| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.3 LAccepted-AOC | L1 | Accepted-AOC Quoted Below | |
| 2 | L2₹41.5 L+₹23,192.09 (0.56%)Rejected-Finance | L2 | Rejected-Finance Quoted Above |
| Sl No | Description | Qty | Unit | PTK and CO L2 | K.B.Subbaiyan L1 |
|---|---|---|---|---|---|
| 1.00Name of Work:Construction of Drain from Puthukan kovil to Eastside culvert at Periyathottipalayam H/o Bellathi Panchayat | |||||
| 2.00 | Earth work excavation for foundation with all leads and lifts in all soils and sub soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of not exceeding 15cm thick well consolidated depositing the surplus earth in places shown and levelling the site with all leads and lifts etc., complete in all respects | 655.83 | Cum | 140 ₹91,816.2 | 131.5 ₹86,241.65 Lowest |
| 3.00 | Cement concrete 1:4:8 (One of cement, Four of sand and Eight of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers.. | 61.48 | Cum | 5,330 ₹3,27,688.4 | 5,321 ₹3,27,135.08 Lowest |
| 4.00 | Supplying and errecting centering including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center For Corewall | 1,218.65 | Sqm | 555 ₹6,76,350.75 | 547 ₹6,66,601.55 Lowest |
| 5.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 7.2 | MT | 91,920 ₹6,61,824 | 91,910 ₹6,61,752 Lowest |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 185.52 | Cum | 9,075 ₹16,83,594 | 9,056.5 ₹16,80,161.88 Lowest |
| 7.00 | Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 6.43 | Cum | 6,085 ₹39,126.55 | 6,075 ₹39,062.25 Lowest |
| 8.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 0.78 | Cum | 7,380 ₹5,756.4 | 7,373 ₹5,750.94 Lowest |
| 9.00 | Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 3.41 | Sqm | 600 ₹2,046 | 569 ₹1,940.29 Lowest |
| 10.00 | Filling Soakpit with 40mm metal including all charges etc.,complete | 3.75 | Cum | 1,465 ₹5,493.75 | 1,457 ₹5,463.75 Lowest |
Tender Value
₹41.8 L
EMD Value
₹41,800
Closing Date
30 Jan 2026, 3:00 pmClosed
Special officer, Bellathi panchayat
Panchayat Office, Bellathi
Construction of Drain from Puthukan kovil to Eastside culvert at Periyathottipalayam H/o Bellathi Panchayat under PGF 2025-26 in Karamadai Block,Coimbatore District
2026_RDTN_647843_1
Roc. No. 03/2025/B.P Dated 21.01.2026
Open Tender
Civil Works
Item Rate
90 days
Bellathi
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹41,800
9 Mar 2026
28 Jan 2026
30 Jan 2026
28 Jan 2026
30 Jan 2026
28 Jan 2026
Earth work excavation for foundation with all leads and lifts in all soils and sub soils and to the required depth as may be directed except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layers of not exceeding 15cm thick well consolidated depositing the surplus earth in places shown and levelling the site with all leads and lifts etc., complete in all respects
Cement concrete 1:4:8 (One of cement, Four of sand and Eight of hard broken stone) using 40mm size hard broken stone for foundation inclusive of shoring, strutting, bailing out water, ramming, curing etc., complete in all respects as directed by the departmental officers..
Supplying and errecting centering including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center For Corewall
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 20mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Filling Soakpit with 40mm metal including all charges etc.,complete
Filling Soakpit with 20mm metal including all charges etc.,complete
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Casting and fixing of RCC Precast slab of following thick 1:2:4 using 20mm hbg jelly
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.42 MB
BOQ_776684.xls
BOQ • 0.28 MB
pricebid.pdf
Tender Documents • 0.88 MB
technicalbid.pdf
Tender Documents • 1.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .