| 1 | L1₹3.7 LAccepted-AOC AT MAIN ROAD KATHARA PO KATHARA BOKARO JHARKHAND 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | ₹3.7 L Quoted ₹2.8 L | L1 | Accepted-AOC L1 bidder |
| 2 | Rejected-Technical CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | - | - | Rejected-Technical Technically Rejected |
| 3 | Rejected-Technical KATHARA DIST BOKARO 829116 | KATHARA | BOKARO | JHARKHAND | 829116 | - | - | Rejected-Technical Technically Rejected |
| 4 | Rejected-Technical AT PO JARANGDIH BOKARO | JARANGDIH | BOKARO | JHARKHAND | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | M/S ATRACON ELECTRICALS L1 |
|---|---|---|---|---|
| 1.01 | Cost of Copper Wire/Strip 325Kg - 80% = 260 Kg - Less Scrap 60% (260Kg - 156 Kg) = 104 Kg | 104 | Kg | 1,035 ₹1.1 L |
| 1.02 | Insulation Cost @ 15% on Sl. No. 01 | 1 | Job | 40,360 ₹40,360 |
| 1.03 | Labour Charge @ 15% on Sl. No. 01 | 1 | Job | 40,360 ₹40,360 |
| 1.04 | Cost of Coils Moulding wirh 'H' Class Varnishing, Mica as per required | 48 | Nos | 1,548 ₹74,304 |
| 1.05 | Both side (DE & NDE) dala housing on metal filling and cutting of bearing size | 2 | Nos | 7,865 ₹15,730 |
| 1.06 | Cost of Copper Cable 16 Sq.mm for connection lead of 3.3KV grade | 6 | Mtrs | 1,450 ₹8,700 |
| 1.07 | Cost of bushing with Copper Studs | 3 | Nos | 7,500 ₹22,500 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹3.7 L
EMD Value
₹4,600
Closing Date
9 Mar 2026, 5:00 pmClosed
Project Engineer EnM Jarangdih
Project Engineer EnM Jarangdih
Repairing and rewinding of 325KW Induction Motor, 3.3KV, 1490 RPM, Make - GEC, Sl.No. 183002/1 of Jarangdih Colliery OCP Mines.
2026_CCL_354822_1
JRD/PE(EnM)/E-Tender/25-26/42 Date 27.02.26
Open Tender
Electrical and Maintenance Works
10 days
Jarangdih
Please refer Tender documents.
6 documents required · 6 mandatory
₹4,600
28 Apr 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 7 Mar 2026
Cost of Copper Wire/Strip 325Kg - 80% = 260 Kg - Less Scrap 60% (260Kg - 156 Kg) = 104 Kg
Insulation Cost @ 15% on Sl. No. 01
Labour Charge @ 15% on Sl. No. 01
Cost of Coils Moulding wirh 'H' Class Varnishing, Mica as per required
Both side (DE & NDE) dala housing on metal filling and cutting of bearing size
Cost of Copper Cable 16 Sq.mm for connection lead of 3.3KV grade
Cost of bushing with Copper Studs
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.79 MB
BOQ_367650.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid