Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.4 L
EMD Value
₹8,400
Closing Date
23 Dec 2020, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer NH Division Hassan
Office of EE NH Division Hassan
Conducting traffic census during the month of January2021 at Km 99.400, at Km113.750 and at Km 164.00 of NH73, Mangalore Tumkur section, at Km 261.450 of NH75, B.C Road Vellore section and at Km3.10, at Km15.500 of NH-173, Mudigere Kadur section
2020_MoRTH_603513_1
EE/NHD/HSN/TS/NIT13/202021/1
Open Tender
Civil Works - Roads
Item Rate
7 days
Kottigehara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
RPAO, Bangalore
₹8,400
24 Dec 2020
16 Dec 2020
24 Dec 2020
16 Dec 2020
23 Dec 2020
16 Dec 2020
16 Dec 2020 - 21 Dec 2020
90 days
Amount
Providing temporary traffic census count post , on National Highways, counting manually, in three shifts, (24H,7D) in both directions, with necessary literate assistants, and supporting labourer. (including updating the details as soft copy) Arrangements with cost of temporary tarpaulin shelter with top cover and three sides, of 3X5Mtrs size, one steel table, two plastic chairs, lighting arrangements, information banners, all arrangements to be made on previous day, and to be removed after completion of counting work, as per ministrial norms, guidelines, the direction and instructions of engineer in charge of work. (Period from 08-01-2021 to 15-01-2021) a) Count Post at Km.99.40 (Kottigehara) of NH-73 - 7 Days in both directions. b) Count Post at Km.113.750 (Mudigere Hand Post) of NH-73 - 7 Days in both directions. c) Count Post at Km.164.00 (Halebeedu) of NH-73 - 7 Days in both directions. d) Count Post at Km.261.450 (Gundya) of NH-75 - 7 Days in both directions. e) Count Post at Km.3.10 (Beilagola) of NH-173 - 7 Days in both directions. f) Count Post at Km.15.500 (Kelaguru) of NH-173 - 7 Days in both directions.
V CONSTRUCTIONS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .