Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.5 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹32.1 L+₹53,266 (1.69%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹34.0 L+₹2.4 L (7.62%)Rejected-Finance 5 B MOTIMANDIR 736 KASBA PETH PUNE 411011 | PUNE | PUNE | MAHARASHTRA | 411011 | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹34.7 L+₹3.1 L (9.88%)Rejected-Finance 37110 INDUSTRIAL ESTATE KOPARGAON 423 601 | KOPARGAON | AHMEDNAGAR | MAHARASHTRA | 423601 | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹35.0 L+₹3.5 L (10.9%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/s National Traders L5 | Hoonjan Engineering Company L2 | swastik industries L4 | M/s Rajesh G Ramsinghani L6 | Mahesh Traders L8 | M/s REETA ENTERPRISES L7 | M/s Green Leaf Electricals L3 | GULMOHAR CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Conversion of Charpoy GI Pipe 32 mm Newar to Charpoy GI 32 mm plywood top as shown in draing No. FD-220. | |||||||||||
| 1.01 | (i) Removing old, torn Nylon Newar from existing charpoy GI pipe.
(ii) Supply of 7 layer 12mm BWR ISI marked plywood of size 6’6”x3’.
(iii) Supply of 03 (Three) nos of extra stiffener of size 40mmx06mm MS flat iron of 85cm( +/- 2cm) length with three holes of size 10mm (One in the centre and one each on both side of centre hole at a distance of 12’’).
(iv) Fixing of all three M S square pipe 25mm x 25mm iron stiffener into the exiting gaps between long rails which may vary in each case (one in the centre & other two at 6” distance from each short rails) by welding ensuring that the stiffeners fit tight against the inner walls of both long rail. Care must be taken to ensure that stiffeners & upper crest of GI pipe long rails are at same level.
(v) Fixing of 7 layer12mm BWR plywood to the holes made on the M S flat iron stiffener with 9 counter-sunk flat head scres/locks nuts & bolts as directed by Engr-in-Charge.
(vi) Corners of plywood shall be rounded off and suitably holed with rose bit to prevent heads of nuts/bolts from protruding out in case bolts other than flat head are used. All four corners & bottoms of plywood to be chiselled/suitably sheared off to the extent to ensure housing of raised portion of elbow and chuk nuts, to make the plywood seat flat on rails & stiffener evenly throughout. Remaining details all as directed by Engr-in-Charge. | 500 | Each | 1,180 ₹5,90,000 Lowest | 1,420 ₹7,10,000 | 1,500 ₹7,50,000 | 1,572 ₹7,86,000 | 1,500 ₹7,50,000 | 1,600 ₹8,00,000 | 1,580 ₹7,90,000 | 1,342 ₹6,71,000 |
| 1.02 | M&L for dismantling of u/s GI long rail of 25 mm dia from charpoy GI pipe 32 mm dia, supply and fixing of new GI long rail of 32 mm dia medium grade ISI marked duly both end threaded and fixed all as shown on drawing. | 70 | Each | 280 ₹19,600 | 280 ₹19,600 | 190 ₹13,300 | 572 ₹40,040 | 300 ₹21,000 | 650 ₹45,500 | 180 ₹12,600 Lowest | 200 ₹14,000 |
| 1.03 | Dismantling of u/s GI short rail of 32 mm dia from charpoy GI pipe 32 mm dia, providing by cutting, threading both end and forming of short rail from retrieved of 32 mm dia GI long rail obtained from item Sl No 1.02 above and all as shown on drawing. | 70 | Each | 620 ₹43,400 | 220 ₹15,400 | 170 ₹11,900 | 22 ₹1,540 Lowest | 120 ₹8,400 | 25 ₹1,750 | 160 ₹11,200 | 180 ₹12,600 |
| 1.04 | Dismantling of u/s GI leg 32 mm dia from Charpoy GI pipe 32 mm dia, providing by cutting, threading one end and forming of leg from retrieved 32 mm dia GI short rail obtained from item No 1.02 and 1.03. Welding of 3 mm thick 50 mm dia MS plate to the bottom, face of the leg & 25 x 3 mm flat iron made to shape and size of clamp with 16 guage washer at the bottom of clamp for fixing MNF set rest as shown on drawing. | 140 | Each | 40 ₹5,600 | 170 ₹23,800 | 130 ₹18,200 | 22 ₹3,080 Lowest | 100 ₹14,000 | 25 ₹3,500 | 120 ₹16,800 | 150 ₹21,000 |
| 1.05 | S & F in replacement of UNSV GI elbow 3 way of 32 mm dia from charpoy GI pipe 32 mm dia, medium grade with ISI marked shall be provided and rest as shown on drawing. | 80 | Each | 10 ₹800 Lowest | 90 ₹7,200 | 90 ₹7,200 | 92 ₹7,360 | 125 ₹10,000 | 100 ₹8,000 | 75 ₹6,000 | 90 ₹7,200 |
| 1.06 | S & F in replacement of UNSV GI check nut 32 mm dia from charpoy GI pipe 32 mm dia 6 mm thick of best quality as approved by GE and rest as shown on drawing. | 80 | Each | 100 ₹8,000 | 30 ₹2,400 | 30 ₹2,400 | 22 ₹1,760 | 40 ₹3,200 | 30 ₹2,400 | 20 ₹1,600 Lowest | 25 ₹2,000 |
| 1.07 | Supply and replacement of Gutkha made of 1st class hard wood for legs. | 2,000 | Each | 60 ₹1,20,000 | 10 ₹20,000 | 4 ₹8,000 Lowest | 12 ₹24,000 | 10 ₹20,000 | 5 ₹10,000 | 5 ₹10,000 | 14 ₹28,000 |
| 2.00Repair of GI Charpoy Pipe 32 mm with hardtop /plywood top as shown in drawing No. FD-220. | |||||||||||
| 2.01 | Supply & fixing of 7 layer 12mm BWR ISI marked plywood of size 6’6”x3’ all as per drawing and directed by Engr in Charge. | 1,300 | Each | 1,196.94 ₹15,56,018.1 | 1,200 ₹15,60,000 | 1,500 ₹19,50,000 | 1,572 ₹20,43,600 | 1,450 ₹18,85,000 | 1,600 ₹20,80,000 | 1,475 ₹19,17,500 | 1,196 ₹15,54,800 Lowest |
Tender Value
₹35.0 L
EMD Value
₹69,980
Closing Date
6 Jul 2026, 6:00 pmClosed
GE NORTH PUNE
Garrison Engineer North General Cariappa Marg Camp Pune - 411001
GE (N) P/TOKEN- 05 OF 2026-2027 CONVERSION OF CHARPOY GI PIPE NYLON NEWAR/ CHARPOY GI FOLDING NYLON NEWAR INTO PLYWOOD TOP AND REPAIR/ POLISHING TO TRADE PATTERN FURNITURE ITEMS UNDER BSO (N) PUNE AND KOLHAPUR UNDER GE (NORTH) PUNE
2026_MES_770566_1
GE (N) P/TOKEN- 05 OF 2026-2027
Open Tender
Civil Works
Item Rate
240 days
GE NORTH PUNE
Refer tender documents.
8 documents required · 8 mandatory
₹500
GE NORTH PUNE
₹69,980
Yes
30 Jul 2026
8 Jun 2026
8 Jul 2026
8 Jun 2026
6 Jul 2026
22 Jun 2026
9 Jun 2026 - 15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Conversion of Charpoy GI Pipe 32 mm Newar to Charpoy GI 32 mm plywood top as shown in draing No. FD-220. | |||||
| 1.01 | (i) Removing old, torn Nylon Newar from existing charpoy GI pipe.
(ii) Supply of 7 layer 12mm BWR ISI marked plywood of size 6’6”x3’.
(iii) Supply of 03 (Three) nos of extra stiffener of size 40mmx06mm MS flat iron of 85cm( +/- 2cm) length with three holes of size 10mm (One in the centre and one each on both side of centre hole at a distance of 12’’).
(iv) Fixing of all three M S square pipe 25mm x 25mm iron stiffener into the exiting gaps between long rails which may vary in each case (one in the centre & other two at 6” distance from each short rails) by welding ensuring that the stiffeners fit tight against the inner walls of both long rail. Care must be taken to ensure that stiffeners & upper crest of GI pipe long rails are at same level.
(v) Fixing of 7 layer12mm BWR plywood to the holes made on the M S flat iron stiffener with 9 counter-sunk flat head scres/locks nuts & bolts as directed by Engr-in-Charge.
(vi) Corners of plywood shall be rounded off and suitably holed with rose bit to prevent heads of nuts/bolts from protruding out in case bolts other than flat head are used. All four corners & bottoms of plywood to be chiselled/suitably sheared off to the extent to ensure housing of raised portion of elbow and chuk nuts, to make the plywood seat flat on rails & stiffener evenly throughout. Remaining details all as directed by Engr-in-Charge. | 500 | Each | - | - |
| 1.02 | M&L for dismantling of u/s GI long rail of 25 mm dia from charpoy GI pipe 32 mm dia, supply and fixing of new GI long rail of 32 mm dia medium grade ISI marked duly both end threaded and fixed all as shown on drawing. | 70 | Each | - | - |
| 1.03 | Dismantling of u/s GI short rail of 32 mm dia from charpoy GI pipe 32 mm dia, providing by cutting, threading both end and forming of short rail from retrieved of 32 mm dia GI long rail obtained from item Sl No 1.02 above and all as shown on drawing. | 70 | Each | - | - |
| 1.04 | Dismantling of u/s GI leg 32 mm dia from Charpoy GI pipe 32 mm dia, providing by cutting, threading one end and forming of leg from retrieved 32 mm dia GI short rail obtained from item No 1.02 and 1.03. Welding of 3 mm thick 50 mm dia MS plate to the bottom, face of the leg & 25 x 3 mm flat iron made to shape and size of clamp with 16 guage washer at the bottom of clamp for fixing MNF set rest as shown on drawing. | 140 | Each | - | - |
| 1.05 | S & F in replacement of UNSV GI elbow 3 way of 32 mm dia from charpoy GI pipe 32 mm dia, medium grade with ISI marked shall be provided and rest as shown on drawing. | 80 | Each | - | - |
| 1.06 | S & F in replacement of UNSV GI check nut 32 mm dia from charpoy GI pipe 32 mm dia 6 mm thick of best quality as approved by GE and rest as shown on drawing. | 80 | Each | - | - |
| 1.07 | Supply and replacement of Gutkha made of 1st class hard wood for legs. | 2,000 | Each | - | - |
| 2Repair of GI Charpoy Pipe 32 mm with hardtop /plywood top as shown in drawing No. FD-220. | |||||
| 2.01 | Supply & fixing of 7 layer 12mm BWR ISI marked plywood of size 6’6”x3’ all as per drawing and directed by Engr in Charge. | 1,300 | Each | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
BOQ_862923.xls
BOQ • 10.88 MB
tenderdocument05.pdf
Tender Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .