2 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 40 mm nominal size) in
pavements, laid to required slope and camber in panels
as required including consolidation finishing and tamping
16.68 3.A.12.3 Providing and laying 60mm thick faciory made cement
concrete interlocking paver block of M -30 grade made
by block making machine with strong vibratory
compaction, of approved size, design & shape, laid in
required colour and pattern over and including 50mm
thick compacted bed of coarse sand, filling the joints with
line sand etc. all complete as per the direction of
Engineer-in-charge.
16.69 3.A.12.4 Providing and laying at or near ground level factory
made kerb stone of M-25 grade cement concrete in
position to the required line, level and curvature, jointed
with cement mortar 1:3 (1 cement: 3 coarse sand),
including making joints with or without grooves
(thickness of joints except at sharp curve shall not to
more than 5mm), including making drainage opening
wherever required complete etc. as per direction of
Engineer-in-charge (length of finished kerb edging shall
be measured for payment). (Precast C.C. kerb stone
shall be approved by Engineer-in-charge).
TOTAL OF PAVEMENT WORK CARRIED OVER TO
SUMMARY OF WORKS 78,581.50
3.A.13 FENCING
BOQ_STP 29 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
2.8 3.A.13.1 Earth work in excavation by mechanical means
(hydraulic excavator)/ manual means in foundation
trenches or drains (not exceeding 1.5m in width or
10sqm on plan) including dressing of sides and
ramming of bottoms, lift upto 1.5m, including getting out
the excavated soil and diposal of surplus excavated soil
as directed, within a lead of 50 m:
4.1 3.A.13.2 Providing and laying in position cement concrete of
specified grade excluding the cost of centering and
shuttering - All work upto plinth level.
4.1.6 3.A.13.2.1 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from
natural sources : 6 graded stone aggregate 40 mm
nominal size derived from natural sources)
13.62 3.A.13.3 Painting with synthetic enamel paint of approved brand
and manufacture of required colour to give an even
13.62.1 3.A.13.3.1 Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand and
16.70 3.A.13.4 Providing and fixing G.I. chain link fabric fencing of
required width in mesh size 50x50 mm including
strengthening with 2 mm dia wire or nuts, bolts and
washers as required complete as per the direction of
Engineer-in-charge.
16.70.2 3.A.13.4.1 Made of G.I. wire of dia. 4 mm, PVC coated to achieve
outer dia not less than 5 mm in required colour and
BOQ_STP 30 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
10.1 3.A.13.5 Structural steel work in single section, fixed with or
without connecting plate,including cutting, hoisting, fixing
in position and applying a priming coat of approved steel
primer all complete.
16.15 3.A.13.6 Supply at Site
16.15.2 3.A.13.6.1 Welded steel wire fabric of required width having
rectangular mesh painted with two or more coats of
enamel paint of approved shade over a coat of primer
(Priming & Painting to be paid for separately). kg 330 78.95 26,053.50
TOTAL OF FENCING WORK CARRIED OVER TO 1,54,055.55
SUMMARY OF WORKS
BOQ_STP 31 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
CHAPTER B - ELECTROMECHANICAL & ELECTRICAL WORKS
Design,Supplying, installing, testing & commissioning of
Sewage Treatment Plant of 100 m3/day based on SBR
technology (excluding excavation, back filling & disposal
of surplus earth MS / Civil construction work) for the
following duty:-
Nature of Sewage - Domestic Sewage from Office
Complex, design to take consideration of same.
The STP shall be designed based on the following
Daily average flow : 100 m3/day
S. Solids : 200 - 250 mg/l
Oil & Grease : 50 mg/L
Treated Sewage Water discharge standard after
BOD : less than 20
S. Solids : Less than 10
COD : Less than 80
Oil & Grease : Less than 1
Outlet effluent cherectristcis after UF:-
BOD : less than 6
BOQ_STP 32 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
S. Solids : Less than 1
COD : Less than 40
Oil & Grease : Below
detectable limit
Turbidity : Less then 1
Preliminary works shall include Preparation and
Submission of Shop Drawings which will include but
not restricted to Detailed GA drawing, Flow Diagram,
Equipment List, Data Sheets, Submission of detailed
'GOOD FOR CONSTRUCTION' stage architectural,
mechanical equipments, piping & electrical drawing for
BOQ_STP 33 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.A.1 Electro-Mechanical Works
NS 3.B.1.1 Bar Screen :
Supplying, installing, testing & commissioning Perfoated
manual screen including 2 nos course & fine screen of
particular size having provision for lifting arrangement Nos 2 33,459.00 66,918.00
etc. complete as required.
Size : 400 mm X 800mm
Purpose: For separation of large solids
NS 3.B.1.2 O&G Skimmer
Supply and fixing of meachenical belt type oil skimmer
basin Civil with suitable tank for flow rate capacity Set 1 78,072.00 78,072.00
complete in all respect.
Purpose:- for Removing O&G from Sewage
3.B.1.3 Submersible Pumps
Supply, installation, testing & commissioning of non
clogging type Submersible Pumps having CI casing & CI
impeller complete with bolt and all accessories, motor of
required capacity. pressure gauge on delivery line with
isolation cock, level controller to control the level for
provision to control the level of sump automatically.
Pumps shall have following duty:2No.(1W+1S)
3.B.1.3.1 Sewage Transfer Pump Set 1 1,11,606.00 1,11,606.00
Flow Rate : 6.7 M3/Hr
Head : 8- 10mtr
Solid handling : 18-20MM
Purpose: For sewage transfer from equalisation tank
BOQ_STP 34 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
BOQ_STP 35 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
Plant Room Sump Pump
Capacity : 5 M3/Hr
Purpose : For Transfer Drain Water to Equalization Tank
3.B.1.4 Supply, installation, testing & commissioning of non
clogging monoblock type Sludge Recirculation pump
having CI casing & CI impeller complete with and
foundation bolts all accessories, motor of required
capacity. pressure gauge on delivery line with isolation
cock, level controller to control the level of sump
automatically. Pumps shall have following duty:
Flow Rate : 3.0 M3/Hr
Head : 8- 10mtr
Solid handling : 7 MM
Purpose: For transfer sludge to Sludge holding tank
and recirculation to SBR Reacter
3.B.1.5 2 Nos. twin type rotary air blowers (1W + 1S) capable of
delivering 111 M3/hr of free air at 0.5 kg/cm2 driven
through “V” belt or directly coupled through flexible
coupling to a TEFC motor of suitable HP Suitable for 415
± 10% volts, 3 phase, 50 cycles A/C supply. Including
Purpose: For air supply to equalisation tank/sludge
holding tank/SBR reactor
BOQ_STP 36 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.B.1.6 Supplying, installing, testing & commissioning of
Horizontal centrifugal non clog water pumps with CI
casing and CI Impeller along with motor, pressure gauge
with isolation cock, Mechanical seal, suitable vibration
elimination pads of approved design, for the pump. The Set 1 1,10,414.00 1,10,414.00
pump shall be suitable for 415±10% volts 3 phase AC
supply. Including bolts(1 Working + 1 Standby)
Filter Feed Pump
Capacity : 5 M3/Hr
Purpose : For Feed Water into Filter MGF/ACF/ Softner
3.B.1.7 Supply, installation, testing and commissioning of
Sludge Feed Pumps Screw type Complete with all
fittings & accessories. Including bolts.( 2Nos.- 1W+1S) Set 1 1,63,482.00 1,63,482.00
Capacity : 1 M3/H
Purpose : For Feed Sludge to filter press
3.B.1.8 Providing, fixing, testing & commissioning of vertical filter
with adequate dirt holding capacity complete with intitial
charge filter media. The filter shall also be provided with
set of internals for raw water inlet and bottom collecting
Pressure Sand Filter
Type : Down Flow
Flow rate: 5 M3/hr
BOQ_STP 37 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
Filter Media: Sand & Gravel
Purpose: For removal of suspended solids
Activated Carbon Filter
Type : Down Flow
Flow rate: 5 M3/hr
Filter Media: Activated Carbon
Purpose: For removal of color & odor
3.B.1.9 Supply, installation, testing & commissioning of Poly
dosing system comprising of 200 ltrs HDPE tank with 0- Nos. 1 74,545.00 74,545.00
6 lph electronic metering type pump.
Purpose : For Thickening of Sludge
3.B.1.10 Supply, installation, testing & commissioning of Chlorine
dosing system comprising of 200 ltrs HDPE tank with 0-6 Nos. 1 25,558.00 25,558.00
Hypochlorite Dosing electronic metering type pump.
Purpose : For Disinfection of water
3.B.1.11 Supplying and fixing basket type centrifuge of suitable
size for dewatering of sludge generated per day with poly
dosing system. With SS basket and MS housing
Purpose : For Sludge Drying
BOQ_STP 38 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
BOQ_STP 39 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.B.1.12 Providing and fixing all piping (as described below) and
isolation control valves for making the system complete. Lot 1 3,59,775.00 3,59,775.00
uPVC : Submerged air piping
MS Epoxy : Air piping (non-submerged)
uPVC : Interconnecting pipe line after delivery header of
uPVC : Pumped effluent (submerged) & tank overflow
Purpose :- For Flow Control & Transfer path of Flow
3.B.1.13 Supply and fixing Disc type, EPDM Membrane based,
Coarse Bubble Diffuser capable of handling 2-3 cfm of
air Air dispersion grid shall be assembled on fixed upvc
grid for equalisation tank & sludge holding tank
Coarse Diffuser Lot 1 18,996.00 18,996.00
3.B.1.13. Supply and fixing Tube type, EPDM Membrane based,
1 non clog type air dispersion system capable of handling
3-5 cfm of air with oxygen transfer efficiency of 3-4%
per/meter water depth. Air dispersion grid shall be
assembled on fixed upvc grid from plat. (Imported fine
bubble membrane diffusers for Aeration tank)
Fine Diffuser Lot 1 52,239.00 52,239.00
Purpose :- For Providing the path of Air
BOQ_STP 40 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.B.1.14 Supply, installation, testing and commissioning fully
automatic SBR package, Automated system shall
include Floating Decanter with articulated arm, stainless
steel collector joint, knee joint. make a provision for auto
air scoring specially for decanting machenism for self
cleaning to avoid blocking in extraction nozzle , MOC
should be SS-304 for decanted water extraction from Lot 1 10,96,881.00 10,96,881.00
SBR tank. Inlet of sewage water decantation and
areation shall be automatic and PLC controlled with the
help of automatic valves. SBR cycle should be auto
control through PLC for Decanter, pressure gauge,
Human machin interface shall be provide with PLC to
make the system complete.
Decanter Diameter Size : 100 MM NB
Purpose: For Collection of Water from SBR Reactor
3.B.1.16 Supply Installation Testing & Commissioning of Agitator
of required capacity to be anoxic tank in all respect Set 1 95,844.00 95,844.00
Purpose : For completion of chemical reaction
Membrane Filteration
3.B.1.17 Ultrafiltration
Supply, installation testing and commissioning of
packaged type Ultra filteration unit with all components
and accessories complete to make the system functional
and shall be installed after water treatment system in
STP With UF Feed pump, backwashing arrangement
with all respect.
BOQ_STP 41 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
Capacity : 5 M3/HR
Purpose:- For Membrane Filteration
Flow Rate:- 40 Gm/ Hour
Purpose : For Disinfection of water
Supplying, installing, testing & commissioning of
centrifiugal non clog water pumps with CI casing and CI
Impeller along with motor, pressure gauge with Isolation
valve, NRV/valve on delivery line fitted with Mechanical
seal, suitable vibration elimination pads. The pump Set
shall be suitable for 415-10% volts 3 phasc AC supply.
Including foundation bolts(1W+1S) 1 working and 1
Pumps shall have following duty 2 nos (1W+1S)
Capacity : 5 M3/hour
BOQ_STP 42 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.B.2 ELECTRICAL AND INSTRUMENTATION FOR
INSTALLATION OF SEWAGE TREATMENT PLANT
3.B.2.1 This includes Design, supply, installation, testing and
commissioning of STP Main Electrical Panel (MCC)
housing with individual DOL starter of suitable capcity
upto 10 HP motor and Star delta starter above 10 HP
motor panels for various loads complete in all respects
with suitable switchgear. It shall be provided with
metering, MCCB Units, lamps, bus bars etc. The
accessories used shall conform to the latest IS codes.
MCC –1 (Sewage Treatment Plant) Set 1 5,32,466.00 5,32,466.00
3.B.2.2.1 Suppy, installation, testing & commissioning of
electromangnetic type flow meter at inlet of reactor No 1 61,766.00 61,766.00
3.B.2.2.2 Suppy, installation, testing & commissioning of
mechanical water meter at outlet of reactor tanks.
Purpose : For Measure flow quantity with time
3.B.2.3 Supply, Installation, Testing & Commissioning of Water
level controller for operation of the system connected to
control panel for automatic switching ON / OFF of each Lot 1 53,247.00 53,247.00
Purpose : For control Amount of Influent in tank
BOQ_STP 43 Digitally signed by ARTI
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
3.B.2.4 Supply, Installation, Testing & Commissioning of
pressure gauges with in all respect Lot 1 21,299.00 21,299.00
Purpose : For Measure & Indicate the pressure into
3.B.2.5 Supply, Installation, Testing & Commisioning of PH
Indicator with in all respect
Purpose : For measure acidic & alkaline nature of
TOTAL OF ELECTROMECHANICAL WORKS
CARRIED OVER TO SUMMARY OF WORKS 53,97,320.00
BOQ_STP 44 Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional floors of
ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
BOQ - 100 KLD STP
CHAPTER 3 - C- ELECTRICAL WORKS
RATE (Rs.) AMOUNT (Rs.)
2022/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR rate @ NS DSR ITEMS NS ITEMS
3.C.1 Electrical Works BASED ON DSR 2022
3.C.1.1 POINT WIRING
1.10 3.C.1.1.1 Wiring for light point/fan point/exhaust fan point/call bell point with
1.5 Sq.mm FRLS PVC insulated, copper conductor, single core
cable in surface/recessed medium class PVC conduit, with
modular switch, modular plate, suitable GI box and earthing the
point with 1.5 Sq.mm FRLS PVC insulated copper conductor
single core cable etc. as required.
1.12 3.C.1.1.2 Wiring for light/power plug with 2x4 sq.mm FRLS PVC insulated, Mtr 10 334.00 355.14 3,551.42
1.14 3.C.1.1.3 copper
Wiring conductor,
for circuit/ single corewiring
submain cable alongwith
in surface/recessed
earth wire medium
1.14.1 following
3.C.1.1.3.1 2 sizes+of1FRLS
x 1.5 Sqmm PVC insulated
x 1.5 Sq.mm copper
earth wire conductor,
(Circuit Wiring) single Mtr 60 233.00 247.75 14,864.93
1.14.4 3.C.1.1.3.2 2 x 6 Sqmm + 1 x 6 Sq.mm earth wire (Submain Wiring) Mtr 10 439.00 466.79 4,667.89
1.21 3.C.1.1.4 Supplying and fixing of following sizes of medium class PVC - -
1.21.2 3.C.1.1.4.1 conduit along
25mm (For with accessories
Circuit Wiring-Toiletin&surface/recess
Blower Room) including cutting
1.31 3.C.1.1.5 Supplying & fixing suitable size GI box with modular plate and
cover in front on surface or in recess, including providing & fixing
3 pin 5/6 Amps modular socket outlet and 5/6 Amp. modular
switch, connections etc. as required. Each 3 477.00 507.19 1,521.58
BOQ_STP- EL 45 Digitally signed by ARTI
RATE (Rs.) AMOUNT (Rs.)
2022/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR rate @ NS DSR ITEMS NS ITEMS
1.32 3.C.1.1.6 Supplying & fixing suitable size GI box of with modular plate and
cover in front on surface or in recess including providing & fixing 6
pin 5/6 & 15/16 Amp. modular socket outlet and 15/16 Amps
modular switch, connections etc. as required. Each 1 586.00 623.09 623.09
1.25 3.C.1.1.7 Supplying & fixing two module stepped type electronic fan
regulator on the existing modular plate switch box including
connections but excluding modular plate etc. as required.
3.C.1.2 MCB & DISTRIBUTION BOARD - -
2.10 3.C.1.2.1 Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, - -
Single"C" curve, miniature circuit breaker suitable for inductive
2.3 3.C.1.2.2 Supplying and fixing following way, single pole and neutral,sheet - -
3.C.1.2.2.1 6 way MCB distribution
, Double door board, 240V, on surface/ recess,complete Each 1 2,206.00 2,345.64 2,345.64
2.14 3.C.1.2.3 Supplying and fixing following rating, double pole, (single phase - -
2.14.1 3.C.1.2.3.1 and neutral), 240 V, residual current circuit breaker (RCCB),
BOQ_STP- EL 46 Digitally signed by ARTI
RATE (Rs.) AMOUNT (Rs.)
2022/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR rate @ NS DSR ITEMS NS ITEMS
3.C.1.3 CABLE & END TERMINATION - -
NS 3.C.1.3.1 Supplying of the following LT - XLPE 1100 Volts grade Al. - -
3.C.1.3.1.1 Conductor armoured
3.5Cx70 sq.mm cables.Panel)
(For Motor complete as required and as per Mtr 60 - 943.00 - 56,580.00
9.1 3.C.1.3.2 Supply and making end termination with brass compression - -
3.5Cx70and aluminium
sq.mm (38 mm) lugs for following sizes of PVC insulated & Each 2 468.00 497.62 995.25
14.16 3.C.1.3.3 Supplying and laying of following size DWC HDPE pipe ISI - -
14.16.1 marked
mm dia with all
(OD-63 mm accessories
& ID-51 mm like socket, bend, couplers etc. Metre
7.5 3.C.1.3.4 Laying of one number PVC insulated and PVC sheathed /XLPE
power cable of 1.1 KV grade of following size in the existing RCC/
HUME/ METAL pipe as required. - -
3.C.1.4 FITTINGS & FIXTURE - -
NS 3.C.1.4.1 Supplying of light fittings complete with all accessories with choke,
starter, capacitor, igniter etc. of the following type as required.(All
fixtures to be complete with lamps)
3.C.1.4.1.1 Supply of Ceiling Suspended light fixture suitable for 1 No 18/20
Watt LED Tube complete with suitable Electronic Ballast, Lamp
etc. as required.
1.41 3.C.1.4.2 Installation, testing and commissioning of pre-wired, fluorescent
fitting/compact fluorescent fitting of all types, complete with all
accessories and tube etc. directly on ceiling/wall including
connection with 1.5 Sqmm FRLS PVC insulated, copper
conductor, single core cable and earthing etc. as required.
BOQ_STP- EL 47 Digitally signed by ARTI
RATE (Rs.) AMOUNT (Rs.)
2022/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR rate @ NS DSR ITEMS NS ITEMS
19.1 3.C.1.4.3 Supply, Installation, Testing and Commissioning of 1200 mm
sweep, BEE 5 star rated, ceiling fan with Brush Less Direct
Current (BLDC) Motor, class of insulation: B, 3 nos. blades, 30 cm
long down rod, 2 nos. canopies, shackle kit, safety rope, copper
winding, Power Factor not less than 0.9, Service Value (CM/M/W)
minimum 6.00, Air delivery minimum 210 Cum/Min , 350 RPM
(tolerance as per IS : 374-2019), THD less than 10%, remote or
electronic regulator unit for speed control and all remaining
accessories including safety pin, nut bolts, washers, temperature
rise=75 degree C (max.), insulation resistance more than 2 mega
ohm, suitable for 230 V, 50 Hz, single phase AC Supply, earthing
etc. complete as required.
NS 3.C.1.4.4 Supplying of approved make 230V (nominal voltage) exhaust fan
with its all accessories complete as required of following size:
3.C.1.4.4.1 300mm sweep1400 RPM (Heavy duty)
1.50 3.C.1.4.5 Installation of exhaust fan in the existing opening, including - - -
3.C.1.4.5.1 Upto 450good
mmthe damage, connection, testing, commissioning etc.
1.44 3.C.1.4.6 Installation, testing and commissioning of ceiling fan, including Each 2 213.00 226.48 452.97
3.C.1.5 wiring the down rods of standard length (upto 30 cm) with 1.5
EARTHING - - -
5.4 3.C.1.5.1 Earthing wih GI earth plate 600mmx600mmx6mm thick including Each 2 7,472.00 7,944.98 15,889.96
5.11 3.C.1.5.2 accessories
Providing andand providinng
fixing 25mm xmasanory
5mm G.I.enclosure with cover
strip in 40mm plate
5.12 3.C.1.5.3 from earth electrode including connection with G.I.nut bolt
Providing and laying earth connection from earth electrode with 6 spring, Mtr 10 287.00 305.17 3,051.67
5.15 3.C.1.5.4 SWG dia G.I.
Providing andWire in 15
25mm G.I. pipe
x 5mm G.I.from
stripearth electrodeor in
5.16 3.C.1.5.5 recess for connections etc. as required.
Providing and fixing 6 SWG dia GI wire on surface or in recess for Mtr 10 70.00 74.43 744.31
loop earthing as required. -
TOTAL OF ELECTRICAL WORKS CARRIED OVER TO
SUMMARY OF WORKS 1,23,660.73 76,742.00
BOQ_STP- EL 48 Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional
floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
GRAND SUMMARY OF WASTE MANAGEMENT WORKS (figures in Rs.)
Sl. No. Chapter Description/ Head of work
Scheduled Items Non Scheduled items
1 BUILDING WORKS
A CIVIL WORKS 13,15,755.45 -
B PLUMBING WORKS 9,337.25
2 ELECTRICAL WORKS 42,460.76 30,774.00
3 WASTE MANAGEMENT WORKS 13,86,856.00
TOTAL OF WASTE MANAGEMENT WORKS
Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at
additional floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
WASTE MANGEMENT - SUMMARY OF CIVIL WORKS(figures in Rs.)
Sl. No. Chapter Description/ Head of work
Scheduled Items Non Scheduled items
1 BUILDING WORKS
A.1 EARTH WORK 24,591.43
A.2 CONCRETE WORK 48,050.75
A.3 R.C.C WORKS 7,31,758.25
A.4 BRICK WORK 1,47,602.90
A.5 STEEL WORK 12,367.20
A.6 FLOORING WORK 87,636.30
A.7 ROOFING WORK 10,850.27
A.8 WATER PROOFING WORK 84,355.80
A.9 FINISHING WORK 1,56,268.85
A.10 MISCELLANEOUS WORK 12,273.70
TOTAL OF CIVIL WORKS CARRIED OVER TO GRAND
SUMMARY OF COSTS -
Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at
additional floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
CHAPTER 4 -WASTE MANAGEMENT
DSR - RATE (Rs.) AMOUNT (Rs.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NS DSR NS DSR ITEMS NS ITEMS
4.A.1 EARTH WORK
Earthwork in excavation by mechanical means (hydraulic
excavator)/manual means over areas (exceeding 30cm in
depth, 1.5m in width as well as 10sqm on plan) including
disposal of excavated earth lead upto 50m and lift upto
1.5m, disposed earth to be levelled and neatly dressed :
2.8 4.A.1.2 Earth work in excavation by mechanical means (hydraulic
excavator)/ manual means in foundation trenches or drains
(not exceeding 1.5m in width or 10sqm on plan) including
dressing of sides and ramming of bottoms, lift upto 1.5m,
including getting out the excavated soil and diposal of
surplus excavated soil as directed, within a lead of 50 m:
2.25 4.A.1.3 Filling available excavated earth (excluding rock) in
trenches, plinth, sides of foundations etc. in layers not
exceeding 20 cm in depth: consolidating each deposited
layer by ramming and watering, lead up to 50 m and lift upto
2.27 4.A.1.4 Supplying and filling in plinth with sand under floors,
including watering, ramming, consolidating and dressing
Digitally signed by ARTI
CARRIAGE OF MATERIALS
1.1 4.A.1.5 By Mechanical Transport including loading,unloading and
TOTAL OF EARTH WORK CARRIED OVER TO
SUMMARY OF WORKS 24,591.43 -
4.A.2 CONCRETE WORK
4.1 4.A.2.1 Providing and laying in position cement concrete of specified
grade excluding the cost of centering and shuttering - All
work upto plinth level.
4.1.6 4.A.2.1.2 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from
natural sources : 6 graded stone aggregate 40 mm nominal
size derived from natural sources) cum 1 7,178.75 7,178.75
4.1.8 4.A.2.1.3 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from
natural sources : 8 graded stone aggregate 40 mm nominal
size derived from natural sources) cum 6 6,812.00 40,872.00
TOTAL OF CONCRETE WORK CARRIED OVER TO
SUMMARY OF WORKS 48,050.75 -
4.A.3 R.C.C WORKS
5.9 4.A.3.1 Centring and shuttering including strutting, propping etc. and
removal of form for:
5.9.1 4.A.3.1.1 Foundations, footings, bases of columns etc. for mass
concrete. sqm 25 392.15 9,803.75
5.9.3 4.A.3.1.2 Suspended floors, roofs,landings, balconies and access
5.9.5 4.A.3.1.3 Lintels, beams, plinth beams, girders, bressumers and
5.9.6 4.A.3.1.4 Columns, Pillars, Piers, Abutments, Posts and Struts sqm 45 961.30 43,258.50
5.9.15 4.A.3.1.5 Small lintels not exceeding 1.5 m clear span, moulding as in
cornices, window sills, string courses, bands, copings, bed
plates, anchor blocks and the like sqm 2 392.15 784.30
5.9.16 4.A.3.1.6 Edges of slabs and breaks in floors and walls -
Digitally signed by ARTI
5.11 4.A.3.2 Extra for additional height in centering, shuttering where
ever required with adequate bracing, propping etc., including
cost of de-shuttering and decentering at all levels, over a
height of 3.5 m, for every additional height of 1 metre or part
thereof (Plan area to be measured).
5.11.1 4.A.3.2.1 Suspended floors, roofs, landing, beams and balconies
(Plan area to be measured) sqm 27 384.30 10,376.10
5.22 4.A.3.3 Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
upto plinth level.
5.22.6 4.A.3.3.1 Thermo-Mechanically Treated bars of grade Fe-500 D or
5.22A 4.A.3.4 Steel reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all complete
above plinth level.
5.22A.6 4.A.3.4.1 Thermo-Mechanically Treated bars of grade Fe-500 D or
5.30 4.A.3.5 Add for plaster drip course/ groove in plastered surface or
moulding to R.C.C. projections. metre 26 78.40 2,038.40
5.33 4.A.3.6 Providing and laying in position ready mixed or site batched
design mix cement concrete for reinforced cement concrete
work; using coarse aggregate and fine aggregate derived
from natural sources, Portland Pozzolana / Ordinary
Portland /Portland Slag cement, admixtures in
recommended proportions as per IS: 9103 to accelerate /
retard setting of concrete, to improve durability and
workability without impairing strength; including pumping of
concrete to site of laying, curing, carriage for all leads; but
excluding the cost of centering, shuttering, finishing and
reinforcement as per direction of the engineer-in-charge; for
the following grades of concrete.
Digitally signed by ARTI
Note: Extra cement up to 10% of the minimum specified
cement content in design mix shall be payable separately. In
case the cement content in design mix is more than 1.10
times of the specified minimum cement content, the
contractor shall have discretion to either re-design the mix
or bear the cost of extra cement.
5.33.1 4.A.3.6.1 All works up to Plinth level.
5.33.1.1 Concrete of M25 grade with minimum cement content of
5.33.2 4.A.3.6.7 All works above plinth & up to floor V level.
5.33.2.1 4.A.3.7.1 Concrete of M25 grade with minimum cement content of
5.35 4.A.3.8 Add for using extra cement in the items of design mix over
and above the specified cement content therein quintal 18 733.50 13,203.00
5.1 4.A.3.9 Providing and laying in position specified grade of reinforced
cement concrete excluding the cost of centering, shuttering,
finishing and reinforcement - All work upto plinth level.
5.1.3 4.A.3.9.1 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from
natural sources : 4 graded stone aggregate 20 mm nominal
size derived from natural sources) cum 4 8,583.40 34,333.60
5.41 4.A.3.10 Supplying and applying pre tested and approved water
based concrete curing compound to concrete/ masonry
surface, all as per manufacturer’s specification and direction
of Engineer-in-charge.
5.41.1 4.A.3.10.1 Non pigmented wet curing compound sqm 172 69.05 11,876.60
TOTAL OR R.C.C WORKS CARRIED OVER TO
SUMMARY OF WORKS 7,31,758.25 -
4.A.4 BRICK WORK
6.1 4.A.4.1 Brick work withcommon burnt clay F.P.S.(non moduler)
bricks of class designation 7.5 in foundation and plinth in :
6.1.2 4.A.4.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand) cum 2 7,132.25 14,264.50
Digitally signed by ARTI
6.47 A 4.2 Providing and laying autoclaved aerated cement blocks
masonry with 150mm/230mm/300 mm thick AAC blocks in
super structure above plinth level up to floor V level with
RCC band at sill level and lintel level with approved block
laying polymer modified adhesive mortar all complete as per
direction of Engineer-in-Charge. (The payment of RCC band
and reinforcement shall be made for seperately).
TOTAL OF BRICK WORK CARRIED OVER TO
SUMMARY OF WORKS 1,47,602.90 -
4.A.5 STEEL WORK
10.26 4.A.5.1 Providing and fixing hand rail of approved size by welding
etc. to steel ladder railing, balcony railing and staircase
railing including applying a priming coat of approved steel
10.16 4.A.5.4 Steel work in built up tubular (round, square or rectangular
hollow tubes etc.) trusses etc., including cutting, hoisting,
fixing in position and applying a priming coat of approved
steel primer, including welding and bolted with special
shaped washers etc. complete.
10.16.1 4.A.5.4.1 Hot finished welded type tubes kg 13 194.40 2,527.20
TOTAL OF STEEL WORK CARRIED OVER TO
SUMMARY OF WORKS 12,367.20 -
4.A.6 FLOORING WORK
11.26 4.A.6.1 Kota stone slab flooring over 20 mm (average) thick base
laid over and jointed with grey cement slurry mixed with
pigment to match the shade of the slab including rubbing
and polishing complete with base of cement mortar 1:4 (1
cement : 4 coarse sand):
11.27 4.A.6.2 Kota stone slabs 20 mm thick in risers of steps, skirting,
dado and pillars laid on 12 mm (average) thick cement
mortar 1:3 (1 cement: 3 coarse sand) and jointed with grey
cement slurry mixed with pigment to match the shade of the
slabs, including rubbing and polishing complete.
Digitally signed by ARTI
11.37A 4.A.6.3 Providing and fixing Ist quality ceramic glazed wall tiles
conforming to IS: 15622 (thickness to be specified by the
manufacturer), of approved make, in all colours, shades
except burgundy, bottle green, black of any size as
approved by Engineer-in-Charge, in skirting, risers of steps
and dados, over 12 mm thick bed of cement mortar 1:3 (1
cement : 3 coarse sand) and jointing with grey cement slurry
@ 3.3kg per sqm, including pointing in white cement mixed
with pigment of matching shade complete
TOTAL OF FLOORING WORK CARRIED OVER TO
SUMMARY OF WORKS 87,636.30 -
4.A.7 ROOFING WORK
12.21 4.A.7.1 Providing Gola 75 x 75 mm in cement concrete 1:2:4(1
cemment : 2 course sand : 4 stone aggregate 10mm &
down gauge) including finishing with cement mortar 1:3 (1
cement : 3 fine sand) as per standard design
12.22 4.A.7.2 Making khurras 45x45cm with average minimum thickness
of 5 cm cement concrete 1:2:4 (1 cement :2 coarse sand : 4
graded stone aggregate of 20mm nominal size) over P.V.C.
sheet 1m x 1m x 400 micron, finished with 12mm cement
plaster 1:3 (1 cement :3 coarse sand) and a coat of neat
cement rounding the edges and making and finishing the
outlet complete
12.41 4.A.7.3 Providing and fixing on wall face unplasticised Rigid PVC
rain water pipes conforming to IS:13592 Type A including
jointing with seal ring conforming to IS:5382 leaving 10mm
gap for thermal expansion.
(i) Single socketed pipes
12.42 4.A.7.4 Providing and fixing on wall face unplasticised - PVC
moulded fittings/accessories for unplasticised Rigid PVC
rain water pipes conforming to IS:13592 Type A including
jointing with seal ring conforming to IS: 5382 leaving 10mm
gap for thermal expansion.
Digitally signed by ARTI
12.42.6 4.A.7.4.1 (ii) Shoe (Plain)
12.43 4.A.7.5 Providing and fixing unplasticised - PVC pipe clips of
approved design to unplasticised - PVC rain water pipes by
means of 50 x 50 x 50mm hard wood plugs, screwed with
M.S. screws of required length including cutting brick work
and fixing in cement mortar 1:4 (1 cement : 4 coarse sand)
and making good the wall etc. complete.
12.44 4.A.7.6 Providing and fixing to the inlet mouth of rain water pipe cast
iron grating 15 cm diameter and weighing not less than 440
grams. each 1 54.70 54.70
TOTAL OF ROOFING WORK CARRIED OVER TO
SUMMARY OF WORKS 10,850.27 -
4.A.8 WATER PROOFING WORK
22.6 4.A.8.1 Providing and laying water proofing treatment on roofs of
slabs by applying cement slurry mixed with water proofing
cement compound consisting of applying:
a) after surface preparation, first layer of slurry of cement @
0.488 kg/sqm mixed with water proofing cement compound
@ 0.253 kg/sqm.
b) laying second layer of Fibre glass cloth when the first
layer is still green. Overlaps of joints of fibre cloth should not
be less than 10 cm.
c) third layer of 1.5 mm thickness consisting of slurry of
cement @ 1.289 kg/sqm mixed with water proofing cement
compound @ 0.670 kg/sqm and coarse sand @ 1.289
kg/sqm. This will be allowed to air cure for 4 hours followed
by water curing for 48 hours. The entire treatment will be
taken upto 30 cm on parapet wall and tucked into groove in
parapet all around.
d) fourth and final layer of brick tiling with cement mortar
(which will be paid for separately.
(For the purpose of measurement the entire treated surface
will be measured) sqm 30 688.90 20,667.00
Digitally signed by ARTI
12.19 4.A.8.2 Providing and laying brick tiles over mumty roofs, grouted
with cement mortar 1:3 (1 cement : 3 fine sand) mixed with
2% of integral water proofing compound by weight of
cement, over 12 mm layer of cement mortar 1:3 (1 cement :
3 fine sand) and finished neat:
12.19.1 4.A.8.2.1 With common burnt clay F.P.S. (non modular) brick tiles of
class designation 10 sqm 30 607.40 18,222.00
22.14 4.A.8.3 Grading roof for water proofing treatment with
22.14.3 4.A.8.3.1 Cement mortar 1:4 (lcement: 4 coarse sand) cum 3 15,155.60 45,466.80
TOTAL OF WATER PROOFING WORK CARRIED OVER
TO SUMMARY OF WORKS 84,355.80 -
4.A.9 FINISHING WORK
13.78 4.A.9.1 Providing and applying 12 mm thick (average) premixed
formulated one coat gypsum lightweight plaster having
additives and light weight aggregates as vermiculite/ perlite
respectively conforming to IS: 2547 (Part - 1 & II) 1976,
applied on hacked / uneven background such as bare brick/
block/ RCC work on walls & ceiling at all floors and
locations, finished in smooth line and level etc. complete.
13.3 4.A.9.1.2 20 mm cement plaster of mix :
13.16 4.A.9.1.3 6 mm cement plaster of mix :
13.21 4.A.9.2 Extra for providing and mixing water proofing material in per bag
cement plaster work in proportion recommended by the of 50kg.
manufacturers. cement
13.82 4.A.9.3 Wall painting with acrylic emulsion paint, having VOC
(Volatile Organic Compound ) content less than 50 grams/
litre, of approved brand and manufacture, including applying
additional coats wherever required, to achieve even shade
13.47 4.A.9.4 Finishing walls with Premium Acrylic Smooth exterior paint
with Silicone additives of required shade
Digitally signed by ARTI
13.47.1 4.A.9.4.1 New work (Two or more coats applied @ 1.43 ltr/10 sqm.
over and including priming coat of exterior primer applied @
13.62 4.A.9.5 Painting with synthetic enamel paint of approved brand and
manufacture of required colour to give an even shade:
13.62.1 4.A.9.5.1 Two or more coats on new work over an under coat of
suitable shade with ordinary paint of approved brand and
manufacture. sqm 25 226.25 5,656.25
TOTAL OF FINISHING WORK CARRIED OVER TO
SUMMARY OF WORKS 1,56,268.85 -
4.A.10 MISCELLANEOUS WORK
4.17 4.A.10.1 Making plinth protection 50mm thick of cement concrete
1:3:6 (1 cement : 3 coarse sand: 6 graded stone aggregate
20mm nominal size) over 75mm bed by dry brick ballast
40mm nominal size well rammed and consolidated and
grouted with fine sand including finishing the top smooth.
6.44 4.A.10.2 Brick edging 7 cm wide 11.4 cm deep to plinth protection
with common burnt clay FPS (non modular) bricks of class
designation 7.5 including grouting with cement mortar 1:4(1
cement: 4 fine sand). metre 30 59.45 1,783.50
TOTAL OF MISCELLANEOUS WORK CARRIED OVER
TO SUMMARY OF WORKS 12,273.70
TOATL OF CIVIL WORKS 13,15,755.45
B PLUMBING WORKS
18.9 B.1 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC)
pipes, having thermal stability for hot & cold water supply
including all CPVC plain & brass threaded fittings This
includes jointing of pipes & fittings with one step CPVC
solvent cement ,trenching ,refilling & testing of joints
complete as per direction of Engineer in Charge.
18.9.1 a) 15 mm nominal dia Pipes Metre 5 244.70 1,223.50
18.9.2 a) 20 mm nominal dia Pipes Metre 7 274.30 1,920.10
Digitally signed by ARTI
INTERNAL WATER SUPPLY
18.7 B.2.1 Providing and fixing Chlorinated Polyvinyl Chloride (CPVC)
pipes, having thermal stability for hot & cold water supply,
including all CPVC plain & brass threaded fittings, including
fixing the pipe with clamps at 1.00 m spacing. This includes
jointing of pipes & fittings with one step CPVC solvent
cement and testing of joints complete as per direction of
Engineer in Charge.
Internal work - Exposed on Wall
18.7.1 15 mm nominal dia Pipes Metre 1 286.80 286.80
18.18 B.2.3 Providing and fixing ball (brass) valve of approved quality.
High or low pressure, with plastic floats complete:
18.18.1 (a) 15 mm nominal bore Each 1 406.85 406.85
18.48 B.2.4 Providing and placing on terrace (at all floor levels)
polyethylene water storage tank, ISI : 12701 marked, with
cover and suitable locking arrangement and making
necessary holes for inlet, outlet and overflow pipes but
without fittings and the base support for tank. per litre 500 11.00 5,500.00
TOATL OF PLUMBING WORKS CARRIED OVER TO
SUMMARY OF COSTS
Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional floors of
ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
CHAPTER 4A - BUILDING WORKS - ELECTRICAL
RATE (RS.) AMOUNT(RS.)
2022/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR rate @ NS DSR ITEMS NS ITEMS
1.10 4A.1 Wiring for light point/fan point/exhaust fan point/call bell
point with 1.5 Sq.mm FRLS PVC insulated, copper
conductor, single core cable in surface/recessed medium
class PVC conduit, with modular switch, modular plate,
suitable GI box and earthing the point with 1.5 Sq.mm
FRLS PVC insulated copper conductor single core cable
etc. as required.
1.14 4A.2 Wiring for circuit/ submain wiring alongwith earth wire with
the following sizes of FRLS PVC insulated copper
conductor, single core cable in surface/ recessed medium
class PVC conduit as required - -
1.14.1 4A.4A.1 2 x 1.5 Sqmm + 1 x 1.5 Sq.mm earth wire (Circuit Wiring)
1.31 4A.3 Supplying & fixing suitable size GI box with modular plate
and cover in front on surface or in recess, including
providing & fixing 3 pin 5/6 Amps modular socket outlet
and 5/6 Amp. modular switch, connections etc. as
NS 4A.4 Supplying & laying of the following LT - XLPE 1100 Volts
grade Al. Conductor armoured cables. complete as
required and as per tender specifications.
4A.4.1 4Cx16 sq.mm (For Machine) Mtr 60 - 417.00 - 25,020.00
9.1 4A.5 Supply and making end termination with brass
compression glands and aluminium lugs for following
sizes of PVC insulated & PVC sheathed / XLPE
aluminium conductor cable of 1.1 KV grade as required.
Digitally signed by ARTI
14.16 4A.6 Supplying and laying of following size DWC HDPE pipe
ISI marked along with all accessories like socket, bend,
couplers etc. conforming to IS 14930, Part II complete
with fitting and cutting, jointing etc..direct in ground (75 cm
below ground level) including excavation and refilling the
trench but excluding sand cushioning and protective
covering etc., complete as required.(For Cable Entry)
Supplying of light fittings complete with all accessories
with choke, starter, capacitor, igniter etc. of the following
type as required.(All fixtures to be complete with lamps) - -
a) Supply of Ceiling Suspended light fixture suitable for 1 No
18/20 Watt LED Tube complete with suitable Electronic
Ballast, Lamp etc. as required. Each 6 - 959.00 - 5,754.00
1.41 4A.8 Installation, testing and commissioning of pre-wired,
fluorescent fitting/compact fluorescent fitting of all types,
complete with all accessories and tube etc. directly on
ceiling/wall including connection with 1.5 Sqmm FRLS
PVC insulated, copper conductor, single core cable and
earthing etc. as required. Each 6 206.00 219.04 1,314.24
TOTAL OF ELECTRICAL WORKS CARRIED OVER TO
GRAND SUMMARY OF COSTS 42,460.76 30,774.00
Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional
floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
BILL OF QUANTITY - WASTE MANAGEMENT WORKS
CHAPTER - 4B : WASTE MANAGEMENT WORKS
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY Image
NO. DSR NS DSR ITEMS NS ITEMS
NS 4B.1 Supplying, installing & commissioning "Automatic
Organic Waste Composting Reactor 200KG shall
process 200kg waste capacity / day in Batches.
Processes all kind of Organic Waste into
Compost with a Volume reduction upto 85-90%
within 24 - 36 Hours , complete the process as
per attached methodology.
a. Technical speficification
Digitally signed by ARTI
Machine Size (L x W x H) in mm : 2575 X 980 X
Waste Treatment Capacity : 200 kg/day
All Wetted Parts : Stainless Steel SS 304
Operation : Fully Automatic.
Volume Reduction : Up to 85-90%
Weight : 1200 Kg
Shredder ; Ergonomically placed inside the
machine and is capable of shredding tender
coconuts, non-veg bones, etc.
Shredder Blades: Forged Alloy Steel
Internal Processing Chamber : SS 304 with
Mixing arms and Shaft : SS 304 and SS 316
Inlet Hopper and Outlet: SS 304 with Thickness
External Body : MS Powder coated.
Blower : For aeration inside the system and to
remove the water vapour, odour generated during
Heating System : Band heaters (3 X 1.5 kW) to
maintain the temperature of processing chamber
and preheating of process air.
Motor Gearbox Integrated Motor gearbox:
Total Connected Load (kw): 10
Digitally signed by ARTI
b. VFD For motor speed control, Smooth and
efficient operation of motor gearbox
Control System - PLC Based control System
Unloading- Automatic with unload function/mode
Electrical Components - Siemens or equivalent
Safety Features - Emergency switch to stop the
machine, Motor overload
protection feature, temperature control etc.
NS 4B.2 Providing and placing HDPE Waste bins of blue &
green colour on. MS stand as indicated in the
image capacity 100 litres each as per
drawing/direction of Engineer-in-charge.
NS 4B.3 Providing and placing HDPE Waste bins of blue &
green colour as indicated in the image capacity
500 litres each as per drawing/direction of
Engineer-in-charge.
NS 4B.4 Providing and placing HDPE Waste Carrier
Wheel Barrow Trolley as indicated in the image
capacity 160 kg as per drawing/direction of
Engineer-in-charge.
TOTAL OF WASTE MANAGEMENT WORK
CARRIED OVER TO SUMMARY OF WASTE
MANAGEMENT WORKS - 13,86,856.00
Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional
floors of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
GRAND SUMMARY OF DG STACK WORKS (figures in Rs.)
Sl. No. Chapter Description/ Head of work
Scheduled Items Non Scheduled items
TOTAL OF DG STACK WORKS
Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional floors of
ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
CHAPTER - 5 : DG STACK (New DG stes two Nos.)
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.1 EARTH WORK
2.6 5.5.1 Earth work in excavation by mechanical means (Hydraulic excavator)
/ manual means over areas (exceeding 30cm in depth, 1.5m in width
as well as 10 sq.m on plan) including disposal of excavated earth,
lead upto 50m and lift up to 1.5m, disposed earth to be levelled and
neatly dressed.
2.25 5.5.2 Filling available excavated earth (excluding rock) in trenches, plinth,
sides of foundations etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up
to 50 m and lift upto 1.5 m.
2.26 5.5.3 Extra for every additional lift of 1.5 m or part thereof in excavation /
banking excavated or stacked materials.
CARRIAGE OF MATERIALS
1.1 5.4.1 By Mechanical Transport including loading,unloading and stacking
5.2 CONCRETE & RCC WORK
4.1 5.2.1 Providing & laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
4.1.8 5.2.1.1 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural
sources : 8 graded stone aggregate 40 mm nominal size derived from
natural sources) Cum 3.00 6,812.00 20,436.00
BOQ_DG STACK 67 Digitally signed by ARTI
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.9 5.2.2 Centring and shuttering including strutting, propping etc. and removal
5.9.1 5.2.2.1 Foundations, footings, bases of columns etc. for mass concrete.
5.9.5 5.2.2.2 Lintels, beams, plinth beams, girders, bressumers and cantilevers. Sqm 7 736.40 5,154.80
5.9.6 5.2.2.3 Columns, Pillars, Piers, Abutments, Posts and Struts Sqm 35 961.30 33,645.50
5.22 5.2.4 Steel reinforcement for RCC work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.
5.22.6 5.2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more. kg 3900 107.85 4,20,615.00
5.33 5.2.5 Providing and laying in position ready mixed or site batched design
mix cement concrete for reinforced cement concrete work; using
coarse aggregate and fine aggregate derived from natural sources,
Portland Pozzolana / Ordinary Portland /Portland Slag cement,
admixtures in recommended proportions as per IS: 9103 to accelerate
/ retard setting of concrete, to improve durability and workability
without impairing strength; including pumping of concrete to site of
laying, curing, carriage for all leads; but excluding the cost of
centering, shuttering, finishing and reinforcement as per direction of
the engineer-in-charge; for the following grades of concrete
Note: Extra cement up to 10% of the minimum specified cement
content in design mix shall be payable separately. In case the cement
content in design mix is more than 110% of the specified minimum
cement content, the contractor shall have discretion to either re-
design the mix or bear the cost of extra cement.
5.33.1 5.2.5.1 All works up to Plinth level.
5.33.1.1 (a) Concrete of M25 grade with minimum cement content of 330 kg /cum
5.35 5.2.6 Add for using extra cement in the items of design mix over and above
the specified cement content therein. quintal 15 733.50 11,002.50
BOQ_DG STACK 68 Digitally signed by ARTI
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.3 STEEL WORK
10.2 5.3.1 Structural steel work riveted, bolted or welded in built up sections,
trusses and framed work, including cutting, hoisting, fixing in position
and applying a priming coat of approved steel primer all complete.
10.19 5.3.2 Providing and fixing M.S. round holding down bolts with nuts and
washer plates complete kg 340 97.20 33,048.00
10.22 5.3.3 Welding by gas or electric plant including transportation of plant at
10.25 5.3.4 etc. complete.
Steel work welded in builtup sections/ framed work including cutting,
hoisting, fixing in position and applying a priming coat of approved
steel primer using structural steel etc.as requiredIn stringers, treads,
landing etc. of stair cses including use of chequered plate wherever
required, all complete.
10.25.1 5.3.4.1 In stringers, treads, landings etc. of stair cases, including use of
chequered plate wherever required, all complete
13.62 5.4.1 Painting with synthetic enamel paint of approved brand and
manufacture of required colour to give an even shade:
13.62.1 5.4.1.1 Two or more coats on new work over an under coat of suitable shade
with ordinary paint of approved brand and manufacture. sqm 300 226.25 67,875.00
6.0 DG EXHAUST PIPING WORK
NS 6.1 Providing and fixing exhaust piping with bends flages packing and
hardwares from flexible pipe outlet to out side cannopy at each outlet
duly insulated with 80 kg/ cum density resin bonded fiber glass or
144 Kg / cum density mineral wool insulation (non combustible) pipe
section insulation covered with a layer of 120 gm/sqm polythene
sheet (vapour barrier) and finally applying 0.63mm aluminium sheet
cladding complete with type3 , grade 1 roofing feltstrip(as per IS:1322
as amended up to date ) at joints and repairing of damage to building
etc. as per specifications and as required of 400 mm size. For 2 DG
TOTAL OF DG STACK WORKS GRAND SUMMARY OF COSTS
BOQ_DG STACK 69 Digitally signed by ARTI
“Construction of 100 KLD STP, Waste Management, Rain Water Harvesting, Basement Ventilation at additional floors
of ISA/IPEA complex of IPO Building, at Dwarka, New Delhi.”
CHAPTER - 5 : DG STACK (Old DG stes)
DSR - RATE (RS.) AMOUNT(RS.)
2023/ DESCRIPTION OF ITEM UNIT QTY
NO. DSR NS DSR ITEMS NS ITEMS
5.1 EARTH WORK
2.6 5.5.1 Earth work in excavation by mechanical means (Hydraulic excavator)
/ manual means over areas (exceeding 30cm in depth, 1.5m in width
as well as 10 sq.m on plan) including disposal of excavated earth,
lead upto 50m and lift up to 1.5m, disposed earth to be levelled and
neatly dressed.
2.25 5.5.2 Filling available excavated earth (excluding rock) in trenches, plinth,
sides of foundations etc. in layers not exceeding 20cm in depth,
consolidating each deposited layer by ramming and watering, lead up
to 50 m and lift upto 1.5 m.
2.26 5.5.3 Extra for every additional lift of 1.5 m or part thereof in excavation /
banking excavated or stacked materials.
CARRIAGE OF MATERIALS
1.1 5.4.1 By Mechanical Transport including loading,unloading and stacking
5.2 CONCRETE & RCC WORK
4.1 5.2.1 Providing & laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
4.1.8 5.2.1.1 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural
sources : 8 graded stone aggregate 40 mm nominal size derived from
natural sources) Cum 3.00 6,812.00 20,436.00
Digitally signed by ARTI
5.9 5.2.2 Centring and shuttering including strutting, propping etc. and removal
5.9.1 5.2.2.1 Foundations, footings, bases of columns etc. for mass concrete.
5.9.5 5.2.2.2 Lintels, beams, plinth beams, girders, bressumers and cantilevers.
5.9.6 5.2.2.3 Columns, Pillars, Piers, Abutments, Posts and Struts Sqm 35 961.30 33,645.50
5.22 5.2.4 Steel reinforcement for RCC work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.
5.22.6 5.2.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more. kg 3900 107.85 4,20,615.00
5.33 5.2.5 Providing and laying in position ready mixed or site batched design
mix cement concrete for reinforced cement concrete work; using
coarse aggregate and fine aggregate derived from natural sources,
Portland Pozzolana / Ordinary Portland /Portland Slag cement,
admixtures in recommended proportions as per IS: 9103 to
accelerate / retard setting of concrete, to improve durability and
workability without impairing strength; including pumping of concrete
to site of laying, curing, carriage for all leads; but excluding the cost of
centering, shuttering, finishing and reinforcement as per direction of
the engineer-in-charge; for the following grades of concrete
Note: Extra cement up to 10% of the minimum specified cement
content in design mix shall be payable separately. In case the cement
content in design mix is more than 110% of the specified minimum
cement content, the contractor shall have discretion to either re-
design the mix or bear the cost of extra cement.
5.33.1 5.2.5.1 All works up to Plinth level.
5.33.1.1 (a) Concrete of M25 grade with minimum cement content of 330 kg /cum
5.35 5.2.6 Add for using extra cement in the items of design mix over and above
the specified cement content therein. quintal 15 733.50 11,002.50
5.3 STEEL WORK
10.2 5.3.1 Structural steel work riveted, bolted or welded in built up sections,
trusses and framed work, including cutting, hoisting, fixing in position
and applying a priming coat of approved steel primer all complete.
Digitally signed by ARTI
10.19 5.3.2 Providing and fixing M.S. round holding down bolts with nuts and
washer plates complete kg 340 97.20 33,048.00
10.22 5.3.3 Welding by gas or electric plant including transportation of plant at
10.25 etc. complete.
5.3.4 Steel work welded in builtup sections/ framed work including cutting,
hoisting, fixing in position and applying a priming coat of approved
steel primer using structural steel etc.as requiredIn stringers, treads,
landing etc. of stair cses including use of chequered plate wherever
required, all complete.
10.25.1 5.3.4.1 In stringers, treads, landings etc. of stair cases, including use of
chequered plate wherever required, all complete
13.62 5.4.1 Painting with synthetic enamel paint of approved brand and
manufacture of required colour to give an even shade:
13.62.1 5.4.1.1 Two or more coats on new work over an under coat of suitable shade
with ordinary paint of approved brand and manufacture. sqm 300 226.25 67,875.00
6.0 DG EXHAUST PIPING WORK
NS 6.1 Providing and fixing exhaust piping with bends flages packing and
hardwares from flexible pipe outlet to out side cannopy at each outlet
duly insulated with 80 kg/ cum density resin bonded fiber glass or
144 Kg / cum density mineral wool insulation (non combustible) pipe
section insulation covered with a layer of 120 gm/sqm polythene
sheet (vapour barrier) and finally applying 0.63mm aluminium sheet
cladding complete with type3 , grade 1 roofing feltstrip(as per IS:1322
as amended up to date ) at joints and repairing of damage to building
etc. as per specifications and as required of 400 mm size. For 3 DG
TOTAL OF DG STACK WORKS GRAND SUMMARY OF COSTS
(For Old DG Stake 3 Nos.) 28,11,439.85 26,81,760.00
Digitally signed by ARTI
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Final NIT IPO.pdf
Tender Document
final IPO_ALL WORKS.pdf
Tender Document
SCC.pdf
Tender Document
Milestone.pdf
Tender Document
GCC 2022 with amendment 1 to 8.pdf
Tender Document
SPECIFICATION Technical.pdf
Tender Document
LIST OF APPROVED MAKES.pdf
Tender Document
Drawings to upload.pdf
Tender Document
corrigendum-2799-Corrigendum02pricebidipoaddl12.pdf
pdf • 0.11 MB
corrigendum-2748-Corrigendum01Prebid files merged.pdf
pdf • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .