Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.5 L+₹14,530.35 (10.4%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.7 L+₹30,877 (22.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.9 L
EMD Value
₹3,800
Closing Date
18 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
HALL NO 4, 1ST BLOCK MINI SECTT., KISHTWAR
REFER BOQ
2026_RDPR_318647_26
e-NIT No 69 of REW KISHTWAR 2026-27 Dated. 30.07.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹3,800
Yes
31 Aug 2026
30 Jul 2026
19 Aug 2026
31 Jul 2026
18 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earh Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.All kinds of soil. | 6.11 | cum | 479.3 | ₹2,928.52 |
| 2 | Providing and lying in position cement concrete 1 cement:4fine sand:8graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 0.5 | cum | 5,202.9 | ₹2,601.45 |
| 3 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 4.08 | cum | 5,733.66 | ₹23,393.33 |
| 4 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in:1cement : 4 coarse sand mortar. | 4.59 | cum | 7,877.4 | ₹36,157.27 |
| 5 | Extra for brick work in super strecture | 4.59 | cum | 1,455.65 | ₹6,681.43 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs, etc.(1:1.5:3 mix). | 1.15 | cum | 7,788.4 | ₹8,956.66 |
| 7 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete . | 172.05 | KGS | 115.23 | ₹19,825.32 |
| 8 | Centring and shuttering including strutting, propping etc and removal of the formwork. (a) Foundation, Footing, Base of Columns etc. | 18.4 | sqm | 286.35 | ₹5,268.84 |
| 9 | Centring and shuttering including strutting, propping etc and removal of the formwork Suspended Floor, Roofs, Landing, etc. | 5.23 | sqm | 718.2 | ₹3,756.19 |
| 10 | 15mm thick cement plaster of 1 cement: 4 fine sand mix. | 16.73 | sqm | 306.85 | ₹5,133.6 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1051878.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .