Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 53 MIDDLE STREET ARUMALAI TIRUKOILUR VILLUPURAM DISTRICT | VILLUPURAM | TAMIL NADU | 604001 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance PASUMALAITHANGAL GINGEE VILUPPURAM | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.5 L
EMD Value
₹13,000
Closing Date
26 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA VPM
3 No.of Clean and Green Village in T.Devanur, Kandachipuram Panchayat(s) of Mugaiyur Block under AGAMT II 2021-22- Package No. TNVPM/AGAMTII/095
2022_RDTN_240622_1
TNVPM/AGAMTII/095
Open Tender
Civil Works
Works
180 days
Viluppuram
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,000
Yes
26 Jul 2022
9 Jul 2022
26 Jul 2022
9 Jul 2022
26 Jul 2022
12 Jul 2022
90 days
Amount
Providing Horizontal filter with CC Drain @ Vaniyar Street In Devanur Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Plastering in Cement Mortor 1 : 3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and filling 40mm and 20mm ISS HBG metal including cost and conveyance of metal and labour charges for filling etc complete.
Supply and filling Red Gravel including cost and conveyance of Red Gravel and labour charges for filling etc complete.
Supply and filling Char coal including cost and conveyance of Char coal and labour charges for filling etc complete.
Supply and filling M-Sand including cost and conveyance of M-Sand and labour charges for filling etc complete.
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Supply and fixing 110mm dia PVC pipe including labour charges for fixing etc
Fixing of Name Board including cost, painting, Lettering, installation etc.
Photographic charges for taking photos in various stages before execution, during execution and after execution
Providing Horizontal filter with CC Drain @ Main Road In Devanur Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Plastering in Cement Mortor 1 : 3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and filling 40mm and 20mm ISS HBG metal including cost and conveyance of metal and labour charges for filling etc complete.
Supply and filling Red Gravel including cost and conveyance of Red Gravel and labour charges for filling etc complete.
Supply and filling Char coal including cost and conveyance of Char coal and labour charges for filling etc complete.
Supply and filling M-Sand including cost and conveyance of M-Sand and labour charges for filling etc complete.
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Supply and fixing 110mm dia PVC pipe including labour charges for fixing etc
Fixing of Name Board including cost, painting, Lettering, installation etc.
Photographic charges for taking photos in various stages before execution, during execution and after execution
Providing Horizontal filter with CC Drain @ Patti Street In Kandachipuram Panchayat
Earth work excavation for foundation in all classes of soils except hard rock requiring blasting with initial lead and lift etc including levelling the site etc. complete with standard specification in hard stiff cllay, black cotton soil, hard fred earth
Cement Concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone jelly including labour charges for mixing concrete watering and laying the concrete in layers not more the 15 cm thick compacting etc complete complying with standard specification etc c
Supplying and erecting shuttering including complying with standard speficiation including all labour charges etc.complete.
Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum
Cement Concrete : 1:2:4 with broken stone jusing 20mm gauage machine broken HBG metal including cost and conveyance and all labour charges etc.complete.
Plastering in Cement Mortor 1 : 3 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supply and filling 40mm and 20mm ISS HBG metal including cost and conveyance of metal and labour charges for filling etc complete.
Supply and filling Red Gravel including cost and conveyance of Red Gravel and labour charges for filling etc complete.
Supply and filling Char coal including cost and conveyance of Char coal and labour charges for filling etc complete.
Supply and filling M-Sand including cost and conveyance of M-Sand and labour charges for filling etc complete.
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Labour charges for filling Metal, Gravel, Char coal and M-Sand etc
Supply and fixing 110mm dia PVC pipe including labour charges for fixing etc
Fixing of Name Board including cost, painting, Lettering, installation etc.
Photographic charges for taking photos in various stages before execution, during execution and after execution
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ASR CONSTRUCTIONS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .