Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -28.00% | ₹7.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.4 L+₹18,890 (2.62%)Admitted-Fee/PreQual/Technical/Finance | -26.11% | ₹7.4 L+₹18,890 (2.62%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8 L+₹79,990 (11.1%)Admitted-Fee/PreQual/Technical/Finance | -20.00% | ₹8 L+₹79,990 (11.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-APS NOT UPLOADED |
Tender Value
₹10 L
EMD Value
₹30,000
Closing Date
18 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CO FOOT BRIDGE AT BONBAG DIALGAM ANANTNAG
2026_RDPR_320612_49
ENIT90of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Office of the Executive Engineer REW Anantnag
₹30,000
21 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Pumping out Dewatering during execution work & diversion of nallah | 50 | KL | 167.8 | ₹8,390 |
| 2 | Earth work in excavation over areas (Exceeding 30cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed | 22.5 | Cum | 187.5 | ₹4,218.75 |
| 3 | Providing and laying of hand Packed stone soling including carriage from approved source to site of work complete job | 2.3 | CUM | 1,174 | ₹2,694.33 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size) with carriage of materails lead of 5 kms | 46.12 | CUM | 6,055.5 | ₹2,79,279.66 |
| 5 | Reinforcement including cutting bending placing in postion complete job | 495 | KGS | 115.2 | ₹57,024 |
| 6 | Reinforced cement concrete work in walls (any thickness) including plinth and string courses, fillets, columns, pillars etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement (1 Cement : 1 Coarse Sand : 2 Crushed Stone aggregate 20 mm nominal size). & caraige upto site complete | 4.5 | CUM | 10,269.56 | ₹46,213.02 |
| 7 | Centering shuttering incl.starightening proping & removal of form work etc Complete job | 113 | SQM | 742.5 | ₹83,902.5 |
| 8 | Supppling and filling of stone soling hand packed behind Rwall including carriage of material upto site of work. | 73.06 | Cum | 1,174 | ₹85,772.44 |
| 9 | Strctural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 3,569 | Kgs | 120.5 | ₹4,30,064.5 |
| 10 | provision for sign board ,photographes etc | 1 | job | 2,440.8 | ₹2,440.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1067108.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .