| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.9 LAccepted-Finance ARABINDA NAGAR ALIPURDUAR | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | 736122 | ₹37.9 L | L1 | Accepted-Finance Quoted rate stands lowest |
| 2 | L2₹38.2 LRejected-Finance ARABINDANAGAR ALIPURDUAR | ALIPURDUAR | ALIPURDUAR | WEST BENGAL | ₹38.2 L | L2 | Rejected-Finance Quoted rate stands 2nd lowest |
| 3 | L3₹38.6 LRejected-Finance NA | PALWAL | HARYANA | 121004 | ₹38.6 L | L3 | Rejected-Finance Quoted rate stands 3rd lowest |
Updated dates
Tender Value
₹36.8 L
EMD Value
₹73,512
Closing Date
26 May 2026, 2:00 pmClosed
EE Alipurduar Irrigation Division
Oo the EE, Alipurduar Irrigation Division
Palliative restoration work at breach pointsZummatary areaof the Sisamara Embankment along the right bank of the Sisamara River covering a length of 370 meters in Mouza Natunpara under SalkumarI G.P. Block AlipurduarI P.S. Alipurduar and
2026_IWD_1024794_3
WBIW/EE/APD/S NIT-04(e)/2026-27
Open Tender
CIVIL WORKS
15 days
P.S.Alipurduar and District Alipurduar
Please refer Tender documents.
8 documents required · 8 mandatory
₹73,512
Yes
3 Jun 2026
20 May 2026
26 May 2026
20 May 2026
26 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84 m x 0.38 m conforming to BIS : 14252 : 2015 for bank protective works including all cost of cost of transportation on road by all
means,including other incidental charges complete. Note: Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8
including the sub-paragraphs, i.e. 2.8.1 and 2.8.2 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification and Special Terms & Conditions for High Density Polyethylene (HDPE) Bags” in case of use of this item in the estimate. | 48,732 | Each | 27.41 | ₹13,35,744.12 | 1002 |
| 2 | Labour charges for filling HDPE bags with filler materials (earth/sand), machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge (Volume of earth/sand filled bag should not be less than 0.0328 cum). | 48,732 | Each | 14.3 | ₹6,96,867.6 | 1003 |
| 3 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of differentmesh sizes tying & sewing the same maintaning a lap langth of 150 mmall around with 12 SWG G I wire complete, including the cost of supplyof wire netting,fitting etc, complete as per direction of the Engineer - in -charge. e) Mesh size 150 mm x 150 mm with 10 SWG wire | 1,208.79 | Sqm | 110.84 | ₹1,33,982.28 | 1004 |
| 4 | Supply of G.I wire netting of different mesh and made with different SWG G I wire at site as per direction of the Engineer-in-charge. e) Mesh size 150 mm x 150 mm with 10 SWG wire | 5,827.5 | Sqm | 95.34 | ₹5,55,593.85 | 1005 |
| 5 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,
NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking.
b) Beyond 1.00 km and upto 2.00 km | 1,598.41 | Cum | 375.77 | ₹6,00,634.53 | 1006 |
| 6 | Labour charges for constructing sausage crates with 8 gauge / 10 gauge dia GI wire netting of different shape and size in embankment, apron,slope etc. including binding with 12 SWG GI wire and tied at required interval as per direction of the Engineer-in-charge.( rate excludes cost of wire net and laying of boulders but includes cost of binding wire). | 1,599 | Cum | 220.62 | ₹3,52,771.38 | 1007 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.28 MB
form2911.pdf
Tender Documents • 0.60 MB
BOQ_2518486.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid