Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC | ₹32.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹34.6 LRejected-Finance | ₹34.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹35.7 LRejected-Finance | ₹35.7 L | L3 | Rejected-Finance L3 |
Tender Value
₹41.0 L
EMD Value
₹82,200
Closing Date
30 Jan 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Chabutra with shed and Approach Road for shamshan ghat main road Near Temple in Village Jewar Bangar (majra sahib nagar), YEA WC-06
2026_YEIDA_1107376_21
YEA/GM(PROJECT)/2026/455 DT-14/01/2026
Open Tender
Civil Works
Fixed-rate
90 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,001
₹82,200
11 Aug 2026
21 Jan 2026
2 Feb 2026
21 Jan 2026
30 Jan 2026
21 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m aboveground level and removal of rubbish up to distance of 50m out side the periphery of the area cleared DAR-18/2.31 | 225 | sqm | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 Sq.M on plan) including dressing of sides and ramming ob bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, withen a lead of 50m. Depth From 0.0 to 1.5 M below G.L. | 77.04 | Cum | 1 | ₹77.03 |
| 3 | Earth work in rough excavation , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammer and rolling every 3rd and top most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per ( A.R. ) For all kind of soil. Construction of embankment with approved material obtained from borrow pits with all lift and leads transporting to site spreading ,grading to required slope and compacting to meet requirement of table 300-2 up to 5 km Morth 2019/3.16/305 | 2,762.67 | Cum | 1 | ₹2,762.39 |
| 4 | Cement Concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials labour tools & plants etc reguired for proper complection of the work UPPWD SOR /281/P-17 | 5.04 | Cum | - | - |
| 5 | Brick work with F.P.S. bricks of class designation 150 in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) (UPPWD/SOR-2020/305a) | 27.72 | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : "1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).(UPPWD/SOR-2020/361) | 0.61 | Cum | - | - |
| 7 | 12 mm cement plaster of mix:1:6 (1 cement: 6 coarse sand) (DAR/13.4.2/BasedonUPPWD/SOR-2020) | 141.24 | sqm | - | - |
| 8 | Dry brick on edge flooring in required pattern with bricks of class designation150 on a bed of earth including fillingcompressed with M-150Bricks (DAR/11.2/AR/YEIDA/BasedonUPPWD/SOR-2020) | 3,364.99 | sqm | - | - |
| 9 | Finishing walls with water proofing cement paint of required shade : New work (Two or more coats applied @ 3.84 kg/10 sqm)New work (three or more coats) (DAR/13.44.1//BasedonUPPWD/SOR-2020) | 129.52 | sqm | - | - |
| 10 | Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.l. limpet washers or with G.l. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete (up to any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 1.00mm thick with zinc coating not less than 275gm/m2 (DAR/12.1.1//BasedonUPPWD/SOR-2020) | 96 | sqm | 1 | ₹95.99 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.36 MB
21.pdf
Tender Documents • 1.41 MB
BOQ_2045634.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].