Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance | -25.55% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.0 L+₹3,520 (1.18%)Admitted-Finance | -24.67% | ₹3.0 L+₹3,520 (1.18%) | L2 | Admitted-Finance |
Tender Value
₹4 L
EMD Value
₹8,000
Closing Date
1 Aug 2026, 6:00 pmClosed
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
AS PER BOQ
2026_PHE_314613_1
e-NIT NO. GWD/60 of 2026-27
Open Tender
Repair and Maintenance Works
Percentage
10 days
AS PER BOQ
AS PER SBD
5 documents required · 5 mandatory
₹500
EXECUTIVE ENGINEER JAL SHAKTI (M) GW
₹8,000
OFFICE OF THE EXECUTIVE ENGINEER JAL SHAKTI (M) GW
6 Aug 2026
4 Jul 2026
3 Aug 2026
4 Jul 2026
1 Aug 2026
7 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Shifting of air compressor to the site of work along with all accessories, tools & tackles. POL. loading/unloading, watch & ward, and all allied material required for execution of the job. Clearance of the site if required, including cutting, levelling and dressing of the ground for deployment of equipment and stacking of materials. The job also includes extraction of already installed submersible pumpset.
Deployment of the air compressor and lowering of the air line along with column pipes for redevelopment of the tube well by cleaning all strainers from the top to the bail plug and again from the bail plug to the top until clear, sand-free potable water is obtained.
Stabilization and yield testing of the tube well using Vertical Turbine (VT) or Submersible Pump of adequate capacity as per specifications to determine the safe yield and drawdown of the tube well, and to ensure continuous discharge of clear, sand-free potable water at the required head.
The job includes the cost of all labour, POL, hire charges, shifting, loading/unloading, watch & ward, tools & tackles, packing of pea-shaped gravel, if required, and any other material or incidental work necessary for successful redevelopment, stabilization and testing of the tube well, well, complete in all respects | - | Job | 0.58 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.38 MB
BOQ_1018706.xls
BOQ • 0.29 MB
extensionnotice60.pdf
PDF • 0.01 MB
extensionnotice60.pdf
PDF • 0.01 MB
extensionnotice60.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .