Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹22.0 L (7.64%)Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹3.1 Cr+₹22.0 L (7.64%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹36.6 L (12.7%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | ₹3.3 Cr+₹36.6 L (12.7%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹44.8 L (15.5%)Admitted-Finance | ₹3.3 Cr+₹44.8 L (15.5%) | L4 | Admitted-Finance |
| 5 | L5₹3.4 Cr+₹53.5 L (18.5%)Admitted-Finance | ₹3.4 Cr+₹53.5 L (18.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GUHANSANJEEVI ENTERPRISES L5 | M.JAYAVEL L4 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L2 | K DHINAKARAN L3 | Dillibabu L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying, Fabricating, Galvanizing, transporting of HTS/GI towers parts including stub and cleat , extension parts, cost of all materials labour lead lift etc. complete for the 110/230/400KV DC/MC towers HT steel tower parts | 79.12 | MT | 1,07,000 ₹84,65,840 Lowest | 1,15,000 ₹90,98,800 | 1,20,000 ₹94,94,400 | 1,20,000 ₹94,94,400 | 1,10,000 ₹87,03,200 |
| 2.00 | Supplying, Fabricating, Galvanizing, transporting of HTS/GI towers parts including stub and cleat , extension parts, cost of all materials labour lead lift etc. complete for the 110/230/400KV DC/MC towers LT steel tower parts | 33.91 | MT | 1,10,000 ₹37,30,100 | 1,05,000 ₹35,60,550 Lowest | 1,10,000 ₹37,30,100 | 1,10,000 ₹37,30,100 | 1,10,000 ₹37,30,100 |
| 3.00 | Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size) | 6.5 | MT | 1,45,000 ₹9,42,500 | 1,30,000 ₹8,45,000 | 1,20,000 ₹7,80,000 Lowest | 1,20,000 ₹7,80,000 Lowest | 1,20,000 ₹7,80,000 Lowest |
| 4.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Single suspension fittings | 18 | Set | 2,250 ₹40,500 | 2,500 ₹45,000 | 2,000 ₹36,000 Lowest | 2,000 ₹36,000 Lowest | 2,000 ₹36,000 Lowest |
| 5.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Single Tension fittings | 72 | Set | 2,500 ₹1,80,000 | 2,500 ₹1,80,000 | 2,000 ₹1,44,000 Lowest | 2,000 ₹1,44,000 Lowest | 2,500 ₹1,80,000 |
| 6.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Vibration Damper for ACSR Zebra | 72 | Set | 1,150 ₹82,800 | 1,000 ₹72,000 Lowest | 1,000 ₹72,000 Lowest | 1,000 ₹72,000 Lowest | 1,000 ₹72,000 Lowest |
| 7.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Mid span comp.joint for ACSR Zebra | 6 | Set | 600 ₹3,600 | 100 ₹600 Lowest | 200 ₹1,200 | 200 ₹1,200 | 100 ₹600 Lowest |
| 8.00 | Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Repair sleeve for ACSR Zebra | 6 | Set | 650 ₹3,900 | 100 ₹600 | 200 ₹1,200 | 200 ₹1,200 | 50 ₹300 Lowest |
| 9.00 | Pipe type earthing | 10 | Nos | 2,500 ₹25,000 | 3,000 ₹30,000 | 3,000 ₹30,000 | 3,000 ₹30,000 | 1,000 ₹10,000 Lowest |
| 10.00 | Supply of Danger Board | 10 | Nos | 800 ₹8,000 | 1,000 ₹10,000 | 200 ₹2,000 | 200 ₹2,000 | 100 ₹1,000 Lowest |
Tender Value
₹4.9 Cr
EMD Value
₹3.9 L
Closing Date
7 Mar 2024, 2:30 pmClosed
CE/TP-I/CNI
Chief Engineer Transmission Projects I Chennai 3rd Floor 230 KV GIS Substation building A 10, Guindy Industrial Estate, Guindy, Chennai 32.
Deviation of Kadappri Porur 230KV SC line on DC tower between Location 23 and 31 between Location 36 and 38 for widending of Adayar River from Chembarambakkam to Anakaputhur Bridge in KundrathurTaluk, Kanchipuram District at the request of Execut
2024_EB_431179_1
TP1-81/2023-24
Open Tender
Civil Works - Others
Works
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.9 L
Yes
19 Jun 2024
27 Feb 2024
8 Mar 2024
27 Feb 2024
7 Mar 2024
27 Feb 2024
Amount
Supplying, Fabricating, Galvanizing, transporting of HTS/GI towers parts including stub and cleat , extension parts, cost of all materials labour lead lift etc. complete for the 110/230/400KV DC/MC towers HT steel tower parts
Supplying, Fabricating, Galvanizing, transporting of HTS/GI towers parts including stub and cleat , extension parts, cost of all materials labour lead lift etc. complete for the 110/230/400KV DC/MC towers LT steel tower parts
Supply of Hot dip galvanised bolts and nuts as per IS conforming to latest issue and as detailed in the specification (Various size)
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Single suspension fittings
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Single Tension fittings
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Vibration Damper for ACSR Zebra
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Mid span comp.joint for ACSR Zebra
Supply for transmission line hardwares as per IS conforming to latest issue suitable for ACSR Zebra conductor Repair sleeve for ACSR Zebra
Pipe type earthing
Supply of Danger Board
Supply of Number plate
Supply of Phase plate (Set of three)
Supply of Name Board
Supply of Circuit Plate
Supply of Anti climbing device
Conducting check survey in the already fixed route, Fixing of tower location and pit marking, jungle clearance, tree cutting etc., complete.
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In Hard stiff clay, stiff black cotton, hard red earth, shales and murram, stoney earth and earth mixed with small size boulders SS 20 B
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In soft disintegrated rock not requiring blasting
Earth work excavation in all soils including cost of all materials labour lead lift etc. complete as directed by the Engineer at site. In Medium rock and dense medium rock not requiring blasting
Providing shoring and shuttering including cost of form work all metrials labour charges lead, lift etc., complete
PCC 1 : 3 : 6 (M10) using 20 mm HBG metal without form work for foundation including cost of all materials, curing, labour, lead and lift. etc., complete.
RCC M30 (minimum cement content 320 kg/ cum) using 20 mm HBG metal for pile cap with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete.
Transport of stub, cleat and template including assembling of template, stub and cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete.
Labour charges for erection of towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, one coat of Zinc rich primer, 2 coats of Zinc rich enamel paint, cost of all materials, labour, lead, lift etc., complete.
Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting with good quality of zinc paint on the welded portion etc., complete.
Transportation & installation of Pipe type earthing earthing for towers including cost of all T&P, labour, lead, lift etc., complete, as directed.
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Danger Plate
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Number plate
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Phase plate (set of Three)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Name plate (set of Two)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Circuit plate (set of Two)
Transportation and installation of following tower accessories including cost of all T&P, labour, lead, lift etc., complete, as directed. Anti-Climbing device (Set of four)
Labour charges for Paying out, Rough sagging, Tensioning of 3 Nos. Zebra conductor with fittings including transport, sorting out of conductor according to drum schedule and loading and unloading at site, providing trussels and rough sagging, tensioning, clipping, labour, providing vibration dampers including giving jumper connections, cost of T&P, lead and lift etc., complete under LC.
Transporting, erection, testing and commissioning of 1no. OPGW 48wire including fixing of hardware fittings and accessories etc., complete (Stringing of OPGW is to be done using tension stringing equipments)
Labour charges for Transporting and hoisting of 14 Unit of 120 KN Anitfog Disc Insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under LC condition.
Labour charges for Transporting and hoisting of 13 Units of 90 KN Antifog Disc Insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under LC condition.
Supplying, spreading, filling, consolidation of well gravel for formation of approach road and stacking platform for mobilisation of pile equipment to tower site and erection of towers including cost of well gravel, compaction, casurina props, stacking with sand bags, transport, labour, dismantling & removing the platform after completion of work, lead, lift, etc., complete.
Bailing out of water by pump set during the concrete including cost of diesel pump set5.00 HP cost of all materials, diesel, engine oil, hire charges, labours, lead and lift, etc., complete.
Preparation of route alignment with remote sensing and field verfication in GTS map using 1:50000 scale including procurement, processing GTS map, GEO referencing, route alignment, integration of the route in the layout with identification of reserved forest, developed area etc., including cost of all materials, labour, all leads, lifts etc., complete as directed by Engineer at site.
Conducting preliminary survey and detailed survey with GPS, Total station & DGPS, plotting profile with Auto Cad & tower spotting and submission of report, tower schedule, justification of angle points (10 copies) and profile in duplicate including cost of all materials, transporting, labour, lead, lift etc., complete as directed by the Department Engineer at site.
Labour charges for dismantling of existing GI towers and moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Labour charges for dismantling of existing 3nos. Zebra conductor, moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Labour charges for dismantling of existing OPGW with all fittings, moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Labour charges for dismantling of 13units of 90 KN disc suspension insulators, moving away from site in as is where is conditionincluding all labour charges, lead, lift etc., complete.
Labour charges for dismantling of 14units of 120 KN disc tension insulators, moving away from site in as is where is condition including all labour charges, lead, lift etc., complete.
Less credit - Tower part Scrap
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED
K DHINAKARAN
M.JAYAVEL
GUHANSANJEEVI ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
BOQ_512423.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .