Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
29 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MANGESH DEOKATE
Retail Ops. Northern Region, Bharat Petroleum Corporation Limited
Tender for Construction of Badminton court at BPCL Jobner Installation TENDER FOR CONTRUCTION OF BADMINTON COURT FOR BPCL JOBNER INSTALLATION
18617
1000427024
Limited Tender
Works
Retail Ops. Northern Region
29 Nov 2024
25 Nov 2024
29 Nov 2024
25 Nov 2024
29 Nov 2024
25 Nov 2024
25 Nov 2024 - 29 Nov 2024
JOBNER.TENDER/ENGG/2024-25/BADMINTON COURT
TENDER FOR CONTRUCTION OF BADMINTON COURT
Due Date / Time : 29.11.2024 @ 15:00 hrs.
Time for Completion : One Month from the issue of PO (Contract is valid for one year
from the date of LOI).
1. The tenderer should quote for all items in the tender schedule. The rates should be
expressed both in figures and in words: where discrepancy exists between the two,
the rates expressed in words will prevail. Similarly, if there is any discrepancy exists
between the unit rate and the amount, the unit rate will prevail.
2. The rates be quoted in the same units as mentioned in the tender schedule.
3. All entries in the Tender Documents should be in Ink/Typed. Corrections, if any,
should be attested by full signature of the Tenderer.
4. Every page of the tender documents shall be signed by the tenderer or his
authorized representative.
5. The tenderer should indicate the time required to complete the entire work from the
date of receiving the order.
6. The rate quoted should be inclusive of all material, labour, water, electricity, power
equipment tools/tackles, centering, shoring, lifts, leads, scaffolding,
excise/customs/duties, sales tax, works contact tax etc. levied by State/Central
authorities. All materials are to be supplied by the tenderer unless otherwise stated.
The successful tenderer have to pay wages as per minimum wages act as advised
7. The rates quoted shall be valid for a period of 180 days. Once the quotation is
accepted, the rates quoted shall be firm till the entire work is completed in all
ACCEPTANCE OF TENDER:
8. In complete/Conditional tender quotations or those received late and/not confirming
to the terms and conditions, the tender documents will be rejected.
Tenderer‘s Sign And Seal
9. The Company reserves the right to reject any or every tender without assigning any
reason whatsoever and/or to negotiate with the tenderer (s) in the Company
considers suitable.
10. The company further reserves its rights to allow to the Public enterprises ‘Price
Preference’ (facilities as admissible under the existing policy) as may be decided
by the company.
Security Deposit: (Applicable only for works costing Rs. 50, 000/- and above in value)
11. (a). The successful tenderer, before commencement of the work, shall have to
provided to the company, by way of security, a money deposit or a Bank Guarantee
in the standard format provided by the Company for an amount equivalent to 3 %
of the total tendered value of the works, subject to a minimum of Rs. 5000/- and a
maximum of Rs. 1,00,000/-.In case the tenderer wishes to avail exemption on EMD,
necessary document fort the same to be attached. The tenderer shall have the
option to adjust the earnest money towards security deposit if he so desires.
The security deposit will be retained till for 1 year after the successful completion
of the work. In the case of security deposit in the form of a Bank Guarantee, the
same shall be kept valid by the tenderer at his cost till the completion of the work
under contract and shall be extended from time to time. No interest will be payable
on security deposit.
EXECUTION OF AGREEMENT:
12. The successful tenderer shall within 15 days of the Company’s communication to
him of the acceptance of his tender, execute a formal Agreement with the
Company, on the Company’s format.
EXECUTION OF WORKS:
13. The successful tenderer should submit details construction programme adhering
to the completion time quoted in the Agreement. The programme will form part of
the contract. However, the company reserves the right to alter the programme, if
necessary, from time to time and no claim of successful tenderer on account of
such alternation will be entertained.
14. All materials required for the execution of work should conform to the standard
specification and approved by the Engineer in Charge before actually put to use.
Commencement of work without prior approval shall be entirely at the risk and cost
of the contractor. No delay due to non-availability of materials, tools, equipment
etc. will be entertained by the Company. In the case of certain
machinery/equipment, the Company’s site Engineer may inspect the items for
approval before they are brought to the site.
Tenderer‘s Sign And Seal
15. The responsibility for the safety, security and accounting of the materials and
equipment brought or installed by the successful tenderer or handed over to him
by the Company for completion of the work will remain with him till the acceptance
of the work by the Company. Any damage caused to the material/equipment during
the execution of work will be made good by the successful tenderer at his cost. The
Company may require the successful tenderer to have guarantee/indemnity bond
executed for the value of the materials supplied to him free of cost, as per terms of
16. Quantities shown in the Tender Schedule are approximate and payment shall be
made as per actual measurements. The successful tenderer is not entitled for any
sort of compensation towards materials procured/stored in excess of the measured
17. The Company reserves the right to increase or to decrease the tendered quantity
or revise specifications, drawing, and designs of any or every item or delete them
at any stage of work. The successful tender’s claim for compensation or damages
on account of these shall not be entertained. Such deviations will be adjusted at
the rates contained in the Agreement or at prevailing market rates, if the rates are
not available in the agreement, by issuing variation order(s). In case it becomes
necessary for the Company to temporarily suspend or postpone the work, partly,
or fully due to unforeseen circumstances, the company shall not be liable for any
compensation on account of resultant delays.
18. The entire work will be carried out under the supervision of the authorized
representative of the Company, but this will not detract successful tenderer(s) full
responsibility for quality/period of execution of work.
19. Detailed measurements of works carried out shall be taken jointly by the successful
tenderer and out site Engineer at every stage of work, before preceding the next
All work shall be measured as per the procedure laid down. Payment will be made
as per measured quantities and not as per Tender Schedule quantities.
20. The successful tenderer shall submit to the office which has awarded the contract,
periodic progress reports of his work as stipulated by our Site Engineer.
21. The successful tenderer shall not undertake on his own any change in
specifications mentioned in the tender documents. In case of doubts he will refer
the matter in writing to the Company and act as per clarifications given by the
Company. Any changes in the work involving changes in original specifications
quantities/additional items of work should be covered by obtaining suitable variation
order (s) from the company immediately.
22. If the performance of the successful tenderer if found to be unsatisfactory, the
Company reserves the right to cancel in part or the whole of the contract and get
Tenderer‘s Sign And Seal
the work executed through alternative means at the entire risk and cost of the
successful tenderer.
23. If the successful tenderer does not complete the work in the stipulated time, the
Company reserves the right to recover liquidated damages at 0.5% of the total
contract value for every week of delay or part there of subject to a maximum of 5%
of the total contract value until the work is satisfactorily completed and handed
over. However delay in completion of a specific urgent job the maximum
compensation will be increased to 15% if the total contract value. Such damages
may be deducted by the Company from any money due to the tenderer and any
further amount due from the tenderer shall be paid by the tenderer to the company
This is a specific urgent job – YES
24. The successful tenderer should ensure the safety of adjoining property and shall
make good and loss to product/property resulting from his negligence.
25. Hot work be carried out only in the areas earmarked for the purpose, after required
safety precautions have been taken and only after obtaining written permission
form the Site Engineer.
Any provision required to be made e.g. wind screens of G.C.I Sheets etc. to make
the area safe for hot work, will be made the successful tenderer at his own cost.
26. The work in the Company’s premises should be carried out during the Company’s
normal working hours and without obstructing day to day working the
establishment. If any work is required to be carried out beyond normal working
hours, prior permission should be obtained before undertaking such work.
27. In the event of the successful tenderer failing to complete the work within the
stipulated time, the Company shall have the right to employ any other agency to
complete the remaining work at the risk & cost of the successful tenderer.
28. It will be the successful tenderer’s responsibility to get the works approved and
obtain all certificates for plumbing, electrical, civil works from local, municipal,
Governmental or other required authorities.
29. Tanks, Pumps, Pipelines, Posts, Equipments and/or any other materials to be
supplied by the Company will be supplied anywhere within the site premises.
Safekeeping, transporting and handling of the same to actual location of installation
will be the successful tenderer’s responsibility for which no extra payment will be
30. During execution of work if it is found necessary to dismantle a portion of existing
bund wall, enclosure wall, compound wall, fencing etc. to facilitate the movement
of materials and equipment, the same shall be carried out after obtaining
permission in writing from Company’s authorized representative and also made
Tenderer‘s Sign And Seal
good by the contractor at his own cost.
31. The successful tenderer is expected to co-operate/ co-ordinate with other
contractor’s carrying out the work allocated to them so as to avoid breading up of
work already done by them or causing any hindrance in the progress of their work.
In case there is any difficulty/dispute, the same should be immediately brought to
be notice of the Site Engineer.
32. If the work is required to be carried out in a working Depot, Installation, retail outlet
etc. The progress of work is likely to be interrupted on account of operations in such
units. Stoppage of work under such circumstances shall not entitle the successful
tenderer to claims any compensation for idling, machinery etc. during such
33. The successful tenderer and his man/men shall abide by all security/safety rules
regulations in force at location and the low, bye –laws and statutes of Government,
semi- Government and other local authorities such as requirements/liability under
enactments like the Workmen’s Compensation Act., Contractor labour Act etc. and
the Company shall stand indemnified against any claims on these scores. The
Successful tenderer and his men shall strictly abide by “no smoking’ and other
petroleum regulations on the premises.
34. The successful tenderer shall arrange for tat least one competent supervisor to be
present at the all-time during the progress of the work, who shall be duly authorized
to take instructions and execute them on his behalf.
FINAL BILLS / RETENTION MONEY:
35. On completion of the work to the satisfaction of the Company’s authorized
representative and after clearing the debris, tools, tackles, shoring, centering,
materials etc, from the site and obtaining necessary certificates as required from
the local authorities, the successful tenderer shall submit his final bill based on the
jointly recorded measurements of actual work done.
The final bill of the job done should be raised, unless otherwise agreed by the
Corporation in writing, within one month from the date of completion of the total job
as per contract. Whether the job has been completed or not will be decided at the
sole discretion of the corporation. Payment of the final bill will be made after
adjusting interim payments and retention amount deducted and retained.
36. (a) The Corporation will be entitled to deduct 10% value of all interim/running bills
and in final bills as Retention Money for all jobs exceeding Rs.100000/- and no
interest will be paid on money retained by the company.
The said retention money will be retained for a period of one year and paid to the
Contractor after adjusting any dues of the Corporation against the Contractor under
Tenderer‘s Sign And Seal
the workmanship/materials provided to the Contractor and /or against any other
claims for any reason whatsoever under the Agreement which may arise within the
said period of the one year. The retention period of one year will commence from
the date of the final bill or the date of completion of the job (as reckoned by BPCL)
whichever is earlier.
37. The successful tenderer shall not subject or assign any part of the work to another
party, without the prior written consent of the Company. In any event the successful
tenderer will be solely responsible for the work so subject or assigned.
38. The contractor undertakes to ensure due and complete compliance with all laws
regulations, rules etc., whether of the Central Government or the state Government
or any other competent authority applicable to the workmen employed or whose
services are otherwise availed of by the contractor whether in connection with the
construction work at the site or otherwise. The employer shall have the right to
inspect the records maintained by the Contractor concerning such workman from
time to time and the Contractor to produce of the Employer’s inspection in order to
ascertain whether or not the requirements of all such laws regulations, rules etc.,
have been complied with by the Contractor. In the event of the any contravention
of such laws, regulations rules etc., coming to light whether as a result of such
inspection or otherwise, the Employer shall have the right to require the Contractor
to effect such compliance within such time as the Employer may prescribe in that
behalf and in the event of the Contractor failing to effect such compliance within the
time prescribed by the Employer then the Employer shall without prejudice to this
rights to entitled to withhold form the amount payable to the Contractor any amount
payable to the workmen under any such laws, regulations or rules and to make
payment thereof the workmen. The Employer shall also have in that event the right
to terminate the contract with immediate effect and to exercise powers reserved to
the Employer under the contract as result of termination.
39. Special conditions, if any pertaining to the tender are shown in Tender Schedule.
(a) Any dispute or differences of any nature whatsoever, any claim, cross-claim,
counter-claim or set off of the Corporation against the Contractor or regarding any
right, liability, act, omission or on account of any of the parties hereto arising out of
or in relation to this Agreement shall be referred to the Sole Arbitration of the
Director (HR) of the Corporation or of some officer of the Corporation who may be
nominated by the Director (HR). The Contractor will not be entitled to raise any
objection to any such Arbitrator on the ground that the Arbitrator is an officer of the
Corporation or that he has dealt with the matters to which the contract relates or
that in the course of this duties as an Officer of the Corporation he had expressed
views on all or any other matters in dispute or difference. In the event of the
Arbitrator to whom the matter is originally referred being transferred or vacating his
office or being unable to act for any reason, the Director (HR) as aforesaid at the
time of such transfer, vacation of office or inability to act may in the discretion of
Tenderer‘s Sign And Seal
the Director (HR) as designate another person to act as Arbitrator in accordance
with the terms of the Agreement to the end and intent that the original Arbitrator
shall be entitled to continue the Arbitration proceedings notwithstanding his transfer
or vacation of office as an Office of the Corporation if the Director (HR) does not
designate another person to act as Arbitrator on such transfer, vacation of office or
inability of original Arbitrator. Such persons shall be entitled to proceed with the
reference from the point at which it was left by his predecessor. It is also a term of
this contract that no person other than the Director (HR) or a person nominated by
such Director (HR) of the Corporation as aforesaid shall act as Arbitrator
hereunder. The award of the Arbitrator so appointed shall be final conclusive and
binding on all parties to the agreement subject to the provisions of the Arbitrator
Act 1940 or any statutory modification or renactment thereof and the rules made
there under for the time being in force shall apply to the Arbitration proceedings
under this clause.
(b) The award shall be made in writing and published by the Arbitrator within two years
after entering upon the reference or within such extended time not exceeding
further twelve months as the Sole Arbitrator shall be writing under his own hands
appoint. The parties hereto shall be deemed to have irrevocably given their consent
to the Arbitrator to make and publish the award within the period referred to here
in above and shall not be entitled to raise any objection or protest thereto under
any circumstances whatsoever.
(c) The Arbitrator shall have power to order either of the parties to abide by observe
and perform all such directions as the Arbitrator may think fit having regard to the
matters in difference i.e. dispute before him. The Arbitrator shall have all summary
powers and may take such evidence oral and / or documentary, as the Arbitrator in
his absolute discretion thinks fit and shall be entitled to exercise all powers under
the Arbitrator Act 1940 including admission of any affidavit as evidence concerning the
matter in difference i.e. dispute before him.
(d) The parties against whom the Arbitration proceedings have been initiated, that is
to say, the Respondents in the proceeding, shall be entitled to prefer a cross-claim
or set off before the Arbitrator in respect of any matter an issue arising out of or in
relation to the Agreement without seeking a formal reference of Arbitration to the
Director (Marketing) for such counter-claim, Cross-claim or set off and the Arbitrator
shall be entitled to consider and deal with the same as if the matters arising there
from has been referred to him originally and deemed to form part of the reference
made by the Director (Marketing).
(e) The Arbitrator shall be at liberty to appoint, if necessary any Accountant or
Engineer or other technical person to assist him and to act by the opinion so taken.
(f) The Arbitrator shall have to make one or more awards whether interim or otherwise
in respect of the dispute and difference and in particular will be entitled to make
separate awards in respect of claims or cross-claims of the parties.
Tenderer‘s Sign And Seal
(g) The Arbitrator shall be entitled to direct any one of the parties to pay the costs of
the other party in such manner and to such extent as the Arbitrator may in his
discretion determine and shall also be entitled to require one or both the parties to
deposit funds in such proportion to meet the Arbitrator’s expenses whenever called
(h) The parties hereby agree that the courts in the city of Jaipur alone shall have
jurisdiction to entertain any application or other proceedings in respect of anything
arising under this Agreement and any award or awards made by Sole Arbitrator
here under shall be failed in the concerned courts in the city of Jaipur only.
Tenderer should mention estimate of time for :
Completing the work shown in the tender.
This is a specific urgent job :
I / We have read carefully the above terms and
conditions of Tender and agree to abide by the same.
Signature of the Contractor …………….. (Or his
authorized representative)
Name / Seal of the Contractor:
Tenderer‘s Sign And Seal
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
18617.pdf
pdf • 0.38 MB
BUDGETDOC_18617.pdf
pdf • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .