Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.9 CrAccepted-AOC BALAJI NAGAR DONGAON TQ MEHKAR DIST BULDHANA | MEHKAR | BULDHANA | MAHARASHTRA | L1 | Accepted-AOC L1 | |
| 2 | L2₹39.7 Cr+₹77.6 L (1.99%)Rejected-Finance UNIT NO 301 ABH TOWN SQUARE NEAR CITY CENTER MALL NASHIK TAL AND DIST NASHIK | NASHIK | NASHIK | MAHARASHTRA | L2 | Rejected-Finance Disqualify | |
| 3 | L3₹39.8 Cr+₹91.4 L (2.35%)Rejected-Finance 1354 VIJAY NAGAR COLONY NILVANDI ROAD NEAR SWAMI SAMARTH KENDRA TAL DINDORI DIST NASHIK DINDORI 422202 | DINDORI | NASHIK | MAHARASHTRA | 422202 | L3 | Rejected-Finance Disqualify |
| Sl No | Description | Qty | Unit | SHREE PALSIDDHA CONSTRUCTION L1 | INDU CONSTRUCTION L3 | Atal Realtech Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of New Court Building in the Premises of District Court Building Buldhana Tq. Dist. Buldhana | ||||||
| 1.10 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. Basement & Gr. Floor | 550 | One Cubic Metre | 150 ₹82,500 Lowest | 150 ₹82,500 Lowest | 150.53 ₹82,788.96 |
| 2.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Basement & Gr. Floor | 2,831.32 | One Cubic Metre | 260 ₹7,36,143.2 Lowest | 261 ₹7,38,974.52 | 260.78 ₹7,38,353.1 |
| 3.00 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means Basement & Gr. Floor | 707.83 | One Cubic Metre | 300 ₹2,12,349 Lowest | 301 ₹2,13,056.83 | 300.9 ₹2,12,986.47 |
| 4.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means Basement & Gr. Floor | 606 | One Cubic Metre | 350 ₹2,12,100 Lowest | 351 ₹2,12,706 | 351.05 ₹2,12,736.72 |
| 5.00 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means Basement & Gr. Floor | 1,010 | One Cubic Metre | 410 ₹4,14,100 Lowest | 411 ₹4,15,110 | 411.23 ₹4,15,343.13 |
| 6.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means Basement & Gr. Floor | 1,045.14 | One Cubic Metre | 725 ₹7,57,726.5 Lowest | 726 ₹7,58,771.64 | 727.18 ₹7,60,001.2 |
| 7.00 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means Basement & Gr. Floor | 1,045.14 | One Cubic Metre | 350 ₹3,65,799 Lowest | 351 ₹3,66,844.14 | 351.05 ₹3,66,897.13 |
| 8.00 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. Basement & Gr. Floor | 3,381.32 | One Cubic Metre | 275 ₹9,29,863 Lowest | 276 ₹9,33,244.32 | 275.83 ₹9,32,654.45 |
| 9.00 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. Basement & Gr. Floor | 5 | One Cubic Metre | 980 ₹4,900 Lowest | 982 ₹4,910 | 982.94 ₹4,914.71 |
Tender Value
₹35.8 Cr
EMD Value
₹18 L
Closing Date
19 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PWD Buldhana
Office Of The Executive Engineer PWD Buldhana
Construction of New Court Building in the Premises of District Court Building Buldhana Tq. Dist. Buldhana
2023_PWR_912126_1
E-TENDERNOTICENO.06-2023-24
Open Tender
Civil Works - Buildings
Item Rate
400 days
District Court Building Buldhana Tq. Dist. Buldhan
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹18 L
Office Of The Chief Eng. P. W. Region , Amravati
16 Dec 2023
5 Jun 2023
21 Jun 2023
5 Jun 2023
19 Jun 2023
5 Jun 2023
9 Jun 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of New Court Building in the Premises of District Court Building Buldhana Tq. Dist. Buldhana | |||||
| 1.1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. Basement & Gr. Floor | 550 | One Cubic Metre | - | - |
| 2 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) By Mechanical Means Basement & Gr. Floor | 2,831.32 | One Cubic Metre | - | - |
| 3 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m) By Mechanical Means Basement & Gr. Floor | 707.83 | One Cubic Metre | - | - |
| 4 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0m.) By Mechanical Means Basement & Gr. Floor | 606 | One Cubic Metre | - | - |
| 5 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 m to 3.0 m.) By Mechanical Means Basement & Gr. Floor | 1,010 | One Cubic Metre | - | - |
| 6 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means Basement & Gr. Floor | 1,045.14 | One Cubic Metre | - | - |
| 7 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc. complete. (Lift upto 1.5 m). By Mechanical Means Basement & Gr. Floor | 1,045.14 | One Cubic Metre | - | - |
| 8 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed. Basement & Gr. Floor | 3,381.32 | One Cubic Metre | - | - |
| 9 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. Basement & Gr. Floor | 5 | One Cubic Metre | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_1588770.xls
BOQ Document • 0.77 MB
122312234.pdf
Tender Document • 1.31 MB
01-06-B-2-2.pdf
Tender Document • 23.59 MB
122312239.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .