Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
27 Jun 2020, 1:00 pmClosed
EE KWD PWD
N S Building
Installation of Gas based fire suppression system along with Checking Rectification Testing and Recommissioning maintenance_for 3 years_of the existing system at different server room of N S Building
2020_PWD_284711_1
WBPWD/KWD/EE/ eNIQ-01 / 2nd Call / 2020-2021
Open Tender
CIVIL WORKS
Item Rate
1095 days
New Secretariat Building
Please refer Tender documents.
5 documents required · 5 mandatory
₹1.7 L
Yes
29 Jan 2021
11 Jun 2020
29 Jun 2020
17 Jun 2020
27 Jun 2020
17 Jun 2020
Amount
100 Ltrs. Cylinder with Valve Make: EKC/RAMA any PESO approved (Server Room-Doopler Weather Radder Dept)
80 Ltrs. Cylinder with Valve Make: EKC/RAMA any PESO approved (Server Room-Sports 6th Floor)
46.7 Ltrs. Cylinder with Valve Make: EKC/RAMA any PESO approved (NIC 6th Floor)
34 Ltrs. Cylinder with Valve Make: EKC/RAMA any PESO approved (Co-Oprt. 4th Floor - 2) (Boiler 8th Floor N.S. Building - 2)
FK-5-1-12 Make: Siemens/Honeywell/Tyco (Server Room-Doopler Weather Radder Dept - 276) (Server Room-Sports 6th Floor - 132) (NIC 6th Floor - 76) (Co-Oprt. 4th Floor - 48) (Boiler 8th Floor N.S. Building - 52)
Master Cylinder Comprising Below Items: Pr. Guage + Low Pr. Supervisory Switch Electromagnetic Actuator Manual Actuator Pneumatic Actuator Flexible Discharge Hose Flexible Actuation Hose Make: Siemens/Honeywell/Tyco (Server Room-Doopler Weather Radder Dept - 2) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
Slave Cylinder Comprising Below Items: Pr. Guage + Low Pr. Supervisory Switch Pneumatic Actuator Flexible Discharge Hose Flexible Actuation Hose + 1 * Tee + 1 * Elbow 7/16 JIC - 1/8 NPT Make: Siemens/Honeywell/Tyco (Server Room-Doopler Weather Radder Dept - 2) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
Nozzles Make: Siemens/Honeywell/Tyco (Server Room-Doopler Weather Radder Dept - 2) (Server Room-Sports 6th Floor - 2) (NIC 6th Floor - 2) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 2)
SITC of manifold for GBFSS Make:Reputed (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of Sch.40 ASTM106 Gr. MS Seamless Pipe Make:Reputed (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of cylinder bracket/strap Make:Reputed (Server Room-Doopler Weather Radder Dept - 4) (Server Room-Sports 6th Floor - 2) (NIC 6th Floor - 2) (Co-Oprt. 4th Floor - 2) (Boiler 8th Floor N.S. Building - 2)
SITC of Warning Signage Make:Reputed (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of Manual Abort Switch Make: Siemens/Honeywell/Tyco/Ravel (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of Manual Release switch Make: Siemens/Honeywell/Tyco/Ravel (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of 2 Zone Gas release panel along with necessary battery backup Make: Siemens/Honeywell/Tyco/Ravel (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of UL listed Hooter cum Strobe Make: Siemens/Honeywell/Tyco/Securiton (Server Room-Doopler Weather Radder Dept - 3) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of Manual Call Point Make: Siemens/Honeywell/Tyco/Securiton (Server Room-Doopler Weather Radder Dept - 3) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of UL listed & FM approved inteligent addressable 2loop fire alarm panel Make: Siemens/Honeywell/Tyco/Securiton (Server Room-Doopler Weather Radder Dept - 1) (Server Room-Sports 6th Floor - 1) (NIC 6th Floor - 1) (Co-Oprt. 4th Floor - 1) (Boiler 8th Floor N.S. Building - 1)
SITC of UL listed & FM approved inteligent addressable multicriteria detector with base Make: Siemens/Honeywell/Tyco/Securiton (Server Room-Doopler Weather Radder Dept - 40) (Server Room-Sports 6th Floor - 4) (NIC 6th Floor - 4) (Co-Oprt. 4th Floor - 2) (Boiler 8th Floor N.S. Building - 4)
SITC of UL listed & FM approved input output module Make: Siemens/Honeywell/Tyco/Securiton (Server Room-Doopler Weather Radder Dept - 2) (Server Room-Sports 6th Floor - 2) (NIC 6th Floor - 2) (Co-Oprt. 4th Floor - 2) (Boiler 8th Floor N.S. Building - 2)
SITC of 2Cx1.5 sqmm copper multistand FRLS flexible cable along with 20mm dia FRLS PVC conduit Make: Polycab/Finolex/Gloster/(Conduit-Precison MMS) (Server Room-Doopler Weather Radder Dept - 1200) (Server Room-Sports 6th Floor - 300) (NIC 6th Floor - 300) (Co-Oprt. 4th Floor - 200) (Boiler 8th Floor N.S. Building - 300)
Checking, Rectification, Testing and Re-commissioning of Gas Suppression System (Including Cylinder Valve, Pr. Guage + Low Pr. Supervisory Switch, Electromagnetic Actuator, Manual Actuator, Pneumatic Actuator, Flexible Discharge Hose, Flexible Actuation Hose etc.) at Server Room of IT 3rd Floor, Block - 'B', 11th Floor Block 'A', 7th Floor Block - 'A', Police Dept. Ground Floor Block 'A' N.S. Building.
Checking, Clening, Testing and Re-commissioning of necessary field devices (Detectors, Manual Call Point, Hooter cum Strob, Control modules, Manual Release switch and Manual Abort Switch etc.) at Server Room of Labour Department, Block - 'A', 12th Floor N.S. Building.
Master Cylinder Comprising Below Items: Pr. Guage + Low Pr. Supervisory Switch Electromagnetic Actuator Manual Actuator Pneumatic Actuator Flexible Discharge Hose Flexible Actuation Hose Make: Siemens/Honeywell/Tyco
Slave Cylinder Comprising Below Items: Pr. Guage + Low Pr. Supervisory Switch Pneumatic Actuator Flexible Discharge Hose Flexible Actuation Hose + 1 * Tee + 1 * Elbow 7/16 JIC - 1/8 NPT
Round the clock operation (24x7), preventive maintenance and servicing of Gas Suppression System installed at the NS Building premises (3rd Floor 'B' Block IT, 12th Floor 'A' Block, 11th Floor 'A' Block, 7th Floor 'A' Block, 2nd Floor 'C' Block P.E.C. P.W.D and Gr. Floor Police Server Room) by providing 3 (Three) nos. Operators (one Operator in each shift) including preiodical check up all the equipments as per terms and conditions and direction of Engineer-in-charge.
GLYPTIC
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .